U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORC" MENT
REGION I
Report No.
50-293/81-11__
Docket No.
50-293 License No.
OPR-35 Safeguards Group IV Licensee:
Boston Edison Company M/C Nuclear 800 Boylston Street
'THIR nortlMENT IS NOT TO BE REPRODUCED Boston, Massachusetts Facility Name:
Pilgrim Nuc. lear Power Station Inspection At:
Plymouth, Massachusetts Inspection Conducted:
March 30-31, April 1-3, 1981 Date of Last Physical Security Inspection:
November 10-14, 1940 Type of Inspection:doutine, Unan>@unced Physical Security Inspectors:
t/sf h 'N W
nd J.
ai '
P sicfl Protection date is 9 - $- //
t acii M. ~Dunlap, Physicaf Protection date Inspector
^
date Approved by:
h
/s
-
/7 T.'Dev in,' Chief, Physical Protection
' /di.te Section Inspection Summary:
Inspection on March 30-31 - April 1-3, 1981 (Report No. 50-293/81-11)
Areas Inspected:
InClJded review of the Physical Security Plan, Revision 6, dated March 1,1981; Security Organization; Physical Barriers (Protected Area);
Physical Barriers (Vital Areas); Security Program Audit; Lighting; Access Control (Identification, Authorization and Badging); Access Control (Search); Access Control (Escorting); Access Control (Vital Areas); Alarm Stations; Detection Aids; Assessment Aids; Communications; Testing and Maintenance; Compensatory Measures; Power Supply; Response; Locks, Keys and Combinations and Records and Reports.
THE INFORMATION ON THIS PAGE IS DEEMED TO BE S-F1-81-75
{}pylof] Copie APPROPRIATE FOR PUBLIC DISCLOSURE PURSUANT TO Co Apr 9 )
_Pages THE REPORT DETAILS CONTAIN 10 CFR 2.790 INF0alLAHON 8108100222 810724 DR ADOCK 05000
r-
.
.
.
.
The inspection involved 92 inspector-hours onsite by two regional based NRC inspectors.
The inspection began during regular hours; 24 inspector-hours were accomplished during offshift periods.
Results: The licensee was found to be in compliance with NRC requirements within the twenty areas examined during the inspection except for the following three items:
1.
Access Control - Failure to enforce identification badge procedures.
2.
Assessment Aids - Inadequate CCTV coverage of th! perimeter and isolation zones.
3.
Records and Reports - Failure to complete alarm response records.
.