SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - SECURITY BASELINE INSPECTION REPORT 05000261/2025402
Dear Jeffrey Remick:
On August 7, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at H. B. Robinson Steam Electric Plant, Unit 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket No. 05000261 License No. DPR-23
Enclosure:
As stated
Inspection Report
Docket Number:
05000261
License Number:
Report Number:
Enterprise Identifier:
I-2025-402-0028
Licensee:
Duke Energy Progress, LLC
Facility:
H. B. Robinson Steam Electric Plant, Unit 2
Location:
Hartsville, SC
Inspection Dates:
August 04, 2025, to August 07, 2025
Inspectors:
J. Brown, Senior Physical Security Inspector
D. Egelstad, Physical Security Inspector
J. Stovall, Physical Security Inspector
Approved By:
Jannette G. Worosilo, Chief
Nuclear Security Branch
Division of Fuels, Radiological Safety, and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at H. B. Robinson Steam Electric Plant, Unit 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
inspection elements: Access Control
(1)
- Tier I: 02.01 (b, c, d); 02.02 (a, c, d, e, f); 02.03 (a); 02.04 (a, c, d, e); 02.05 (a).
- Tier II: 02.06 (c); 02.08 (a); 02.08 (c); 02.08 (e).
- Tier III: 02.09.
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the licensee's protective strategy through completion of the following
procedure elements: Protective Strategy Evaluation
(1)
- Tier I: 02.01 (b, c, d); 02.02 (a - f); 02.04 (b, d, e).
- Tier II: 02.06 (a, b, d, f, g, i, n); 02.07 (a).
- Tier III: 02.08; 02.09 (a, b).
(2)
- Observed a licensee-conducted force-on-force exercise
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following procedure elements:
Security Plan Changes (1 Partial)
(1)
(Partial)
The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p(2) since the last performance of this IP.
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) August 1, 2024, through July 31,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On August 7, 2025, the inspectors presented the security baseline inspection results to Jeffrey Remick and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or Date
Miscellaneous
AD-PI-ALL-0700
Performance Indicators
Revision 7
Procedures
AD-SY-ALL-0210
Site Access Controls
Revision 13
Procedures
AD-SY-ALL-0215
Security Search and Entry Processing
Revision 17
Procedures
AD-SY-ALL-0240
Security Key and Lock Controls
Revision 3
Corrective Action
Documents
2541831; 2541869; 2542433;
2547474; 2559622; 2559681
Miscellaneous
RNP Security Protective Strategy Briefing
Miscellaneous
Annual FOF and Quarterly TRD Documentation
Miscellaneous
Nuclear Oversight
Audit
Robinson Physical Security 2024-RNP-SEC-01
09/09/2024
Procedures
AD-PI-ALL-0300
Self-Assessment and Benchmark Programs
- Self-Assessment Report
Revision 8
Procedures
AD-SY-ALL-0120
Safety Security Interface Processes
Revision 4
Procedures
AD-SY-ALL-0150
- Reporting Safeguards, Security Events
Log
Revision 2
Procedures
AD-SY-ALL-0254
Revision 3
Procedures
AD-SY-ALL-0560
Security Drill and Exercise Program
Revision 11
Procedures
AD-SY-ALL-1000
Conduct of Security
Revision 13
Procedures
AD-SY-RNP-0130
RNP Formal Target Sets
Revision 2
Procedures
AD-SY-RNP-0251
Contingency Response
Revision 1
Procedures
AD-SY-RNP-0254
RNP Protective Strategy
Revision 3
Procedures
AD-PI-ALL-0700
Performance Indicators
Revision 7
71151
Miscellaneous
Various RNP Performance Indicator Tracking
Documents
August 2024-
July 2025
71151
Miscellaneous