Text
J
- O U. S. NUCLEAR REGULATORY COMMISSION 0FFICE OF INSPECTION AND ENFORCEMENT
'-
REGION I
50-272/80-15 Report No. 50-311/80-08 50-272 DPR-70 Docket No.
50-311 License No.
DDR-75 Safeguards Group IV Licensee:
Public Service Electric and Gas Comoany 80 Park Place Newark. New Jersev 07101 Facility Name:
Salem Generating Station, Units 1 and 2 Inspection At:
Hancocks Bridae, New Jersey Inspection Conducted:
May 19-21, 1980 Date of Last Physical Security Inspection Visit:
January 21-25, 1980 Type of Inspection:
Special. Pre Fuel Load-Physical Security Inspection Inspectors:
k, M t?nw2 W 7, M8d E. W. Jone Physical Security Inspector date'
date date Approved by
// '
//,/7[f/
. W. Devlin, Chief, Security and Investigation dats USection,SafeguardsBranch Inspection Summary:
Inspection on May 19-21,1980 (Report Nos. 50-272/80-15; 50-311/80-08)
Areas Inspected: Special inspection of Security Plan; Physical Barriers (protected area); Physical Barriers (vital area); Assessment Aids; Detection Aids; Alarm Stations and confirmation of actions taken to correct items of noncompliance reflected in Inspection Report 50-272/80-02.
The inspection involved 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> onsite by one regional based NRC inspector.
Results: The licensee was found to be in compliance within the six areas examined.
doo8140 1R Region I Form 167 (August 1979)
-
_