UNITED STATES N UCLEAR REGU LATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 September 1, 2011 Mr. Michael Colomb Site Vice President Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station 320 Governor Hunt Road Vernon, W 05354

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

VERMONT YANKEE NUCLEAR POWER STATION (REPORT 0500027 1 t201 1 006)

Dear Mr. Colomb:

On August 10, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of the Vermont Yankee Nuclear Power Station. The NRC reviewed the most recent quarterly performance indicators (Pls) in addition to inspection results and enforcement actions from July 1,2010 through June 30, 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information, A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined the performance at Vermont Yankee Nuclear Power Station during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility. In addition, we have continued our enhanced oversight of Entergy's performance relative to addressing issues associated with the onsite ground water contamination, as described in the ROP Deviation Memorandum dated April 5, 2010 (ML100960321). Reviews related to the Deviation Memorandum are near completion, and will be documented in NRC inspection report 0500027112011010.

Given the uncertainty regarding plant operations beyond March 2012 due to ongoing reviews and legal proceedings, NRC staff have begun conducting performance reviews for Vermont Yankee at the end of the first and third calend ar yeat quarters, in addition to the traditional mid- and end-of-cycle performance reviews. The purpose of these interim performance reviews is to perform an overall review and assessment of Vermont Yankee performance during the previous four calendar year quarters. Accordingly, the NRC conducted its first quarterly performance review of Vermont Yankee in May and determined that there were no issues associated with the plant's safety performance in the first quarter 2011that warranted additional attention by the NRC and that ROP baseline inspections would continue at your facility. This review was conducted using guidance

M. Colomb 2 contained in NRC Inspection Manual Chapter (lMC) 0305, "Operating Reactor Assessment Program." A similar review will be conducted in the November 2011 timeframe for plant performance during the third quarter o'f 2011.

The enclosed inspection plan lists the inspections scheduled through December 31,2012. ln addition to the baseline inspections, we have scheduled a review of your proposed commitments made during the license renewal application process, This activity will take place the week of October 17,2011, and will include an inspector review of Aging Management Program (AMP) implementation. This review will be conducted using IMC 71003, "Post-Approval Site Inspection for License Renewal." An additional inspection of license renewal commitments will be conducted the week of January 23,2012. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

ln the days following the Fukushima Daiichi nuclear accident in Japan, the Commission directed the staff to establish a senior-level agency task force to conduct a methodical and systematic review of the NRC's processes and regulations to determine whether the agency should make additional improvements to its regulatory system. The NRC has since completed Temporary Instruction (Tl) 183, "Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event," and Tl-184, "Availability and Readiness Inspection of Severe Accident Management Guidelines (SAMGS)" at your facility.

Results of these inspections can be found here: http:/www,nrc,gov/iapan/iapan-activities.html, Additionally, on May 11, 2011, the agency issued NRC Bulletin 2Q11-01, "Mitigating Strategies," to confirm compliance with Order EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hhx2), and to determine the status of licensee mitigating strategies programs. On July 12, 2011, the NRC's Task Force made its recommendations to the Commission in its report, "Recommendations for Enhancing Reactor Safety in the 21" Century: The Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident." The NRC is currently reviewing the Task Force's recommendations to determine what additional actions may be warranted, ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readino-rm/adams.html (the Public Electronic Reading Room).

M. Colomb 3 Please contact Dr. Ronald Bellamy at (610)337-5200 with any questions you have regarding this letter.

pe-(^

William M. Dean Regional Administrator Region I Docket Nos. 50-271 License No. DPR-28

Enclosure:

Vermont Yankee lnspection/Activity Plan cc wiencl : Distribution via ListServ

M. Colomb 3 Pease contact Dr. Ronald Bellamy at (610)337-5200 with any questions you have regarding this letter.

Sincerely,

/RA by David C. Lew Acting For/

William M. Dean Regional Administrator Region I Docket Nos. 50-271 License No. DPR-28

Enclosure:

Vermont Yankee Inspection/Activity Plan cc w/encl: Distribution via ListServ Distribution Mencl: (via email)

W. Dean, RA E. Keighley, DRP N. McNamara. SLO D. Lew, DRA K. Dunham, DRP D. Tifft, SLO D. Roberts, DRP S. Rutenkroger, DRP, SRI RidsNrrPMVermontYankee Resource J. Clifford, DRP S. Rich, DRP, Rl RidsNrrDorlLl 1 -1 Resource C. Miller, DRS A. Rancourt, DRP, OA ROPassessment Resource P. Wilson, DRS DRS Branch Chiefs (6) RidsNrrDirslpabResource J. McHale, RIOEDO D. Screnci, PAO ROPreports Resource R. Bellamy, DRP N. Sheehan. PAO T. Setzer, DRP R. Barkley, ORA SUNSI Review Complete: TCS (Reviewer's Initials) ML112430529 DOCUMENT NAME: SIROP.12 Mid-Cycle Review\Branch S\\MW Mid-Cycle Letter 2011,docx After declaring this document "An Official Agency Record" !!.:g!!! be released to the Public.

To receive a copy of this document, indicate in the box: 'C" = Copy without attachmenVenclosure "E" = Copy with attachmenUenclosure "N" = No copy

)FFICE RI/DRP ILPH RI/DRP RI/DRP RI/ORA NAME ISetzer/TCS RBellamy/TCS for DRoberts/DJR WDean/DCL for DATE )8t31 t1l )8t31 t11 J8131111 08t31t11 OFFICIAL RECORD COPY

Page 1 of2 Vermont Yankee 0812512011 14:33:49 Inspection / Activity Plan Report 22 0710112011 -'t213112012 Unit No. of Staff Number on Site 7111121 - CDBI 06t27t2011 O7tO1l2O11 lP 7111121 Component Design Bases Inspection 71124.OA . GROUND WATER TEAM INSPECTION 06t14t2011 O7lO1l2O11 lp 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7'1124 - RETS INSPECTION 06t2712011 O7tO1l2O11 tP 71124.0G Radioactive Gaseous and Liquid Effluent Treatment 71124 . HP.ACCESS / ALARA/ PI VERIFICATION 1 10t03t2011 10t07t201'l lP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10103120'11 10t07t2011 lP 71124.02 Orcupational ALARA Planning and Controls 1 1010312011 10t07t2011 lP 71 151-OR01 Occupational Exposure Control Effectiveness 1 10t03t2011 10t07t2011 lP 71 151-PR01 RETS/ODCM Radiological Effluent 7111I08G .INSERVICE INSPECTION 10t1012011 10t14t2011 lP 71 11108G Inservice Inspection Activities - BWR 71003 - LR COMMITMENTS INSP 1011712011 10t21t2011 lP 71003 Post-Approval Site Inspection for License Renewal 10t17t2011 10t28t2011 lP 71003 PosFApproval Site Inspection for License Renewal 71003 . LR COMMITMENTS INSP 01t23t2012 01t27t2012 lP 71003 Post-Approval Site Inspection for License Renewal o2t06t2012 o2t10t2012 lP 71003 Post-Approval Site Inspection for License Renewal 9/24EXM VY INITIAL EXAM o8t27t2012 08t31t2012 U01851 FY12-VERMONT YANKEE INITIAL OPERATOR LICENSING EXAM 09t24t2012 10t05t2012 U01851 FY12-VERMONT YANKEE INITIAL OPERATOR LICENSING EXAM 7111107T - TRIENNIAL HEAT SINK o5t21t2012 0512512012 lP 7111107f Heat Sink Performance 71124 - HP INSTRUMENT o5t21t2012 05t25t2012 lP 71124.05 Radiation Monitoring Instrumentation MODS . PERMANENT PLANT MODIFICATIONS 0610412012 06t08t2012 lp 7111117f Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications o6t18t2012 06t22t2012 lp 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 711'11118 . VY ON.SITE REQUAL INSP w/ P/F RESULTS 0811312012 08t17t2012 lP 7111111B Licensed Operator Requalification Program EP PROGR . EP PROGRAM INSPECTION 0811312012 0811712012 lP 7111402 Alert and Notification System Testing 0811312012 08t17t2012 lp 7111403 Emergency Preparedness Organization Staffing and Augmentation System lhis report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures

Page 2 of 2 Vermont Yankee 0912512011 14:33:49 Inspection / Activity Plan Report 22 07t01t2011 - 1213112012 Unit No. of Staff Number on Site EP PROGR - EP PROGRAM INSPECTION 08t1312012 08t17t2012 tP 7111404 Emergency Action Level and Emergency PIan Changes ogl13l2o12 O8l17t2112 lP 7111405 correction of Emergency Preparedness weaknesses and Deficiencies 71124 - HP-ACCESS CONTROL

,l OBtZOl2Olz OBt24t2O12 lP 71124.01 Radiological Hazard Assessment and Exposure Controls I OBl2Ot2O12 OBl24t2O12 lP 71124.02 Occupational ALAM Planning and Controls 1 OBt2Ol2O12 OBI24\2O12 lP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 o8l2ot2o12 0812412012 lP 71124.04 occupational Dose Assessment 71124 . TRANSPORTATION I 1012212012 '10126t2012 lP 25151173 Review of the lmplementation of the Industry Ground Water Protection Voluntary Initiative 1 1012212012 10t26t2012 tP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 10122i2A12 10t26t2012 tP 71151-oR01 Occupational Exposure Control Effectiveness 1 1012212012 10t26t2012 tP 71151-PRo1 RETS/ODCM Radiological Effluent

-his report does not include INPO and OUTAGE activities.