IE Insp Rept 50-272/80-09 on 800226.No Noncompliance Noted. Major Areas Inspected:Corrective Actions Re Simultaneous Removal from Svc of All Three Emergency Diesel Generators on 791031 & Physical Security Matters
ML18082A460
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/28/1980
From: Brunner E, Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18082A459 List:
References
50-272-80-09, 50-272-80-9, NUDOCS 8005270035
Download: ML18082A460 (3)


Text

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Report N /80-09 Docket N __.......................... __ _

Region I License N DPR-70 Priority --------

Category C


Licensee:

Pub 1 i c Service Electric and Gas Company 80 Park Place Newark, New Jersey 07101 Facility Name:

Salem Nuclear Generating Station - Unit No. 1 Meeti'ng' a*t:, NRC Region I, King of Prussia, Pennsylvania Meetfng: conducted:' Februa y_

Reporting. 'Inspector~: rlf-+-~~~-;::T"""';;I'-::---;::---:--

> -

Reactor Projects Approved by:

MeetingJ: Summary:

Branch runner, Chief, Reactor Operatioss

~uclear Support Branch 3~Z~-8o date signed date signed

.

date~ned 3;(~

1 date1 signed

~anagement Meeting, February 26, 1980 (Inspection Report No. 50-272/80-09)

Enforcement conference held in NRC Regi'on*r between representatives of Public Servtce Electric and. Gas Company. and Region I staff to discuss: corrective actions relative to the simultaneous removal from service of all three emergency diesel generators on October 31, 1979; plant physical security matters; and radiatton protection matters. Twelve hours of Region I staff time were expended for this meeting~

Region I Form 12 (Rev. April 77)

  • _RETAILS Attendees Public Service Electric and Gas Company R. Evans, Assistant Quality Assurance Manager H~ Heller, Manager, Nuclear Operations F. Librizzi, General Manager, Electric Production H. Midura, Manager, Salem Nuclear Generating Station L. Miller, Performance Engineer, SNGS P. Moeller, Staff Engineer

. R. Swetnam, Senior Performance Supervisor, Radiation Protection, SNGS

. ~RC Region I - Office of Inspection & Enforcement J. M. Allan, Deputy Director (Acting Director)

.

J. w. Devlin, Chief, Security & Investigation Section, Safeguards Branch R. R. Keimig, Chief, Reactor Projects Section No. 1, RO&NS Branch P. J. Knapp, Chief, Radiation Support Section, FF&MS Branch W. G. Martin, Chief, Safeguards Branch L. J. Norrholm, Senior Resident Inspector, SNGS G. H. Smith, Chief, Fuel Facility & Materials Safety Branch Purpose of Meeting The purpose of this. meeting was to discuss the 1icensee 1 s proposed corrective.

actions relative to an event which occurred on October 31, 1979, while Salem Unit 1 was in cold shutdown (Mode 5). The event concerned the simul-taneous removal from servic*e of all three emergency diesel generators by an unlicensed member of the operating staff in order to perform routine main-tenance. Technical Specifications require a minimum of two operable diesel generators in this mod This. event was reported to NRC by the licensee in Licensee Event Report 79-71/03, dated November 30, 1979 and was reviewed during a Region I inspection conducted on November 18 - December 15, 1979 and January 9, 1980 (Combined Inspection Report Nos. 50-272/79-32 and 50-311/79-37).

.

.

.

Due to the potentially serious nature of this event, enforcement correspon-dence dated February 11, 1980 from the Director, Division of Reactor Operations Inspection,. Office of Inspection and Enforcement, transmitted a Notice of Violation citing an item* of noncompliance at the infraction level and detailing the failure to fallow procedures which lead to this even The NRC's concern related to an intentional total loss of emergency power capability was also emphasized and the licensee was directed to address the above item and outline corrective measures to prevent recurrence in a meeting with the Director, Region.

!

  • L

Other matters addressed.by the Region I.staff during this meeting were plant physical security and radiation protection. These matters are discussed in Inspection Report No. 50-272/80-02 and Inspection Report No. 50-272/80-03, respectivel Licensee's Proposed Correctiv~ A~tion Conc~rning the Diesel Generator Event The licensee acknowledged,the item of noncompliance and provided the following information concerning the proposed corrective actions to prevent recurrence:

Station practices have been changed to permit only the licensed Shift Supervisor or Senior Shfft Supervisor to authorize tagging equipment. ~ut of ser.vice. Restoring equipment control to a senior licensed individual should prevent recurrence of this type of even A training program has beerr initiated to train non*licensed equipment and* utility operators in system interactions, field. operations, and operability requirement With equipment control restored to the Shift Supervisor* as required by procedure, the licensee stated that compliance has been achieve The Region I staff had no further questions regarding this matter at this time. A review of the final corrective actfons will -be conducted when the licensee submits the formal response to the Notice of Violation.