Mid-Cycle Performance Review and Inspection Plan 2010 - Vermont Yankee Nuclear Power Station
ML102440567
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/01/2010
From: Dapas M
Region 1 Administrator
To: Michael Colomb
Entergy Nuclear Operations
Jackson, D E RI/DRP/PB5/610-337-5306
References
Download: ML102440567 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA. PA 19406-1415 September It 2010 Mr. Michael Colomb Site Vice President Entergy Nuclear Operations, Inc.

Vermont Yankee Nuclear Power Station Vernon, VT 05354

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN VERMONT YANKEE NUCLEAR POWER STATION

Dear Mr. Golomb:

On August 12, 2010, the Nuclear Regulatory Commission (NRC) staff completed its performance review of the Vermont Yankee Nuclear Power Station. Our technical staff reviewed performance indicators (Pis) for the most recent quarter and inspection results for the period from July 1,2009, through June 30, 2010. The purpose of this letter is to inform you of the results of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Related Information" will include the security cornerstone review and resultant inspection plan.

Safety performance at Vermont Yankee for the most recent quarter was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety Significance (Green) and all Pis indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct Reactor Oversight Process (ROP) baseline inspections at your facility. In addition, we plan to continue enhanced oversight of Entergy's performance relative to addressing issues associated with the on site ground water contamination, as described in the ROP Deviation Memorandum dated AprilS, 2010 (ML100960321)1. Reviews and inspections related to the Deviation Memorandum are currently ongoing and will continue through calendar year 2010. We will evaluate the need for continuing this enhanced oversight for calendar year 2011 based on the status of Entergy's actions to address the onsite ground water contamination.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31,2011. In addition to the baseline inspections, an inspection related to the operation of the independent spent fuel storage facility is scheduled. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are I Designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) accession number. Documents referenced ill this Jetter are publicly-available using the accession number in ADAMS.

M. Colomb 2

not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronicaHy for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rmladams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Donald Jackson at 610-337-5306 with any questions you may have regarding this letter or the inspection plan.

Sincerely, Marc L. Dapas Acting Regional Administrator Region I Docket Nos.

50-271 License No.

DPR-28

Enclosure:

Vermont Yankee Inspection/Activity Plan cc w/encl:

Distribution via ListServ i

M. Colomb 2

not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC1s document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Donald Jackson at 610-337-5306 with any questions you may have regarding this letter or the inspection plan.

Sincerely, IRA!

Marc L. Dapas Acting Regional Administrator Region I Docket Nos.

50-271 License No.

DPR-28

Enclosure:

Vermont Yankee Inspection/Activity Plan ccw/encl:

Distribution via ListServ Distribution w/encl:

M. Dapas, Acting RA T. Setzer, DRP R. Bal1<ley. ORA D. lew, Acting ORA D. Dodson, DRP N. McNamara, SLO J. Clifford, DRP D. Spindler, DRP, SRI D. Tifft, SLO D. Coll1ns, DRP H. Jones, DRP, R!

A. Klett, NRR D. Roberts, DRS A. Rancourt, DRP, OA RidsNrrPMVermontYankee Resource P. Wilson, DRS DRS Branch Chiefs (6)

RidsNrrDorlU1-1 Resource L. Trocine, RI OEDO D. Serenei, PAO ROPreportsResource@lnrc.gov D. Jackson, DRP N. Sheehan, PAD RidsNrrDirslpabResource@lnrc.gov SUNSI Review Complete: TCS (Reviewer'S Initials)

ML102440567 DOC. NAME: S;\\ROP-11 MID-CYCLE REVIEw\\BRANCH 5\\VERMONT YANKEE\\2010 MID-CYCLE ASSESSMENT LETTER W REV O.DOC After declaring this document "An Official Agency Record" it will/will not be released to the Public.

To receiv e a COpy of this document indicate in the box: 'C' =COPY without attactunentlenclosure 'E"" CoDVwith attachmentlenclosure "N° =No copy

~ OFFICE RI/DRP j

RI/DRP I

R1IDRP I

RIIORA 1

INAME TSetzerJ TCS DJackson/ TCS for JCliffordl JWC MDapaS/MLD II DATE 08/26/10 081 26/10 08/30110 08130110

"'See prior concurrence OFFICIAL RECORD COpy

08/25/2010 Page 1 of2 Report 22 15:56:22 Planned Dates Start End 0110112010 1213112010 04'05/2010 12131'2010 08/16/2010 08/2012010 07/12/2010 07/16/2010 11/01/2010 11/05/2010 11129/2010 12/10/2010 08/15/2010 08/20/2010 08115/2010 08/20/2010 08/15/2010 08/20/2010 08/15/2010 08/20/2010 08/15/2010 08/20/2010 08115/2010 08/20/2010 0811512010 08/20/2010 08109/2010 0911012010 0911312010 0911712010 09/2712010 1010112010 09113/2010 09/1712010 09/1312010 09/17/2010 10/18/2010 1012212010 10/1812010 10/22/2010 10/1812010 10/22/2010 10/18/2010 10/22/2010 11/15/2010 1111912010 Vermont Yankee Inspection 1Activity Plan 07/01/2010 - 12/31/2011 Title ISFSI

- ANNUAL SAMPLE - ISFSIINSPECTION IP 60855 Operation Of An ISFSI DFI

- DEMAND FOR INFORMATION RESPONSE REVIEW 2

IP 71152 Identification and Resolution of Problems 71111118

- REQUAL INSP WITH P/F RESULTS 3

IP 7111111 B Licensed Operator Requallfication Program TI-177

- MANAGING GAS ACCUMULATION IN ECCS 2

IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 11/29EXM

-INITIAL OPERATOR LICENSING EXAM 5

U01791 FY11-VERMONT YANKEE INITIAL OPERATOR LICENSING EXAM U01791 FY11-VERMONT YANKEE INITIAL OPERATOR LICENSING EXAM EPPROGR -EPPROGRAMINSPECnON 1

IP 7111402 Alert and Notification System Testing IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System IP 7111404 Emergency Action Level and Emergency Plan Changes IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 71151-EPOl DrilllExercise Performance IP 71151-EP02 ERO Drill Participation IP 71151-EP03 Alert & Notification System 71124

- GROUNDWATER TEAM INSPECTION 1

IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION 3

IP 7111105T Fire Protection [Triennial]

IP 7111105T Fire Protection [Triennial]

71124

- HP INSPECTION - ACCESS & ALARA IP 71124.01 Radiological Hazard Assessment and Exposure Controls IP 71124.02 Occupational ALARA Planning and Controls 71124

- RW TRANSPORTATION IISFSI & PI 1

IP 60855 Operation Of An ISFSI IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation I P 71151-0R01 Occupational Exposure Control Effectiveness IP 71151-PR01 RETS/ODCM Radiological Effluent 71124

- RETS INSPECTION 1

IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment his report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of2 Vermont Yankee 08125/2010 15:56:22 Inspection I Activity Plan Report 22 07/01/2010 - 12/31/2011 Planned Dates Start 04104/2011 04/18/2011 1

1 05/0212011 05/0212011 05/0212011 05102/2011 05/02/2011 1

1 05123/2011 05/23/2011 05/23/2011 06/0612011 06/2012011 06127/2011 10/03/2011 10/03/2011 1010312011 10/0312011 10/10/2011 End 04/08/2011 04122/2011 05/0612011 0510612011 05/06/2011 05/06/2011 05/06/2011 05/27/2011 05/27/2011 05/27/2011 06110/2011 06124/2011 07/0112Q11 10/07/2011 1010712011 10/07/2011 10/07/2011 10/14/2011

, Iinspection Activity II Title m 71152B

~ PI&R 4

IP 711526 Identification and Resolution of Problems IP 711528 Identification and Resolution of Problems EPEX

- EP EXERCISE EVALUATION 4

IP 7111401 Exercise Evaluation lP 7111404 Emergency Action Level and Emergency Plan Changes IP 71151*EP01 Dnll/Exercise Performance IP 71151-EP02 ERO Drill Participation IP 71151-EP03 Alert & Notification System 71124

. -COBI 6

IP 7111121 IP 7111121 IP 7111121 71124 IP 71124.01 IP 71124.02 Component Design Bases Inspection Component Design Bases Inspection Component Design Bases Inspection

  • HP*ACCESS I ALARA I PI VERIFICATION Radiological Hazard Assessment and Exposure Controls Occupational ALARA Planning and Controls IP 71151-0R01 Occupational Exposure Control Effectiveness IP 71151*PR01 RETS/ODCM Radiological Effluent 7111108G

- INSERVICE INSPECTION IP 7111108G Inservice Inspection Activities BWR

      • ~rtdoesnot include INPO and OUTAGE activities.

port shows only on-site and announced inspection procedures.

1 1