HL-2170, Requests Extension from Sept 1992 to 921215 to Submit Individual Plant Exam Rept,Per Generic Ltr 88-20.Efforts to Provide Analyses Consistent W/Requirements of Generic Ltr & NUREG-1335 Took Longer than Originally Estimated

From kanterella
Jump to navigation Jump to search
Requests Extension from Sept 1992 to 921215 to Submit Individual Plant Exam Rept,Per Generic Ltr 88-20.Efforts to Provide Analyses Consistent W/Requirements of Generic Ltr & NUREG-1335 Took Longer than Originally Estimated
ML20096D373
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/11/1992
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-1335 GL-88-20, HL-2170, NUDOCS 9205180011
Download: ML20096D373 (2)


Text

. _ _ .-. - . - - - . .- - - _ - . _ . =. _-- - - .- ._ - . . - . -

. cm a rca ccuerry l

, 3 5.1 F+amat A*nue WN s Ge:rg a 30DS w s u...e e n :<. r as t8a1.ng Afire g <

  • 0bytarwssCe'?O!VA OM 1

l

. rxcm on e 1 Bmwywv As-ea y an

'4 r;+.y e N SIndi W t

n. y me., , e m 9 .o
  • W. G. Hairston,111

% v.a. eum HL-2170 N. m o m 003287 May 11, 1992 U.S. Nuclear Regulatory Commission ATTH: Document Control Desk Washington, D.C. 20f,55 PLANT HATCH - UNITS 1, 2 NRC 00CKETS 50-321, 50-366 OPERATIt'G LICENSES DPR-57, NPF-5 ELOVEST FOR IPE SUBMITTAL EUENSION Gentlemen:

In our letter dated October 27, 1989, we indicated that our response to Generic Letter 88-20 (IPE) would be submitted in September 1992. In order to maintain the desired level of in-house participation in IPE development and review, an extension to the IPE submittal date is required. We request an extension to transmit the IPE submittal.on or before December 15, 1992.

The original schedule was based on man-hour estimates commensurate with the NRC estimates contained in the Generic Letter. _The efforts to provide analyses consistent with the requirements of the- Generic Letter and NUREG 1335 have proven to be greater than those original estimates.

We feel that the most benefit will be obtained from the IPE process if the submittal schedule is extended, thus minimizing the reassignn,ent of IPE tasks from in-house personnel to contractor personnel. This will maximize in-hcuse retention of IPE experience for future use.

If you have any questions regarding this request, please contact this office.

Sincerely, I p S-

  • . b ~

W. G. Hairston, III SRM/cr cc: (See next page.)

l 9205180011 920511 - \

l[

i PDR ADOCK 05000321 '

F PDR w.

o a

. l Georgia Pones d U.S. Nuclear Regulatory Commission May 11, 1992 Page Two c: Gtpraia Power ComDany Mr. H. L. Sumner, General Manager - Nuclear Plant NORMS

.U.S. Nuclear Reaulatory Commission. Washinaton. D.C.

Mr. K. Jabbour, Licensing Project Manager - Hatch U.S. Nuclear Reaulatory Commission. Reaion 11 Mr. S. D. Ebneter, Regional - Administrator Mr. L. D. Wert, Senior Resident inspector - Hatch a

h 003287

)

.- . . .