IR 05000010/1978005
| ML19340A824 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Quad Cities, Zion |
| Issue date: | 01/25/1978 |
| From: | Fiorelli G, James Keppler, Knop R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19340A823 | List: |
| References | |
| 50-010-78-05, 50-10-78-5, 50-237-78-04, 50-237-78-4, 50-249-78-04, 50-254-78-05, 50-265-78-07, 50-295-78-01, 50-304-78-01, NUDOCS 8009040651 | |
| Download: ML19340A824 (4) | |
Text
_ _ - -
-.
. ~.. -
.O
^
o U.S. NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMENT
.
~
(
REGION III
-
Report No. 50-010/78-05; 50-237/78-04; 50-249/78-04; 50-254/78-05; 50-265/78-07; 50-295/78-01; 50-304/78-01 Docket No. 50-10; 50-237; 50-249; License No. DPR-2; DPR-19; 50-254; 50-265; 50-295 DPR-25; DPR-29; DPR-30; 50-304 DPR-39; DPR-48 Licensee: Comonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: Dresden Nuclear Power Station, Units 1, 2 and 3 Ouad-Cities Nuclear Power Station, Units 1 and 2 Zion Nuclear Power Station, Units 1 and 2 Inspection at: Region III IE offices, Glen Ellyn, IL Inspection Conducted: January 10, 1978 Inspectors:
R. C. Kn p
_
G. Fiorelli J. G. Keppler
.
Other Accompanying Personnel:
G. Roy C. Norelius J. Sniezek M-e< 74
-
Approved by: UstonFiorelli, Chief b
Reactor Operatisns and
/
'
Nuclear Support Branch Inspection Sumary Inspection on January 10, 1978 (Report No. 50-010/78-05; 50-237/78-04; 50-249/78-04, 50-254/78-05; 50-265/78-07; 50-295/78-0]; 50-304/78-01)
Areas Inspected: This was a special, announced meeting conducted to dis-cuss the performance of the three Comonwealth Edison Nuclear Stations, to discuss actions being taken by Com onwealth Edison to improve regulatory performance, and to discuss equipment outage control events that occurred at Dresden.
(,
Results: Of the areas discussed, no further items of noncompliance or
'
!
deviations were identified.
!
,
8000040 [ $ /
l
--
.
.
l
,
(_s
-
DETAILS
.
1.
Attendance CECO J. J. O'Connor, President B. Lee, Jr., Vice President-(Construction, Production, Licensing and Environmental Affairs)
F. Palmer, Division Manager, Nuclear Stations B. Stephenson, Dresden Plant Superintendent C. Young, Compliance Administrator NRC J. G. Keppler, Director G. Roy, Deputy Director G. Fiorelli, Branch Chief, RO & NS C. Norelius, Assistant to the Director R. C. Knop, Section Chief, RO & NS J. Sniezek, Assistant Director, HQ 2.
Corporate Meeting
-
The meeting was held to review the status of corrective actions being taken by CECO to improve regulatory performance in general, and speci-fically to review corrective actions being taken to eliminate incidents occurring at Dresden due to lapses in equipment outage controls, a.
Corrective Actions The licensee stated that the following corrective actions are currently in progress.
.' 1 ) A management consultant is currently being selected to review a spectrum of management controls, which includes such activities as assignment of responsibilities, pro-cedure development, review and audit.
Current schedule for selection of the consultant was to be completed in time to start the review by February 1, 1978.
The review is expected to take approximately six months.
(2) The licensee has initiated a review of operating procedures at all three operating stations.
The review will include a need for additional precautions, required frequency for k-2-
..
_. _.
_
.
__
_
-
.
--
--
.r-O
,
,
a i
e f
~
'
{ '
~ related, which are within craft capability and which must
-
review, a determination as to which procedures are safety-
,
be at the work station. The review is currently being scoped. A tentative completion date has been~ set for the end of 1978.
l (3) The licensee stated that as part of the management con-
sultant review, they will look at ways of improving the stability of the site organizations. On a trial basis, the licensee will keep the region informed of potential moves of key plant personnel at all three plant sites.
The licensee s' ated that an investigative group has been (4)'
t formed to look at significant personnel errors and are currently formulating procedures to insure that all per-sonnel errors receive some level of formal review. This group is also reviewing the verification program needed during equipment outages and will recommend changes based
,
on their. review. Current schedule calls for this review
to be completed in 45 days.
.
b.
Review of Dresden Equipment Outage Events
,
.
'
.
A discussion was held relative to some of-the equipment outage
_
control problems experienced at the Dresden Station. Dresden site management review indicates that the main problems appear i
to be an unawareness of the details of the out-of-service
{
implementing procedures and a' lack of awareness of the best
me: hod of system isolation. As short-term corrective action,
'
~
a class on out-of-service control is to be started January 16, 1978. In addition, systems training will be given to maintenance j
foremen,-and will stress the proper method of taking equipment-out of service.
l New outage equipment procedures are being developed with more built in management control.
,
f l
Long-term corrective action will depend on the findings of the investigative task force, which is due to be completed in 45 l
days.
,