UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 4, 2012 Mr. Chris Wamser Site Vice President Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station 320 Governor Hunt Road Vernon, VT 05354

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

VERMONT YANKEE NUCLEAR POWER STATION (REPORT 05000271/2012006)

Dear Mr. Wamser:

On August 14, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Vermont Yankee Nuclear Power Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011, through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

This assessment reflects the integration of the Security Cornerstone into the Reactor Oversight Process (ROP) performance assessment program governed by Inspection Manual Chapter (IMC) 0305, Operating Reactor Assessment Program.

The NRC determined the performance at Vermont Yankee Nuclear Power Station during the most recent quarter was within the Licensee Response Column of the NRC=s ROP Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns, and TI-188, Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. Furthermore, the NRC will perform inspection procedure 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, in April 2013. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

C. Wamser 2 In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-5200 with any questions you have regarding this letter.

Sincerely,

/RA/

Dr. Ronald R. Bellamy, Chief Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-271 License Nos.: DPR-28

Enclosure:

Vermont Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML12244A405 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer RBellamy DATE 08/28/12 08/31/12 Page 1 of 2 Vermont Yankee 08/30/2012 12:32:50 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 9/24EXM - INITIAL OPERATOR LICENSING EXAM 5 1 07/30/2012 08/03/2012 U01851 FY12-VERMONT YANKEE INITIAL OPERATOR LICENSING EXAM 1 08/27/2012 08/31/2012 U01851 FY12-VERMONT YANKEE INITIAL OPERATOR LICENSING EXAM 1 09/24/2012 10/05/2012 U01851 FY12-VERMONT YANKEE INITIAL OPERATOR LICENSING EXAM 7111111B - VY ON-SITE REQUAL INSP W/ P/F RESULTS 2 1 07/23/2012 07/27/2012 IP 7111111B Licensed Operator Requalification Program 71124 - RAD AIRBORNE & DOSE ASSESSMENT & ISFSI 1 1 07/09/2012 07/13/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 07/09/2012 07/13/2012 IP 71124.04 Occupational Dose Assessment TI 182 - DEGRADATION OF UNDERGROUND PIPING 1 1 07/16/2012 07/20/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping EP PROGR - EP PROGRAM INSPECTION 1 1 09/10/2012 09/21/2012 IP 7111402 Alert and Notification System Testing 1 09/10/2012 09/21/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 09/10/2012 09/21/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 92702 - FOLLOWUP TO CONFIRMATORY ORDER (QA/QC) 1 1 10/01/2012 12/31/2012 IP 92702 Followup On Corrective Actions For Violations And Deviations 92702 - CONF. ORDER FOLLOWUP RIVERBEND ADR QA/QC 1 1 10/01/2012 12/31/2012 IP 92702 Followup On Corrective Actions For Violations And Deviations TI-187 - FLOODING WALKDOWNS 1 1 10/01/2012 12/31/2012 IP 2515/187 Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns IP71152 - PIR SAMPLE - TAGOUT EVENTS 1 1 10/15/2012 10/16/2012 IP 71152-Reviews In-depth Reviews 71124 - HP & PI VERIFICATION 1 1 11/13/2012 11/16/2012 IP 71124.02 Occupational ALARA Planning and Controls 1 11/13/2012 11/16/2012 IP 71124.05 Radiation Monitoring Instrumentation 1 11/13/2012 11/16/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 11/13/2012 11/16/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent TI-187 - FLOODING WALKDOWNS 1 1 01/01/2013 04/02/2013 IP 2515/187 Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns 71124 - HP 1 1 03/11/2013 03/15/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/11/2013 03/15/2013 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Vermont Yankee 08/30/2012 12:32:50 Inspection / Activity Plan Report 22 07/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111108G - INSERVICE INSPECTION 1 1 03/25/2013 03/29/2013 IP 7111108G Inservice Inspection Activities - BWR 60855 - ISFSI OPERATIONAL INSPECTION 1 1 04/16/2013 04/16/2013 IP 60855 Operation Of An ISFSI 1 04/16/2013 04/16/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 71124.07 - REMP 1 1 04/22/2013 04/26/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/22/2013 04/26/2013 IP 71124.07 Radiological Environmental Monitoring Program 71124.08 - RADWASTE 1 1 05/13/2013 05/17/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EP EX - EP EXERCISE EVALUATION 5 1 06/03/2013 06/07/2013 IP 7111401 Exercise Evaluation 1 06/03/2013 06/07/2013 IP 7111404 Emergency Action Level and Emergency Plan Changes PI&R - PI&R 4 1 06/03/2013 06/07/2013 IP 71152B Problem Identification and Resolution 1 06/17/2013 06/21/2013 IP 71152B Problem Identification and Resolution 71124 - HP 1 1 08/12/2013 08/16/2013 IP 71124.02 Occupational ALARA Planning and Controls 1 08/12/2013 08/16/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 08/12/2013 08/16/2013 IP 71124.04 Occupational Dose Assessment 1/6 EXM - VERMONT YANKEE INITIAL EXAM 4 1 12/02/2013 12/06/2013 U01877 FY14-VY INITIAL OPERATOR LICENSING EXAM TRI FI - TRIENNIAL FIRE PROTECTION INSPECTION 4 1 09/09/2013 09/13/2013 IP 7111105T Fire Protection [Triennial]

1 09/23/2013 09/27/2013 IP 7111105T Fire Protection [Triennial]

71124.06 - RETS & RAD SAFETY PI VERIFICATION 1 1 11/18/2013 11/22/2013 IP 71124.05 Radiation Monitoring Instrumentation 1 11/18/2013 11/22/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 11/18/2013 11/22/2013 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.