U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION I

Report No. 50-293/81-27 Docket No. 50-293 License No. OPR-35 Safeguards Group IV Licensee: Boston Edison Company M/C Nuclear ATTN:

Mr. William D. Harrington Senior, Vice President, Nuclear 800 Boylston Street r

""

Boston, Massachusetts 02199

/

Facility Name: Pilgrim Nuclear Power Station (EJ E ~

'

' (s IUR

-

g y lEg f y -

-EW f[

Q Ir.spection At: Plymouth, Massachusetts w a'.312ATIos)

,

Inspection Conducted: October 13-16, 1981 Date of Last Physical Security Inspection: March 30 - April 3, 1981 e to 8'

'b

%1an

. 'BaTp3f', Physis Protection date In p ctor h

< fl4 c1 ~$ Y R1 chard H. LayPhysicalLPfotection date Inspector d te

-

-

2/

k Approved by:

fysdo /[

_

rW. Devli'n,'A~cting Chief, Safeguards

' da(e Section, Technical Inspection Branch Inspection Summary:

Inspection on October 13-16, 1981 (Report No. 50-293/8127)

Areas Inspected:

Included review of the Physical Security Plan and Implementing Procedures; Site Orientation; Security Organization - (Management), (Personnel),

and (Response); Security Program Audit; Records and Reports; Testing and Maintenance; Physical Barriers - (Protected Areas) and (Vital Areas); Lighting; Assessment Aids; Access Control - (Personnel, (Packages), and (Vehicles); Detection Aids -

(Protected Areas) and (Vital Areas); Alarm Stations; Communications; and followup on items of noncompliance.

The inspection involved 68 inspector-hours by two regional based NRC inspectors.

The inspection began during regular hours; 24 inspector-hours were accomplished during off shift periods.

Results: The licensee was found to be in compliance with NRC requirements WARNING: SwittiincthEr19111metional areas examined during the inspection.

S-F1-2-20 SECTION 147 AIO.'!IC E'EROY ACI l954.

THE INFORitATION ON THIS PAGE IS DEE a g'es

'

V"5263'i90414 820224 APPROPRIATE FOR PUBLIC DISCLOSURE P UkkT 0 E PDR ADOCK 05000293 10 CFR 73.21 aO PDR

_

The report Details Contain (Safequards Informatinni