U.S. NUCLEAR REGULATORY COMMISSION l
REGION III
Report No. 50-266/86008(DRS)
Docket No. 50-266 Licenses No. DPR-24 Licensee: Wisconsin Electric Power Company 231 West Michigan, Room 308 Milwaukee, WI 53201 Facility Name:
Point Beach Nuclear Plant, Units 1 and 2 Inspection At:
Point Beach Site, Two Creeks, WI Inspection Conducted:
May 20-22, 1986 hk lek /t Inspector-D. E. Jones Date Approved By:
D. H. Danielson, Chief h f4 Materials and Processes Date Section Inspection Summary Inspection on May 20-22, 1986 (Report No. 50-266/86008(DRS))
Areas Inspected:
Special, unannaunced safety inspection of eddy current ISI activities and of the CVCS seal injection and charging line modifications.
Results:
No violations or deviations were identified.
$IO Do$
g6 G
-
,
..
.
DETAILS-1.
Persons Contacted Wisconsin Electric Power Company (WEPCo)
- J. Zach, Manager PBNP
- J. Knorr, Regulatory Engineer
- J. Reisenbuechler, Superintendent, EQRS
- S.
Pullins, ISI Coordinator
- K. Crowley, ISI Engineer B. Fromm, Modifications Engineer
- H. Hoelscher, Modifications Engineer
- F. Flentje, Administrative Specialist, EQRS The inspector also contacted and interviewed other licensee employees.
- Denotes those present at'the exit interview.
2.
Eddy Current Inservice Inspection - Unit 1 a.
General Information This is the fifth outage of the second ten year plan, and the second outage for the two steam generators that were installed in 1984.
Westinghouse Electrical Corporation (W), Nuclear Service Division, performed the eddy current examination of the steam generator tubes in accordance with ASME Section XI, 1977 Edition, Sumrcr 1979 Addenda.
Eddy current examination was performed on steam generators A and B, and no tubes were required.to be plugged.
b.
Procedure / Data Review The inspector reviewed the following procedures / data:
W, SM-10W Operating Procedure, MRS 2.4.2 Gen-30, Revision 0
- -
'
W, Digital Multi-Frequency Eddy Current Inspection of Preservice
!
and Inservice Heat Exchanger Tubing, MRS 2.4.2, Gen-28, Revision 1
Eddy current examination data
No violations or deviations were identified.
4-i l
l I
!
l I
,
.
3.
CVCS Seal Injection and Charging Line Modifications-Unit 1 a.
General The modifications to the Unit 1 CVCS seal injection charging line were initiated to permit integrated volumetric leak rate testing (IVLRT) of the normal charging line and seal injection line check valves, to accommodate 10 CFR 50, Appendix J, Type "C" requirements, b.
Proceudre Review The inspector reviewed the following ~rocedure that was used to p
accomplish this modification:
WEPCo, Welding Procedure For Austenitic Stainless Steels ASME
Group P-8 GTAW-SMAW, WP-2, Revision 5 c.
Review of Report and Certifications The inspector reviewed the following documentation items:
Welder Qualification Records
Weld Examination and Acceptance Records
No violations or deviations were identified.
4.
Exit Interview The inspector met wit's site representatives (denoted in persons contacted paragraph) at the conclusion of the inspection.
The inspector summarized scope and findings of the inspection noted in this report.
The inspector also discussed the likely informational content of the inspection report with regard to documents or processes reviewed by the inspector during the inspection.
The licensee did not identify any such documents / processes as proprietary.
.