IR 05000272/1980029

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-272/80-29 on 801105-06.No Noncompliance Noted.Major Areas Inspected:Components Associated W/ Component Cooling Water Sys & Reactor Coolant Pump Re IE Bulletin 79-01B
ML18085A512
Person / Time
Site: Salem PSEG icon.png
Issue date: 11/24/1980
From: Ebneter S, Paolino R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18085A511 List:
References
50-272-80-29, IEB-79-01B, IEB-79-1B, NUDOCS 8101140128
Download: ML18085A512 (4)


Text

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Report N ~272/80-29 Docket No. 50-272 License No. DPR-70 Region I Priority Licensee:

Public Service Electric and Gas Company 80.Park.Plaza Newark~ New Jersey 07101 Category Facility Name:

Salem Nuclear Generating Station, Unit 1 Inspection at: Hancocks Bridge, Nevi Jersey Inspection conducted:

November 5-6, 1980 Inspectors:

Approved by: ~J~

S. D. E~~ief, Support Section #2, Inspection Summary:

inspector Engineering RC&ES Branch c

11-:Jl(-gD date signed*

date signed Inspection on November 5-6, 1980 (Report No. 50-272/80-29)

Areas Inspected: Routine, announced inspection by a regional based inspector of components associated with the component cooling Water System, Reactor Coolant Pump, Drain Tank, Letdown Heat Exchanger Flow and Discharge Control Panels to verify component installation as identified and reported by the licensee in response to NRC Bulletin No. 79-01 The inspection involved 12 inspection hours on site by one NRC regional based inspecto Results:

No items of noncompliance or deviations were identifie :fllO 114 o \\ 2_Z

"DETAILS Persons Contacted Public Service*Electric*and*Gas.. Company*

  • H. Lowe," Quality Assurance Engineer
  • H. Midura, Station Manager H. Reuther, Resident Quality Assurance Manager R. Scaletti, Safety Supervisor

R. Silverino, Assistant to Station Manager U.S. Nu cl ear Regulatory Comrilission

  • Wm. Hill, Resident Insoector
  • denotes personnel present at the exit intervie.

NRC Bulletin No. 79-0lB CoMnonent Installation Verification*

The inspector reviewed Piping and Instrumentation Diagrams (P&ID's),

Arrangement Di a grams and Wiring Di a grams of se 1 ect components ins ta 11 ed

.

. outside conta,inment to d~termine by visual observation whether these components are the components reported by the licensee as being installed.in the respective are Components examined for this determination were selected from the licensee's submittal dated June 2, 1980 containing the master listing of Environmental Qualification of Electrical Equipmen Documentation and components selected include the following:

Reactor Coolant Pump, Drain Tank and Excess Letdown Heat Exchanger Flow and Discharge Controls Panel 311-1, Arrangement Drawing N *205690, revision 19

Reactor Coolant Pump, Drain Tank and Excess Letdown Heat' Exchanger Flow and Discharge Control Panel 311-1, Wiring Diagram 218912, revision

Electrical Penetration _types and System Use, Arrangement Drawing 222701, revision 3 Instrument Panel Location - Elevation 122' - 0 (Auxiliary Bldg.),

Arrangement Drawing 211678, revision ~~----

'

~.

ComponentCooling Surge Tank Level, Arrangement and Wiring Diagr~m 231162, revision 1 Instrument Panel Locatio Elevation 78

- 0

.

1 and 84

- 0 11 (Auxiliary Bldg.) Arrangement Drawing 211676, revision 1 Component Cooling Water Inlet and Outlet Control, Piping and Instrument Arrangement Drawing 240714, revision Reactor Protection and Process Control Systems Auxiliary Coolant Interconnections. Wiritig Diagram 220015, revision 5 Component Cooling Syste Instrument Schematic Drawing 207516, revision 1 Instrument Panel Location Elevation 100

- 0 11 and 111

- 0

, Arrangement Drawing 211677, revision Electrical Penetration 1-43, Connection Diagram 222706, revision Control Panel Nos. 311-1, 401-1 and 743-Flow Transmitter Nos. FT-601A and FT-6018, Level Transmitter Nos. LT-628A and LT-6288 Solenoid Valves No. SV-688 and SV~16 Penetration No. 1-43 The inspector verified that the component installation and identification is as r~ported by the licensee in response to NRC Bulletin No. 79-01 No items of noncompliance or deviations were identifie.

Safety Evaluation Report The information gathered during this inspection will be used as a data base to assist in the overall evaluation of the test data and details provided by the licensee in their report submitta The final evaluation will be documented in a Safety Evaluation Report (SER) that is to be written for this licensee. The SER is planned to be issued for this site by February 198 ~

.*..,_

4 Exit Interview The inspector met with licensee representatives (denoted in Details, paragraph 1) at the conclusion of the inspection on November 6, 198 The inspector summarized the purpose and the scope of the inspection and the findings.