O U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 50-293/81-09 Docket No. 50-293 Category C

License No. DPR-35 Priority

--

Licensee:

Boston Edison Comoany E00 Boylston Street Boston, Massachusetts 02199 Facility Name:

Pilgrim Nuclear Power Station Meeting at:

Plymouth, Massachusetts Meeting conducted:

March 11, 1981 bh d v d 2/, /9 g Inspector:

o

. Johnson, Senior Resident Inspector dite signed

.

-- -*

-

M[8 /

,

Approved by:

E.

FBrunner, Reactor Projects date signed

!

ranch #1 Meeting Summary:

Meeting on March 11, 1981~(Report No. 50-293/81-09)

Scope:

Special, announced management meeting to discuss the results of

,

the NRC board convened to evaluate the licensee's perfonnance from January (

1, 1980 to December 31, 1980 as part of NRC's Systematic Assessment of Licensee l

Performance (SALP) program. Areas addressed included Plant Operations; Refueling Operations; Maintenance; Surveillance; Licensed Operator Training; QA/QC; I

Reporting; Committee Activities; Procurement; Fire Protection; ISI/IST; Design Changes and Modifications; Radiation Protection; Environmental Protection; Emergency Preparedness; Radioactive Waste Management; Transportation; Security and Safeguards; and Management Controls.

Results: A summary of the licensee perfonnance evaluation was presented.

Areas of concern were discussed with corporate and site management.

No new enforcement actions were identified. A number of areas where improvements are indicated were identified.

81060B0 $ N

.

-,.-y 4~

, -..-- - - -,

- _.,

._-

,

- - - -

._n..,,, _,

n,

,

_

.

-

,

.

.

DETAILS

1.

Licensee Attendees W. Armstrong, Deputy Nuclear Operations Manager H. Brannan, Quality Assurance Manager R. Cunningham, Staff Assistant - Emergency Planning J. Fulton, Senior Licensing Engineer J. Howard, Vice President - Nuclear R. Machon, Nuclear Operations Manager - Pilgrim C. Mathis, Deputy Nuclear Operations Manager W. Merritt, Nuclear Engineering Manager A. Morist, Nuclear Operations Support Manager E. Ziemanski, Management Services Group Leader 2.

NRC Attendees

E. Brunner, Acting Director, Division of Resident and Project Inspection R. Gallo, Chief, Reactor Project Section #1A B. Grier, Director, Region I J. Johnson, Senior Resident Inspector T. Martin, Acting Director, Division of Engineering and Technical Inspection M. Williams, Licensing Project Manager, NRR 3.

Discussion The NRC Region I evaluation board meeting was discussed, including the assessment period, performance data and the results of the board's evaluation.

(See Enclosure 2)

The licensee's overall performance was considered acceptable.

Five areas will receive increased inspection effort by Region I to confirm that corrective actions already initiated are effective.

These five areas were identified to corporate and site management.

The licensee's long term plans for filling the position of Chief Operating Engineer were also discussed.