U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 50-293/81-28 Docket No. 50-293 License No. DPR-35 Priority
--
Category C
Licensee:
Boston Edison Company M/C Nuclear 800 Boylston Street Boston, Massachusetts 02199 Facility Name:
Pilgrim Nuclear Power Station Meeting At:
Pilgrim Nuclear Power Station Meeting Conducted: July 23, 1981 Prepared By:
b L Nd llll1} Bl R.L. Nimitz, R'sdiation Specialist date signed date signed (
-
Approved By: NAC
_. 6% (L b-17 -P/
P.J. Knapp, Chief, Faciltty Radiological date signed Protection Section Meeting Summary:
Management Meeting on July 23, 1981 (Report No. 50-293/81-28)
Special meeting requested by Region I management to discuss the findings of a recent inspection of the licensee's implementation of certain TMI-2 Lessons Learned Category "A" items relating to post accident sampling and effluent monitoring and to obtain commitments for implementing those items identified as not implemented.
Licensee and Region I management attended the meeting which lasted two hours.
8112080417 811123 PDR ADOCK 05000293 o
-
.
DETAILS 1.
Meeting Attendees Licensee Personnel J. E. Howard, Vice-President Nuclear Power R. D. Machon, Nuclear Operations Manager C. J. Mathis, Deputy Nuclear Operations Manager J. Seery, On-Site Safety and Performance Group Leader E. Zemanski, Management Services - Group Leader R. H. Cunningham, Emergency Preparedness Coordinator T. Soden, Environmental and Radiological Health and Safety Group Leader W. R. Hoey, Senior Radiation Protection Engineer NRC Personnel T. T.
Martin, Acting Director, Division of Engineering and Technical Inspection T. C. Elsasser, Chief, Reactor Projects Section 1B R. J. Bores, Acting Chief, Emergency Preparedness Section J. R. Johnson, Senior Resident Inspector, Pilgrim Station R. L. Nimitz, Radiation Specialist N. M. Terc, Radiation Specialist M. T. Mojta, Radiation Specialist 2.
Meeting Summary NRC Region I management held this management meeting to discuss the findings of a recent inspection of the licensee's implementation of TMI-2 Lessons Learned Category "A" items relating to post accident sampling and effluent monitoring and to obtain commitments for imple-menting those Category "A" items identified as not implemented.
3.
Primary Coolant and Containment Atmosphere Sampling (Category "A" Item 2.1.8 (a))
Regional management described the oeficiencies identified in the area of primary coolant and containment atmosphere sampling, sample transport
"
and sample analysis under accident conditions.
Licensee representatives stated that procedures for chemical and radiological analyses of primary coolant samples taken under accident
-_.. -.
-
.-
.
- _ - -
..
.
...
.
f conditions would be established and implemented by September 1, 1981.
In addition, the licensee's procedure 7.8.4, used to provide guidance for sampling and transport of coolant samples under accident conditions, would be revised by September 1, 1981 to incorporate appropriate means to maintain personnel exposures as low as reasonably achievable.
Regarding primary containment atmosphere samples, licensce'representa-tives stated that procedures would be established and implemented for i
collection, handling and analyses of these samples under accident
',
conditions by September 1, 1981.
4.
Noble Gas Effluent Monitoring (Category "A" Item 2.1.8(b)(1)
Regional management described the deficiencies identified in the area of Turbine Building noble gas effluent monitoring under accident conditions.
Licensee representatives stated that placement of the Turbine Building High Range Noble Gas Monitor would be reviewed by September 1, 1931 to ensure that the position of this monitor permits a' representative indicatinn of noble gas effluent from the Turbine Building during accident conditions.
5.
P.adiciodine and Particulate Sampling
[ Category "A" Item 2.1.8(b)(2))
Regional management described the deficiencies identified in the area of radioiodine and particulate effluent monitoring under accident conditions.
Licensee representatives stated that procedures for collection, handling, transport and analysis nf radioiodine and particulate samples of the Reactor Building Vent, Main Stack and Turbine Building effluents under accident conditions would be established and implemented by September 1, 1981.
6.
Concludina Comments Mr. T.T. Martin stressed the need for maintaining personnel exposure as low as reasonably achievable and within the dose limits of General Design Criterion 19 of Appendix A to 10 CFR 50.
Licensee representatives stated that appropriate personnel will be trained in implementation of the new procedures and in revised procedure 7.8.4 within one week after September 1, 1981.
,