IR 05000261/2025404
| ML25057A330 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 02/28/2025 |
| From: | Matthew Fannon NRC/RGN-II/DORS/PB2 |
| To: | Basta L Duke Energy Progress |
| References | |
| IR 2025404 | |
| Download: ML25057A330 (2) | |
Text
SUBJECT:
H.B. ROBINSON STEAM ELECTRIC PLANT - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000261/2025404
Dear Laura Basta:
On February 6, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at H.B. Robinson Steam Electric Plant. On February 6, 2025, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
February 28, 2025 The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely, Matthew S. Fannon, Chief Projects Branch 2 Division of Operating Reactor Safety Docket No. 05000261 License No. DPR-23 Enclosure:
As stated cc w/o encl: Distribution via LISTSERV Signed by Fannon, Matthew on 02/28/25
ML25057A376 (Cover letter w/ enclosure(s))
ADAMS ACCESSION NUMBER: ML25057A330 (Cover letter)
Entire Report:
SUNSI Review Non-Sensitive X Sensitive Publicly Available X Non-Publicly Available Cover Letter Only:
X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available OFFICE RII/DORS RII/DORS NAME A. Wilson M. Fannon DATE 02/27/2025 02/28/2025