IR 05000261/2025005
| ML25237A202 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 08/26/2025 |
| From: | Matthew Fannon NRC/RGN-II/DORS/PB2 |
| To: | Basta L Duke Energy Progress |
| References | |
| IR 2025005 | |
| Download: ML25237A202 (5) | |
Text
SUBJECT:
UPDATED INSPECTION PLAN FOR H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - REPORT 05000261/2025005
Dear Laura Basta:
The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for the H.B. Robinson Steam Electric Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the ROP is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.
This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
August 26, 2025 Please contact me at 404-997-4547 with any questions you have regarding this letter.
Sincerely, Matthew S. Fannon, Chief Projects Branch 2 Division of Operating Reactor Safety Docket Nos.: 05000261 and 07200003 License No.: DPR-23 Enclosure:
Robinson Inspection/Activity Plan (09/01/2025 - 06/30/2027)
cc w/ encl: Distribution via LISTSERV Signed by Fannon, Matthew on 08/26/25
SUNSI Review X
Non-Sensitive
Sensitive X
Publicly Available
Non-Publicly Available OFFICE RII/DORS RII/DORS NAME A. Wilson M. Fannon DATE 8/26/2025 8/26/2025
Site Inspection Activity Plan
Robinson 09/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count CYBER SECURITY INSPECTION
2 9/8/2025 9/12/2025 IP 71130.10 000741 Cybersecurity PROBLEM IDENTIFICATION AND RESOLUTION
2 3/9/2026 3/13/2026 IP 71152B 000747 Problem Identification and Resolution
3/23/2026 3/27/2026 IP 71152B 000747 Problem Identification and Resolution EMERGENCY PREPAREDNESS PROGRAM INSPECTION
2 6/8/2026 6/12/2026 IP 71114.02 000717 Alert and Notification System Testing
6/8/2026 6/12/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
6/8/2026 6/12/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
6/8/2026 6/12/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness
6/8/2026 6/12/2026 IP 71151 001397 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - ROB
2 7/20/2026 7/24/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
8/10/2026 8/14/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing ROBINSON INITIAL LICENSE EXAM
2 7/5/2026 7/11/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
8/9/2026 8/22/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI)
2 9/14/2026 9/18/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection
9/28/2026 10/2/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection SECURITY BASELINE INSPECTION
2 9/21/2026 9/24/2026 IP 71130.02 000734 Access Control
9/21/2026 9/24/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
9/21/2026 9/24/2026 IP 71130.09 001656 Security Plan Changes
9/21/2026 9/24/2026 IP 71151 001338 Performance Indicator Verification UNIT 2 IN-SERVICE INSPECTION +SG
2 10/12/2026 10/23/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
Site Inspection Activity Plan
RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION
10/19/2026 10/23/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
10/19/2026 10/23/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
10/19/2026 10/23/2026 IP 71124.04 000728 Occupational Dose Assessment
10/19/2026 10/23/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation
10/19/2026 10/23/2026 IP 71151 000746 Performance Indicator Verification
11/2/2026 11/6/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
11/2/2026 11/6/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
11/2/2026 11/6/2026 IP 71124.04 000728 Occupational Dose Assessment
11/2/2026 11/6/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation
11/2/2026 11/6/2026 IP 71151 000746 Performance Indicator Verification ROBINSON REQUAL INSPECTION
2 2/7/2027 2/13/2027 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance OPERATION OF AN ISFSI
2 6/14/2027 6/18/2027 IP 60855 Operation Of An ISFSI Robinson 09/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count OPERATION OF AN ISFSI