IR 05000272/1980017

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-272/80-17 & 50-311/80-13 on 800714-18. Noncompliance Noted:Failure to Keep Isolation Zone Clear of Structures & Failure to Secure Opening in Auxiliary Relay Room Wall.Details Withheld (Ref 10CFR2.790)
ML18085A230
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/20/1980
From: Bailey R, Devlin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18085A228 List:
References
50-272-80-17, 50-311-80-13, NUDOCS 8011180450
Download: ML18085A230 (1)


Text

...

'..:.

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION I

50-272/80-17 Report N /80-13 50-272 Docket N.....:..::~..:..::...----

DPR-70 license N DPR-75 Safeguards Group __

IV __

licensee:

Public Service Electric and Gas Company 80 Park Place

. Newark~ New Jersey 07101 Facility Name:

Salem Nuclear. Generating Station, Units 1 and 2 Inspection At:

Hancocks Bridge, New Jersey Inspection Conducted: July 14-18~ 1980

---=---___;.. _______.;..__ ___ __

Date of last Physical Security Inspection Visit:

May 19-21, 1980 Approved by:

s W

.* Devlin, Chief, Security and I vesti aation *Section., Safeguards Branch Inspection Summary: -

date Inspection on July 14-18,1980 (Combined Inspection Reports Nos. 50-272/80-17/50~311/80-13 Areas Inspected: Physical security inspection, of the approved physical security plan, security program audit, security organization, ph¥sical barriers (PA/VA), lighting, access control (search) (escorting), (vital areas}r alann-station, detection aids, assessment aids;, communi.cations, testing and maintenance, compensatory rrieasures, power supply, res.ponse, locks, keys and combinations and records and report The inspection involved 39 inspector-hours onsite by a regional based inspecto Th~

inspection was begun duringregular hour Results: The licensee was found to be in noncompliance with the Physical Security

~lan and NRC requirements within three{3) of th~ nineteen areas examined during the inspection, j.e., (a) failure to keep the isolation zone clear of structures or material, (b) failure to secure an opening in the wall of the control and auxiliary relay room, (c) fa.ilure to secure an opening above a partition that was part of a vital area barrie Two unresolved items are:

(a)bullet resistant requirements at the contractor access control point, and (b) recording exit times from normally unoccupied vital area Region 1 Form 167 (August 1979)