Summary of Region 1 810224 Evaluation Board Meeting Re Systematic Assessment of Licensee 1980 Performance
ML20004D174
Person / Time
Site: Pilgrim
Issue date: 04/24/1981
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20004D168 List:
References
NUDOCS 8106080523
Download: ML20004D174 (6)


Text

'

I O

SYSTEMATIC ASSESSMENT OF L'TNSEE PERFORMANCE PILGRIM NUCLEAR POWER STATION REGION I EVALUATION BOARD MEETING Facility:

Pilgrim Nuclear Power Station Licensee:

Boston Edison Company Unit Identification:

Docket No.

License No./Date of Issue 50-293 DPR-35 June 1, 1972 Reactor Information:

NSS General Electric Company i

MWT:

1998 Assessment Period:

January 1, 1980 - December 31, 1980 Evaluation Board Meeting Date:

February 24, 1981 Review Board Members:

B..Grier, Director, Region I J. Allan, Deputy Director, Region I E. Brunner, Chief, RO&NS Branch, Region I R. Carlson, Chief, RC&ES Branch, Region I W. Martin, Chief, Safeguards Branch, Region I P. Knapp, Chief, Radiation Support Section, FF&MS Branch, Region I Other NRC Attendees:

T. Martin, Chief, RPS No. 3, RO&NS Branch Region I J. Johnson, SRI, Pilgrim 8106080 $2-D

,-.-g

-m--

---g,,

s.

y

-z.-

PILGRIM NUCLEAR POWER STATION LICENSEE PERFORMANCE DATA Assessment Period:

January 1, 1980 - December 31, 1980 A.

Number and Nature of Noncompliance Items 1.

Noncompliance Category Violations 2

Infractions 20 Deficiencies 4

( Deviations 2) 2.

Areas of Noncompliance VIO/INF/DEF Plant Operations 0

0 1

Refueling Operations 1

1 0

Maintenance 0

1 1

Surveillance 0

3 0

Licensed Operator Training 0

0 1

QA/QC 0

0 0

Reporting 0

0 1

Committee Activities 0

0 0

Procurement 0

0 0

Fire Protection 0

1 0

ISI/IST 0

0 0

Design Changes and Modification 0

0 0

Radiation Protection 0

8 0

Environrental Protection 0

0 0

Emergency Preparedness 0

0 0

Radioactive Waste Management 0 0

0 Transportation 1

0 0

Security and Safeguards 0

4 0

Management Controls 0

2 0

Totals 2 20 4

(*

2 Deviations are also ettributable to management centrols) l

PILGRIM NUCLEAR POWER STATION LICENSEE PERFORMANCE DATA Assessment Period: January 1, 1980'- December 31, 1980 B.

Number and Nature of Licensee Event Reports 1.

Type of Events A.

Personnel Error 7

B.

Design, Manufacturing, Construction, Installation 9

C.

External 0

D.

Defective Procedure 4

E.

Component Failure 32 X.

Other 43 Total 95 2.

Causally-Linked Events 18 events in 12 groups (not including the initial event or initial information)

Total Number Events / Month TNE = 1.5 events /mo Largest Number Events in the c.. sin LNE = 4 (environmental)

(not including initial event / info) 2 all others Average Time between Events ATBE = 3.4 months for all chains (ABTE for each chain ranged from 3 weeks to 11 months) 3.

Licensee Event Reports Reviewed (Report Nos.)

80-01 through 80-95 C.

Escalated Enforcement Actions 1.

Civil Penalties (a) 2/15/80 Proposed imposition of CP ($5000) for shipping radioactive materials with external radiation levels in excess of regulatory limits.

(b) 7/8/80 Proposed imposition of CP ($13,000) for events surrounding movement of fuel without secondary contain-ment. Amended notice of proposed imposition CP was sent on 10/30/80 associated with an amended notice of violation.

Final response to the licensee is in preparation.

2.

Orders (a)1/2/80 Confirmatory order to implement Category ' A' items in NUREG 0578 (b) 2/21/80 Confirmatory order to install a recirculation pump trip (c) 9/12/80 Order modifying license requiring information per-taining to IEB 79-01.8 be submitted to NRC (d)10/2/80 Confirmatory order to install a scram discharge continuous monitoring system (e)10/24/80 Order modifying license and tech spec's requiring records for environmental qualification and specifying date for full qualification.

3.

Immediate Action Letters (a) 2/27/80 Emergency Preparedness concerns resulting from HP Appraisal Inspection (b) 3/11/80 Fuel handling incident concerns - moved fuel without secondary containment (c) 9/19/80 Operability of the Standby Gas Treatment System following missed surveillance - laboratory analysis of charcoal (d) 10/2/80 Concerns following reactor trip and resulting transient (e)10/8/80 Malfunctions of A and D Safety Relief Valves (SRV) during two recent depressurizations (f)10/31/80 Inadvertent opening of A SRV due to nitrogen supply pressure-(g)11/18/80 Completion of three TMI Category A items (h)11/28/80 Control of overtime hours for licensed operators D.

Management Conferences Held During Past Twelve Months None - Other than site meeting 2/7/80 to discuss facilities for and the assignment of resident inspectors.

E.

Licensee Activities Pilgrim was shutdown from January - May,1980 for a refueling /

modification outage. Major outage activities included NSSS and BOP equipment overhaul, torus modifications, installation of TMI Category 'A' items, an ATWS recirculation pump trip and an ILRT. Critical testing was initiated on May 16, 1980 and power operation was conducted throughout the remainder of 1980 assess-ment period.

Major organizational and personnel changes were implemented in September, 1980.

The position of Nuclear Operations Department Manager was deleted.

The Nuclear Operations Support Department was created with the Nuclear Operations Manager - Pilgrim Station (Station Manager) reporting directly to the Vice President -

Nuclear.

Additional on-site positions were added to assist the Station Manager.

F.

Insoection Activities During the period, 29 inspections have been conducted under the operating reactor program.

These have included 14 routine and 6 special (including the Health Physics Appraisal) inspections by the Region I staff, 2 inspections at the Barnwell, South Carolina waste burial site by the Region II staff, and 7 inspections by the.

Resident Inspector. The assessment period included approximately 1950 inspection man-hours.

The resident inspector's office was established on-site, in June, 1980 with two inspectors assigned and from October,1980 to the present with one inspector assigned.

G.

Investigation Activities Two investigations were performed during this period; one concern-ing allegations of shipped and buried spent fuel assemblies and one concerning miscellaneous allegations (in local newspapers) of alcohol and drug abuse.

These allegations were not confirmed and no items of noncompliance resulted from these investigations.

e g

wy 3 - -

+-

r

PILGRIM NUCLEAR POWER STATION

~

INSPECTION PROGRAM CHANGES Inspection Time and/or Scope Change From Prescribed Inspection Program Functional Area Increasa No Change Decrease 1.

Plant Operations X

l 2.

Refueling Operations x

3.

Maintenance X

4.

Surveillance X

5.

Licensed Operator Training.

X 6.

QA/QC X

7.

Reporting.

X 8.

Committee Activities X

9.

Procurement X

10.

Fire Protection X

11.

ISI/IST X

12.

Design Changes and Modifications X

13.

Radiation Protection X

14.

Environmental Rrotection X

15.

Emergency Preparedness X

16.

Radioactive Waste Management X

17.

Transportation x

18.

Security and Safeguards x

19.

Management Controls X_

Y n dt' Y h m e Y Rpgionay0irector A/L. n,.., 74 199/