ML17208A313
| ML17208A313 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/01/1980 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML17208A314 | List: |
| References | |
| L-80-41, NUDOCS 8003190678 | |
| Download: ML17208A313 (3) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR! 8003190678 DOC ~ DATE: 80/02/01 NOTARIZED!
NO FA'CIL!50 389 St, Lucie PlantE Unit 2i Florida Power 8 Light Co AUTH~ NAME AUTHOR AFF'ILIATIl)N UHRIG R ~ E Florida Power 8 Light Co.
REC IP NAME RECIPIENT'FFILIATION, O'REILLYEJ ~ P.,
Region 2i Atlantean Office of the Director
'TTih/
l DOCKET ¹ 05000389 SUBJECT! Forwards final const" deficiency rept re'urricane David damage DISTRIBUTION CODE:
BOI9B COPIES RECEIVED:LTR
/i 'ENCL L SIZE'I~+gg TITLE: Const uction Deficiency Repor t (10CFRSO 55E)
N ES9 cc ~
I t'TcS
~
ACTION!
RECIPIENT ID CODE/NAME ia PM Bilk'EC.
20 LA 4.
COPIES LITTR ENCL 1
1 1
RECIPIENT'OPIES ID CODE/NAMEl LTTR ENCL 15 BC" ~~A 4'Z 1
1 21 AD 4AJg 1
1 INTERNAL!
REG FILE 05 08 MPA 10 QAB 13FIELD COOR/IE" 17 AD PLANT SYS
?2 DIR OPM AD/RCI/IE AEOD GEOSC IENCES BR ILC 'SYS BR MECH ENG BR STRUCT'NG BR 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1,
1 1
1 02 NRC'DR 07 EDO 8
STAFF 09 DEPY DIR DPM ii STANDRDS DEV 16 AD FOR ENGR 17 AD REAC'FTY 23 OELD AD/SITE TECH DIRECTOR DSE'ANAUERES-,
NATL ENG'R POWER SYS BR 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
"1 1
1 1
1 1
1 1
EXTERNAL! 03 LPDR 24 ACRS 1
1 16 16 04" NSIC 1
1 TOTAL NUMBER OF COPIES REQUIRED!
LTTR ~
ENCL" 08'
1>>
K 4
~
I gill 4
K4>>
'I 4
I I
IIK.
V>>'>>
K 1 i>>n>>,
4 4O
.ghee< 9 ~6 5 4 4.4 t4 I
Ii r
r 0 +~
~ >>>>>>>> ~
E
'll I I
II
~ O BO'< 529100,,'v1IAML PL 33)52 February 1,
1980 L-80-41 Hr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Dear t1r. O'Rei lly:
~ Re:
RII:JPO 50-389
.. DAiNGE RESULTING FROM DERRICK FAILURE DURING HURRICANE DAVID
Reference:
FP&L Letter L-29-283 dated October 4, 1979 rom R. Uhrig to J. O'Reilly As previously reported to the Office of Inspection and Enforcement on September 4 and 5, 1979, during the passage of Hurricane David the Chicago Bridge
& Iron guyed derrick collapsed resulting in damage to the Reactor Auxiliary Building on. Elevations
+43 feet and +62 feet, and the concrete Shield Building at Elevation
+191 feet.
Pursuant to 10CFR50.55(e) requirements, an interim report u(as issued via the referenced letter.
A final deficiency report is attached.
This concludes our activity on this subject.
Very truly yours, ROBERT E UHRIG Vice Pr'esident Advanced Systems
& Technology REU/JRP/td Attachment cc:
Director of Inspection and,Enforcement U.S. Nuclear Regulatory Commission Mashington, DC 20555 (w/attachment)
Harold Reis, Esquire goat SC 800319067g PEOPLa... S=RVING P=O~L-"