s. NUCLEAR REGULATORY COMMISIN OFFICE OF INSPECTION AND ENFORCEMENT
REGION I
Report N /80-02 Docket N License N DPR-70 Safeguards Group IV ----
Licensee:
Public Service Electric and Gas Company A'f'F! Mr. F. W. 3clt11eider, Vice flt es ide11t - Production 80 Park Place Newark, New Jersey 07101 Facility Name:
Salem Nuclear Generating Station, Unit 1 Inspection At:
Hancocks Bridge, New Jersey-Inspection Conducted: January 21-25, 1980 Date of Last Physical Security Inspection Visit: August 28-30, 1979 Type of InspectiRp:
Unannounce~ Physical Security Inspectors:
/~ sd ( !,.J ('..,
Rolantl\\J~ailey, Physical Security Inspector I date date Approved b I
s W. Devlin, Chief S curity and Investigation Section, Safeguards Branch Inspection mary:
Unannounced Ph sical Securit Ins ection on Januar 21-25, 1980 Re ort No. 50-272/80-02 Areas-Inspected:
An unannounced physical security inspection, by a regional based inspector, of the approved physical security plan, security program audit, security organization, physical barriers (PA/VA}, lighting, access control (search)(escorting), (vital areas}, alann station, detection aids, assessment aids, corrmunications, testing and maintenance, compensatory measures, power* supply, response, locks, keys and combinations and records and report The inspection involved 34 inspector-hours onsit The inspection was begun during regular hours *
Region I Form 167 (August 1979)
S00622 0369
-*.. "'
Results: The licensee was found to be in noncompliance with the Physical_
Security Plan and NRC requirements within three (3) of the nineteen areas examined during the inspection, i.e. (a) Failure to forward a change to the Physical Security Plan to the NRC as required by 10 CFR 50-54(p).
(b) Failure to assign watchmen only those responsibilities outlined in the pla (c)
Failure to revalidate vital area access*
control to all vital areas every 31 days.