SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - SECURITY BASELINE INSPECTION REPORT 05000261/2025402

Dear Jeffrey Remick:

On August 7, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at H. B. Robinson Steam Electric Plant, Unit 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket No. 05000261 License No. DPR-23

Enclosure:

As stated

Inspection Report

Docket Number:

05000261

License Number:

DPR-23

Report Number:

05000261/2025402

Enterprise Identifier:

I-2025-402-0028

Licensee:

Duke Energy Progress, LLC

Facility:

H. B. Robinson Steam Electric Plant, Unit 2

Location:

Hartsville, SC

Inspection Dates:

August 04, 2025, to August 07, 2025

Inspectors:

J. Brown, Senior Physical Security Inspector

D. Egelstad, Physical Security Inspector

J. Stovall, Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Nuclear Security Branch

Division of Fuels, Radiological Safety, and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at H. B. Robinson Steam Electric Plant, Unit 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: 02.01 (b, c, d); 02.02 (a, c, d, e, f); 02.03 (a); 02.04 (a, c, d, e); 02.05 (a).
  • Tier II: 02.06 (c); 02.08 (a); 02.08 (c); 02.08 (e).
  • Tier III: 02.09.

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following

procedure elements: Protective Strategy Evaluation

(1)

  • Tier I: 02.01 (b, c, d); 02.02 (a - f); 02.04 (b, d, e).
  • Tier II: 02.06 (a, b, d, f, g, i, n); 02.07 (a).
  • Tier III: 02.08; 02.09 (a, b).

(2)

  • Observed a licensee-conducted force-on-force exercise

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p(2) since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) August 1, 2024, through July 31,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 7, 2025, the inspectors presented the security baseline inspection results to Jeffrey Remick and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or Date

71130.02

Miscellaneous

AD-PI-ALL-0700

Performance Indicators

Revision 7

71130.02

Procedures

AD-SY-ALL-0210

Site Access Controls

Revision 13

71130.02

Procedures

AD-SY-ALL-0215

Security Search and Entry Processing

Revision 17

71130.02

Procedures

AD-SY-ALL-0240

Security Key and Lock Controls

Revision 3

71130.05

Corrective Action

Documents

2541831; 2541869; 2542433;

2547474; 2559622; 2559681

71130.05

Miscellaneous

RNP Security Protective Strategy Briefing

71130.05

Miscellaneous

Annual FOF and Quarterly TRD Documentation

71130.05

Miscellaneous

Nuclear Oversight

Audit

Robinson Physical Security 2024-RNP-SEC-01

09/09/2024

71130.05

Procedures

AD-PI-ALL-0300

Self-Assessment and Benchmark Programs

- Self-Assessment Report

Revision 8

71130.05

Procedures

AD-SY-ALL-0120

Safety Security Interface Processes

Revision 4

71130.05

Procedures

AD-SY-ALL-0150

- Reporting Safeguards, Security Events

Log

Revision 2

71130.05

Procedures

AD-SY-ALL-0254

RNP Protective Strategy (SGI)

Revision 3

71130.05

Procedures

AD-SY-ALL-0560

Security Drill and Exercise Program

Revision 11

71130.05

Procedures

AD-SY-ALL-1000

Conduct of Security

Revision 13

71130.05

Procedures

AD-SY-RNP-0130

RNP Formal Target Sets

Revision 2

71130.05

Procedures

AD-SY-RNP-0251

Contingency Response

Revision 1

71130.05

Procedures

AD-SY-RNP-0254

RNP Protective Strategy

Revision 3

71130.09

Procedures

AD-PI-ALL-0700

Performance Indicators

Revision 7

71151

Miscellaneous

Various RNP Performance Indicator Tracking

Documents

August 2024-

July 2025

71151

Miscellaneous

RNP PI Normalization Data