Delays Response to Contention on Temporary Storage of Six Steam Generators Until Final Design Details Are Available. Postpones Final Statement on Ability of Dunes to Provide Erosion Protection Until Review of Beach Survey Results
ML17338B142
Person / Time
Site: Turkey Point, Saint Lucie  NextEra Energy icon.png
Issue date: 09/19/1979
From: Bivins W, Turi G
Office of Nuclear Reactor Regulation
To: Hulman L
Office of Nuclear Reactor Regulation
References
NUDOCS 7910040250
Download: ML17338B142 (4)


Text

'ISTRIBUTION:

~QQQXQ)QX, DOCKET FILES (50-250/25j, gnd 50-389)

NRR Rdg. File

$ FP 19 lv75 HMB Rdg. File WSBivins

'BMllL'4@IJ glIllif I. Q(li if'll"It P~+Qg IIEIIOIIRI)FOR:

L. O. Huimen, Chief Hydrology-[meteor ology Br anch, DSE H. S. Bivins, Leader Hydrologic Engineering Section, HMB

SUBJECT:

G. P. Turi, Hy'dtaulic Engineer Hydrologic Engineering Section, HMB.

SITE VISITS -,TURKEY POINT AND ST. LUCIE DOCKET NOS. 50-250/251 AND 50-389 On September 10

1979, we visited the Turkey Point plant; The purpose of the visit was to see the proposed location of the buildirig for the temporary storage of'he six steam generators.

lte met with the licensee (see attached list of attendees) and discussed the building design and design bases.

The licensee is currently finalizing the design and will probably be sending us final design details that were not available in the Safety Evaluation dated Hay 14, 1979.

Based on these final design details and other relevant infor'-

mation, we will prepare our response'o the contention on the temporary stor age of the six steam generators, On September 11, 1979, we met with Tom Grozan and Jack Detlastry of Florida Power and Light. tteignspected the beach cannes at the St. Lucie site to deter-mine if significant erosion had occurred during Hurricane David, r4ich passed over the site on September 3, 1979, Based on our observation of the dunes and the vegetation, no significant erosion has occurred.
However, we will not make a final statement on the ability of the dunes to provide the in-tended erosion protection until we review the results of the beach sur vey.

In accordance with Technical Specification 4.7.6.1,1, the results of the survey should be submitted to the NRC within 30 days following the completion of'he survey.

Photos taken during the site visit are available in the Hydrologic Engineering Section files.

original Si~eg b

~'illiam S. Bivin g, S. Bivins, Leader Hydrologjc Engineering Section,'MB Or'i8inal Siggeg b>

Gale P. Turf.

G. P. Turi, Hydraulic Engineer Z9>0 040 P5C

, Hydrologic Engineering Section, HMB

Enclosure:

s OFtlCC~

CC:

01IIINAlliIW DATC~

-'Huller'""""

'J eo Kregert ~ ~ ~ ~ ~ ~ ~

il. Grotenhuis OSE:SA:HCl GPTuri:dlr

~ MI~ I ~ 0 ~i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

0

~

i'9/()

/79 SE:SA:HMB

<llSBivins 09/ ~q/79

ÃRC POrrM 318 (9.76) NRCM 0240 gj U,e, OOVCRNMONT PRINTINO ORRICOI It)~

ee ~

Te ~

o C

P 1

I4E, 4

~ 'aE II'

LIST OF ATTENDEES TURKEY POINT SITE VISIT September 10, 1979 GALE TURI NRC WILLIAMBIVINS NRC DOUG WHITTIER JACK DEMASTRY FLORIDA POWER AND LIGHT FLORIDA POWER AND LIGHT KEN HAMPTON FLORIDA POWER AND LIGHT TOM YOUNG FLORIDA POWER AND LIGHT JERRY BURFURD FLORIDA POWER AND LIGHT

~e