MONTHYEARML20212J7481999-09-29029 September 1999 Forwards Insp Rept 50-133/99-02 on 990915.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program HBL-99-011, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 31999-08-27027 August 1999 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 3 HBL-99-014, Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates,1999-07-23023 July 1999 Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, ML20209D9981999-07-0808 July 1999 Ack Receipt of Which Transmitted Rev 9 to Physical Security Plan for Humboldt Bay Power Plant,Under Provisions of 10CFR50.54(p).Changes Do Not Decrease Plan Effectiveness,So NRC Approval Is Not Required HBL-99-012, Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal1999-07-0707 July 1999 Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address ML20207E7301999-05-27027 May 1999 Discusses Reorganization of Nrr,Effective 990328 & Forwards Organizational Chart HBL-99-008, Forwards Annual Rept of Occupational Radiation Exposure for 1998. Radiation Exposure Rept Provided on Encl Diskette in Electronic Format of Reg Guide 8.7.Without Encl1999-04-30030 April 1999 Forwards Annual Rept of Occupational Radiation Exposure for 1998. Radiation Exposure Rept Provided on Encl Diskette in Electronic Format of Reg Guide 8.7.Without Encl ML20205L9951999-04-0808 April 1999 Forwards Insp Rept 50-133/99-01 on 990222-25 & 0308.No Violations Identified HBL-99-006, Forwards Annual Radioactive Effluent Release Rept, Covering Period Jan-Dec 1998.Encl 2 Contains Revs 1 & 2 to Safstor ODCM as Required by Specification Section 4.2 of Safstor Offsite Dose Calculation Manual1999-03-31031 March 1999 Forwards Annual Radioactive Effluent Release Rept, Covering Period Jan-Dec 1998.Encl 2 Contains Revs 1 & 2 to Safstor ODCM as Required by Specification Section 4.2 of Safstor Offsite Dose Calculation Manual DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) HBL-99-003, Forwards Annual Facility Status & Survey Rept, for Jan-Dec 19981999-03-31031 March 1999 Forwards Annual Facility Status & Survey Rept, for Jan-Dec 1998 ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot HBL-98-021, Forwards Rept Change (Rev 28) to Hbpp Emergency Plan, Effective 981126.Updated Emergency Plan,Not Included as Part of Submittal1998-12-18018 December 1998 Forwards Rept Change (Rev 28) to Hbpp Emergency Plan, Effective 981126.Updated Emergency Plan,Not Included as Part of Submittal ML20195H7631998-11-20020 November 1998 Forwards Insp Rept 50-133/98-04 on 980901-03,1012-17 & 20-22.No Violations Noted.Insp Focused on Activities Associated with Removal of 250 Feet Ventilation Stack HBL-98-013, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for Jan-Dec 1997. Encl Annual Rept Provides Brief Description of 10CFR50.59 Facility Design Changes, Including Summary of Each SE1998-11-10010 November 1998 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for Jan-Dec 1997. Encl Annual Rept Provides Brief Description of 10CFR50.59 Facility Design Changes, Including Summary of Each SE ML20154G4441998-10-0101 October 1998 Ack Receipt of Which Transmitted Rev 8 to Physical Security Plan for Humboldt Bay Power Plant,Under Provisions 10CFR50.54.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals HBL-98-015, Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes1998-08-28028 August 1998 Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. HBL-98-009, Submits Info Describing site-specifc Decommissioning Cost Estimates1998-08-0505 August 1998 Submits Info Describing site-specifc Decommissioning Cost Estimates ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 L-98-027, Forwards Rev 8 to Physical Security Plan.Encl 1 Identifies & Describes Plan Changes,Which Indicated W/Rev Bars in Left Margin of Physical Security Plan.Rev Withheld,Per 10CFR2.790(d)1998-06-11011 June 1998 Forwards Rev 8 to Physical Security Plan.Encl 1 Identifies & Describes Plan Changes,Which Indicated W/Rev Bars in Left Margin of Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) HBL-98-011, Forwards Rept of Rev 27 to Hbpp Emergency Plan,Effective 980507,per 10CFR50.4 & 10CFR50.54(q).Updated Plan Has Already Been Distributed to NRC Region IV IAW Hbpp Procedures.W/O Rept1998-06-0404 June 1998 Forwards Rept of Rev 27 to Hbpp Emergency Plan,Effective 980507,per 10CFR50.4 & 10CFR50.54(q).Updated Plan Has Already Been Distributed to NRC Region IV IAW Hbpp Procedures.W/O Rept ML20247R9091998-05-26026 May 1998 Forwards Copy of Transcript of Public Meeting Held by NRC W/Participation by PG&E on 980429 in Eureka,California Re Decommissioning of Humboldt Bay Power Plant ML20236E7681998-05-22022 May 1998 Forwards Insp Rept 50-133/98-03 on 980427-30.No Violations Noted.Insp Included Plans for Future Decommissioning of Facility,Including Removal of Unit 3 Stack & Eventual Dry Cask Storage of Unit 3 Spent Fuel ML20247L3571998-05-18018 May 1998 Clarifies Remark Re Discharge Through Existing Ventilation Stack to Avoid Confusion.Remark Was in Response to Question Re Purpose of Dismantlement & Replacement of Existing Ventilation Stack ML20247F9241998-05-14014 May 1998 Forwards Insp Rept 50-133/98-02 on 980414-15.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program.Determined That Physical Security Program Was Properly Implemented ML20216B7291998-05-12012 May 1998 Expresses Appreciation for Support Provided for Recent Public Meeting Held at Eureka Inn on Decommissioning of Humboldt Bay Power Plant ML20216B6801998-05-11011 May 1998 Expresses Appreciation for Outstanding Support Staff Provided for Recent Public Meeting Held at Eureka Inn on Decommissioning of Humboldt Bay Power Plant ML20217H1161998-04-21021 April 1998 Forwards Annual Rept of Occupational Radiation Exposure, for Employees & Visitors Monitored at Humboldt Bay Power Plant During CY97.Rept on Diskette.W/O Encl ML20216C8681998-04-0808 April 1998 Forwards Amend 32 to License DPR-7 & Safety Evaluation. Amend Revises TS to Implement GL 89-01 & to Incorporate Requirements of Revised 10CFR20 & App I to 10CFR50 HBL-98-008, Forwards Annual Radioactive Effluent Release Rept for 970101-1231. Rept Contains Comparison of Max Calculated Dose to Individual Members of Public W/Numerical Guidelines of 10CFR50 App I1998-03-31031 March 1998 Forwards Annual Radioactive Effluent Release Rept for 970101-1231. Rept Contains Comparison of Max Calculated Dose to Individual Members of Public W/Numerical Guidelines of 10CFR50 App I HBL-98-006, Forwards Annual Facility Status & Survey Rept for 1997. Section a Addresses Facility Status & Section B Presents Results of Monitoring Performed for Radiological Environ Monitoring Program1998-03-31031 March 1998 Forwards Annual Facility Status & Survey Rept for 1997. Section a Addresses Facility Status & Section B Presents Results of Monitoring Performed for Radiological Environ Monitoring Program HBL-98-003, Forwards Corrected TSs Re LAR 96-02,in Entirety W/ Affected Pages Retyped1998-03-13013 March 1998 Forwards Corrected TSs Re LAR 96-02,in Entirety W/ Affected Pages Retyped HBL-98-002, Submits Updated Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3. Safstor Decommissioning Plan Will Be Considered FSAR for Hbpp1998-02-27027 February 1998 Submits Updated Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3. Safstor Decommissioning Plan Will Be Considered FSAR for Hbpp ML20203K9691998-02-27027 February 1998 Forwards Insp Rept 50-133/98-01 on 980126-29.No Violations Noted.Major Areas Reviewed as Part of Insp Included Compliance W/Selected TS of License,Review of 1997 Annual Exercise & Evaluation of Facility Re Decommissioning Plan HBL-98-001, Informs That Existing Hbpp PM Program Adequately Meets Requirements of Maint Rule.Summary of Program & Basis for Determining Maint Rule Compliance at Plant,Encl1998-01-26026 January 1998 Informs That Existing Hbpp PM Program Adequately Meets Requirements of Maint Rule.Summary of Program & Basis for Determining Maint Rule Compliance at Plant,Encl ML20198J4791998-01-0707 January 1998 Informs That LL Wheeler Assumed Project Mgt Responsibilities for Humboldt Bay on 971229.LL Wheeler Can Be Contacted at Listed E-mail Address ML20199B3851997-11-13013 November 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-133/97-02 on 971001 HBL-97-016, Responds to NRC Re Violations Noted in Insp Rept 50-133/97-02.Corrective Actions:Correctly Reset Process Water Monitor Warning High & Low Alarms & re-educated All Operators on Proper Method to Set Process Water Monitor1997-10-27027 October 1997 Responds to NRC Re Violations Noted in Insp Rept 50-133/97-02.Corrective Actions:Correctly Reset Process Water Monitor Warning High & Low Alarms & re-educated All Operators on Proper Method to Set Process Water Monitor HBL-97-015, Submits Inventory Changes at Unit 3 from 970401-0930 for Matls Re Enriched U Fuel,Plutonium in Fuel,Fission Counters & Incore Flux Detectors.Encl 2 Provides Data Required by Form DOE/NRC-741.W/o Encl1997-10-0909 October 1997 Submits Inventory Changes at Unit 3 from 970401-0930 for Matls Re Enriched U Fuel,Plutonium in Fuel,Fission Counters & Incore Flux Detectors.Encl 2 Provides Data Required by Form DOE/NRC-741.W/o Encl ML20217D6191997-10-0101 October 1997 Forwards Insp Rept 50-133/97-02 on 970513-0828 & Nov.Nrc Will Use Licensee Response to NOV to Determine Whether Further Enforcement Action Necessary HBL-97-012, Forwards Rept of Rev 26 to Plant Emergency Plan,Effective 970801.Changes Do Not Decrease Effectiveness of Plan1997-08-28028 August 1997 Forwards Rept of Rev 26 to Plant Emergency Plan,Effective 970801.Changes Do Not Decrease Effectiveness of Plan ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments ML20149K8321997-07-25025 July 1997 Ack Receipt of Transmitting Rev 7 to Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p). Changes Do Not Decrease Effectiveness of Plan & No NRC Approval Is Required HBL-97-009, Provides Addl Justification to Support TS Change Request Contained in LAR 96-02 ,re Establishment of Radiological Effluents Control Program & in Response to 970416 Telcon1997-06-12012 June 1997 Provides Addl Justification to Support TS Change Request Contained in LAR 96-02 ,re Establishment of Radiological Effluents Control Program & in Response to 970416 Telcon L-97-035, Forwards Info Re Changes to Humboldt Bay Power Plant,Unit 3 Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan & Are Submitted Per 10CFR50.54(p). Encls Withheld Per 10CFR2.790(d)1997-04-0909 April 1997 Forwards Info Re Changes to Humboldt Bay Power Plant,Unit 3 Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan & Are Submitted Per 10CFR50.54(p). Encls Withheld Per 10CFR2.790(d) L-97-033, Confirms Final Disposition of Specific Hazardous Wastes Shipped to IT Corp Panoche & Vine Hill Facilities from Plant in Jul 19861997-04-0202 April 1997 Confirms Final Disposition of Specific Hazardous Wastes Shipped to IT Corp Panoche & Vine Hill Facilities from Plant in Jul 1986 HBL-97-003, Documents Utils Understanding of Results in Discussions from Meeting W/Nrc Personnel to Discuss Application of New Decommissioning Rule to Hbpp1997-02-20020 February 1997 Documents Utils Understanding of Results in Discussions from Meeting W/Nrc Personnel to Discuss Application of New Decommissioning Rule to Hbpp 1999-09-29
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARHBL-99-011, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 31999-08-27027 August 1999 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 3 HBL-99-014, Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates,1999-07-23023 July 1999 Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, HBL-99-012, Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal1999-07-0707 July 1999 Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address HBL-99-008, Forwards Annual Rept of Occupational Radiation Exposure for 1998. Radiation Exposure Rept Provided on Encl Diskette in Electronic Format of Reg Guide 8.7.Without Encl1999-04-30030 April 1999 Forwards Annual Rept of Occupational Radiation Exposure for 1998. Radiation Exposure Rept Provided on Encl Diskette in Electronic Format of Reg Guide 8.7.Without Encl HBL-99-003, Forwards Annual Facility Status & Survey Rept, for Jan-Dec 19981999-03-31031 March 1999 Forwards Annual Facility Status & Survey Rept, for Jan-Dec 1998 HBL-99-006, Forwards Annual Radioactive Effluent Release Rept, Covering Period Jan-Dec 1998.Encl 2 Contains Revs 1 & 2 to Safstor ODCM as Required by Specification Section 4.2 of Safstor Offsite Dose Calculation Manual1999-03-31031 March 1999 Forwards Annual Radioactive Effluent Release Rept, Covering Period Jan-Dec 1998.Encl 2 Contains Revs 1 & 2 to Safstor ODCM as Required by Specification Section 4.2 of Safstor Offsite Dose Calculation Manual DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot HBL-98-021, Forwards Rept Change (Rev 28) to Hbpp Emergency Plan, Effective 981126.Updated Emergency Plan,Not Included as Part of Submittal1998-12-18018 December 1998 Forwards Rept Change (Rev 28) to Hbpp Emergency Plan, Effective 981126.Updated Emergency Plan,Not Included as Part of Submittal HBL-98-013, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for Jan-Dec 1997. Encl Annual Rept Provides Brief Description of 10CFR50.59 Facility Design Changes, Including Summary of Each SE1998-11-10010 November 1998 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for Jan-Dec 1997. Encl Annual Rept Provides Brief Description of 10CFR50.59 Facility Design Changes, Including Summary of Each SE DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals HBL-98-015, Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes1998-08-28028 August 1998 Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. HBL-98-009, Submits Info Describing site-specifc Decommissioning Cost Estimates1998-08-0505 August 1998 Submits Info Describing site-specifc Decommissioning Cost Estimates ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 L-98-027, Forwards Rev 8 to Physical Security Plan.Encl 1 Identifies & Describes Plan Changes,Which Indicated W/Rev Bars in Left Margin of Physical Security Plan.Rev Withheld,Per 10CFR2.790(d)1998-06-11011 June 1998 Forwards Rev 8 to Physical Security Plan.Encl 1 Identifies & Describes Plan Changes,Which Indicated W/Rev Bars in Left Margin of Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) HBL-98-011, Forwards Rept of Rev 27 to Hbpp Emergency Plan,Effective 980507,per 10CFR50.4 & 10CFR50.54(q).Updated Plan Has Already Been Distributed to NRC Region IV IAW Hbpp Procedures.W/O Rept1998-06-0404 June 1998 Forwards Rept of Rev 27 to Hbpp Emergency Plan,Effective 980507,per 10CFR50.4 & 10CFR50.54(q).Updated Plan Has Already Been Distributed to NRC Region IV IAW Hbpp Procedures.W/O Rept ML20247L3571998-05-18018 May 1998 Clarifies Remark Re Discharge Through Existing Ventilation Stack to Avoid Confusion.Remark Was in Response to Question Re Purpose of Dismantlement & Replacement of Existing Ventilation Stack ML20217H1161998-04-21021 April 1998 Forwards Annual Rept of Occupational Radiation Exposure, for Employees & Visitors Monitored at Humboldt Bay Power Plant During CY97.Rept on Diskette.W/O Encl HBL-98-006, Forwards Annual Facility Status & Survey Rept for 1997. Section a Addresses Facility Status & Section B Presents Results of Monitoring Performed for Radiological Environ Monitoring Program1998-03-31031 March 1998 Forwards Annual Facility Status & Survey Rept for 1997. Section a Addresses Facility Status & Section B Presents Results of Monitoring Performed for Radiological Environ Monitoring Program HBL-98-008, Forwards Annual Radioactive Effluent Release Rept for 970101-1231. Rept Contains Comparison of Max Calculated Dose to Individual Members of Public W/Numerical Guidelines of 10CFR50 App I1998-03-31031 March 1998 Forwards Annual Radioactive Effluent Release Rept for 970101-1231. Rept Contains Comparison of Max Calculated Dose to Individual Members of Public W/Numerical Guidelines of 10CFR50 App I HBL-98-003, Forwards Corrected TSs Re LAR 96-02,in Entirety W/ Affected Pages Retyped1998-03-13013 March 1998 Forwards Corrected TSs Re LAR 96-02,in Entirety W/ Affected Pages Retyped HBL-98-002, Submits Updated Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3. Safstor Decommissioning Plan Will Be Considered FSAR for Hbpp1998-02-27027 February 1998 Submits Updated Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3. Safstor Decommissioning Plan Will Be Considered FSAR for Hbpp HBL-98-001, Informs That Existing Hbpp PM Program Adequately Meets Requirements of Maint Rule.Summary of Program & Basis for Determining Maint Rule Compliance at Plant,Encl1998-01-26026 January 1998 Informs That Existing Hbpp PM Program Adequately Meets Requirements of Maint Rule.Summary of Program & Basis for Determining Maint Rule Compliance at Plant,Encl HBL-97-016, Responds to NRC Re Violations Noted in Insp Rept 50-133/97-02.Corrective Actions:Correctly Reset Process Water Monitor Warning High & Low Alarms & re-educated All Operators on Proper Method to Set Process Water Monitor1997-10-27027 October 1997 Responds to NRC Re Violations Noted in Insp Rept 50-133/97-02.Corrective Actions:Correctly Reset Process Water Monitor Warning High & Low Alarms & re-educated All Operators on Proper Method to Set Process Water Monitor HBL-97-012, Forwards Rept of Rev 26 to Plant Emergency Plan,Effective 970801.Changes Do Not Decrease Effectiveness of Plan1997-08-28028 August 1997 Forwards Rept of Rev 26 to Plant Emergency Plan,Effective 970801.Changes Do Not Decrease Effectiveness of Plan ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments HBL-97-009, Provides Addl Justification to Support TS Change Request Contained in LAR 96-02 ,re Establishment of Radiological Effluents Control Program & in Response to 970416 Telcon1997-06-12012 June 1997 Provides Addl Justification to Support TS Change Request Contained in LAR 96-02 ,re Establishment of Radiological Effluents Control Program & in Response to 970416 Telcon L-97-035, Forwards Info Re Changes to Humboldt Bay Power Plant,Unit 3 Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan & Are Submitted Per 10CFR50.54(p). Encls Withheld Per 10CFR2.790(d)1997-04-0909 April 1997 Forwards Info Re Changes to Humboldt Bay Power Plant,Unit 3 Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan & Are Submitted Per 10CFR50.54(p). Encls Withheld Per 10CFR2.790(d) L-97-033, Confirms Final Disposition of Specific Hazardous Wastes Shipped to IT Corp Panoche & Vine Hill Facilities from Plant in Jul 19861997-04-0202 April 1997 Confirms Final Disposition of Specific Hazardous Wastes Shipped to IT Corp Panoche & Vine Hill Facilities from Plant in Jul 1986 HBL-97-003, Documents Utils Understanding of Results in Discussions from Meeting W/Nrc Personnel to Discuss Application of New Decommissioning Rule to Hbpp1997-02-20020 February 1997 Documents Utils Understanding of Results in Discussions from Meeting W/Nrc Personnel to Discuss Application of New Decommissioning Rule to Hbpp HBL-97-001, Submits Annual Rept of Changes,Tests & Experiments for Humboldt Bay Power Plant,Unit 3 for Reporting Interval Jan-Dec 19951997-01-28028 January 1997 Submits Annual Rept of Changes,Tests & Experiments for Humboldt Bay Power Plant,Unit 3 for Reporting Interval Jan-Dec 1995 ML20133F8961997-01-0909 January 1997 Responds to NRC Ltr of 961206 Received on 961210 Which Requested Further Info Re Utils Violations of Conditions of Its Nuclear Licenses Designated to Promote & Protect Competition in Bulk Power Market in Northern & Central CA ML20133F8721997-01-0909 January 1997 Acks & Responds to NRC Ltr of 961206 Received by Undersigned on 961210 Requesting Further Info to Document Tancs Assertion,Per Filing on 960429 That Util Has Violated Terms & Conditions of Nuclear Power Project Licenses HBL-96-027, Forwards Application for Amend to License DPR-7 to Relocate Controls & Limitations on RETS & Radiological Environmental Monitoring to ODCM & PCP1996-12-0909 December 1996 Forwards Application for Amend to License DPR-7 to Relocate Controls & Limitations on RETS & Radiological Environmental Monitoring to ODCM & PCP HBL-93-060, Forwards Rev 6 to Pacific Gas & Electric Co Humboldt Bay Plant Unit 3 - Safstor QA Plan1993-10-14014 October 1993 Forwards Rev 6 to Pacific Gas & Electric Co Humboldt Bay Plant Unit 3 - Safstor QA Plan ML20057F7271993-10-0808 October 1993 Forwards LAR 93-02,revising TS Section II, Site, Section V, Monitoring Sys & Section VII, Administrative Controls ML20059C4221993-09-0808 September 1993 Forwards Humboldt Bay Power Plant Updated Newsletter Sent to People Living within Ten Miles of Power Plant During Sept 1993 HBL-93-050, Forwards Rev 3 to Emergency Plan to Include Local Ltrs of Agreements W/Local Hosps,Humboldt County Fire Depts & Local Ambulance Svcs.Informs That Because Plan Incorporated Into Hbpp Plant Manuals,Vol 3,Rev 21 Appears at Top of Each Page1993-08-17017 August 1993 Forwards Rev 3 to Emergency Plan to Include Local Ltrs of Agreements W/Local Hosps,Humboldt County Fire Depts & Local Ambulance Svcs.Informs That Because Plan Incorporated Into Hbpp Plant Manuals,Vol 3,Rev 21 Appears at Top of Each Page HBL-93-005, Forwards Public Version of Rev 2 to Emergency Plan.Vol 3,Rev 20 Appears at Top of Each Page of Rev to Reflect Incorporation of Emergency Plan Into Hbpp Plant Manuals & Current Sys for Maint of Manuals.W/930202 Release Memo1993-01-19019 January 1993 Forwards Public Version of Rev 2 to Emergency Plan.Vol 3,Rev 20 Appears at Top of Each Page of Rev to Reflect Incorporation of Emergency Plan Into Hbpp Plant Manuals & Current Sys for Maint of Manuals.W/930202 Release Memo HBL-90-038, Forwards Decommissioning Financial Assurance Certification Rept,Per 10CFR50.751990-07-24024 July 1990 Forwards Decommissioning Financial Assurance Certification Rept,Per 10CFR50.75 HBL-90-036, Forwards Replacement Page 13-1,further Revising Section 13.2 of 880826 Rev 2 to Physical Security Plan.Rev Adds Specific Source Ref to Commitment Document & Retention of security- Related Documents.Encl Withheld (Ref 10CFR73.21)1990-07-17017 July 1990 Forwards Replacement Page 13-1,further Revising Section 13.2 of 880826 Rev 2 to Physical Security Plan.Rev Adds Specific Source Ref to Commitment Document & Retention of security- Related Documents.Encl Withheld (Ref 10CFR73.21) HBL-89-041, Responds to NRC Re Violations Noted in Insp Rept 50-133/89-02.Corrective Action:High Level Vault Containing Drums of Waste Immediately Posted as High Radiation Area1989-09-11011 September 1989 Responds to NRC Re Violations Noted in Insp Rept 50-133/89-02.Corrective Action:High Level Vault Containing Drums of Waste Immediately Posted as High Radiation Area ML20246E6061989-08-16016 August 1989 Forwards Endorsements 10 & 11 to Nelia Certificate N-74 & Maelu Certificate M-74 & Endorsements 7 & 8 to Nelia Certificate N-76 & Maelu Certificate M-76,respectively DCL-89-201, Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form1989-07-28028 July 1989 Discusses Notification to NRC Re Employees Potential Safety Issues,Per NRC .Licensee Sent Clarifying Ltrs to Employees Stating That Employees Free to Contact NRC of Any Safety Concerns W/O Fear of Retribution in Any Form ML20244B9261989-06-14014 June 1989 Submits Certificate of Insurance for Plant,Certifying That Insurance Has Been Effected W/Nuclear Mutual Ltd.Policy Term Is 890401-900401 ML20246J7051989-06-0909 June 1989 Forwards Application for Exemption from Requirements of 10CFR50.54(W) Filed Per 10CFR50.12(a).Application Relates to Utils Request for Reduction in on-site Property Damage Insurance from Current $100,000 to $63,160,000 DCL-89-149, Requests Renewal of Approval of QA Programs for Radioactive Matl Packages1989-05-30030 May 1989 Requests Renewal of Approval of QA Programs for Radioactive Matl Packages ML20244B4881989-04-0707 April 1989 Forwards Endorsement 35 to Maelu Policy MF-103 & Endorsements 65 & 116 to Nelia Policies NF-228 & NF-113, Respectively 1999-08-27
[Table view] |
Text
1 i
%' Pacific Gas and Electric Ccmpany 1000 King salmon Avenue
.' 5503 ilumboldt Bay P;werPlant T0bf A. AfoULIA Plant blanager l l
August 28,1998 1
PG&E Letter HBL-98-015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk l
Washington, DC 20555 '
Docket No. a-133, OL-DPR-7 l Humboldt Bay Power Plant, Unit 3 Revision 2 to the Defueled Safety Analysis Report
Dear Commissioners and Staff:
The enclosed Humboldt Bay Power Plant, Unit 3 Defueled Safety Analysis Report 1 (DSAR) was formerly known as the SAFSTOR Decommissioning Plan (SDP). As a l result of the 1996 NRC decommissioning rule, the SDP was considered to be a Post- l Shutdown Decommissioning Activities Repon (PSDAR) because it contained I information related to decommissioning activities. It was also considered to be a Final Safety Analysis Repon (FSAR) because it contained information such as plant description, site characterizatior and accident analysis.
In compliance with the 1996 NRC decommissioning rule, PG&E submitted a PSDAR in February 1998 to provide a general overview of proposed decommissioning activities.
As a result, the SDP will focus on providing the type ofinformation contained in an FSAR and will contain less information related to decommissioning activities. Thus, the SDP has been more appropriately renamed the DSAR.
The 1996 NRC decommissioning mie became etTective August 28,1996. This rule modified 10 CFR 50.71 to require licensees of permanently defueled plants to revise their FSARs at least once every 24 months. To comply with the decommissioning mle, PG&E is submitting this DSAR by August 28,1998.
Enclosures 1 and 2 contain information regarding changes to the DSAR. Enclosure 1 identifies and describes the report changes. Enclosure 2 provides Revision 2 of the DSAR.
~
9809100291 980828 PDR ADOCK 05000133 5 t
P ppg i
l PG&E Letter HBL-98-015 1
The changes contained in Revision 2 of the DSAR include plant modifications l
performed since the effective date of Revision 1 and reflect plant configuration and organization as of August 28,1998. Revision 2 also includes changes that provide I clarification ofinformation and correction of typogrrphical errors. The changes have been reviewed and approved by the Plant Staff Review Committee.
Since ly,
/m 1 TOM A. MO LIA !
cc: Dennis F. Kirsch l Ellis. W. Merschoff ,
Louis L. Wheeler i
l 4
l 4
1 I
i' PG&E Letter HBL-98-015 ENCLOSUREI 1
SUMMARY
OF CHANGES IN REVISION 2 OF THE HUMBOLDT BAY POWER PLANT, UNIT 3 DEFUELED SAFETY ANALYSIS REPORT l
1 i
t i
I l
t
_ __ _ . . _ _ . _ _ ._. _ _. ._ _.__ _ . _ . - . _ _ _ .m._._._ -_
I l
SUMMARY
OF CHANGES IN REVISION 2 l OF THE HUMBOLDT BAY POWER PLANT, UNIT 3 DEFUELED SAFETY ANALYSIS REPORT l
- 1. General correcion of typographical and editorial errors throughout the document.
- 2. SAFSTOR Decommissioning Plan changed to Defueled Safety Analysis Repost (DSAR) as the title and throughout the document to be consistent with the 1996 NRC Decommissioning Rule. Changed 'decomreissioning activities" to *SAFSTOR decommissioning activities" throughout the document to distinguish between d3 commissioning activities to place Unit 3 in SAFSTOR from future decommissioning work.
- 3. Executive summary revised to include a description of other documents submitted to NRC in accordance with the new decommissioning rule, and delete historical information including ,
identification of other documents submitted to the NRC with application to place Unit 3 in !
SAFSTOR.
- 4. Executive Summary and Section 1: Statements added that discussions related to future
! decommissioning activit'es and costs have been moved to the Post-Shutdown Decommissioning Activities Report (PSDAR).
- 5. Section 1.2, Criteria and Guidelines Review: Noted that the DSAR is consistent with guidance provided in Draft Regulatory Guide DG-1067, " Decommissioning of Nuclear Power Reactors," dated July 1997.
- 6. Section 3.2.2.5, Reactor Caisson: Added statements that access openings were cut in the suppression chambar, and baffle plates in the suppression chamber were removed. These statements reflect changes from safety evaluation HB3-EC-407. Also changed wording to !
reflect removal of new fuel storage vault racks. This reflects a change from a safety evaluation for SERA HB3-005.
- 7. Section 3.2.3.1, Control Rod Hydraulic System: Added statement that the scram dump tank and associated piping in the access shaft at the -66 foot level were removed. This reflects a
! change frorn a safety evaluation for SERA HB3-002.
L
- 8. Section 3.2.3.1, Core Spray System: Added statement that the two core spray pumps and associated suction and discharge piping at the -66 foot level were removed. This reflects a change from a safety evaluation for SERA HB3-001.
- 9. Sections 3.2.3.3 and 4.4.3.1, Liquid Waste Collection System: Changed ' pump
- to " pumps" l as a submersible pump was added to the caisson sump pump system. This reflects a l change from safety evaluation HB3-SM-401.
10, Section 3.2.3.5, Fuel Pool Circulating Water Pumps: Changed spent fuel pool filter to spent fuel pool strainer to be more accurate.
- 11. Section 3.2.3.6,480V System: Revised to state that the emergency section of Load Center 10 supplies power to Power Pane! No.1, not the AC Section of Valve Control Center No.1.
This reflects a change from safety evaluation HB3-SE-383.
.l.
ssatah-== d-- Rev2 Augut1993
.. . . _ _ _ . _ _ _ _ ~ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ .
-12. Table 3A: Added the EPA limitation of one million gallons of petroleum products on site.
Deleted reference to receiving fuel by tanker or barge because a pipeline is no longer in service.
- 13. Table 3-1, Physical Charaderization Summary, has been revised as follows:
e Part 1 (b): Control Rod Hydraulic System: The scram dump tank was removed. This j ~ reflects a change from a safety evaluation for SERA HB3-002.
e Part 1 (g): Core Spray System: The two core spray pumps were removed. This reflects a i change from a safety evaluation for SERA HB3-001.
! e Par 13 (c): Caisson Sump Pump System: Changed " pump' to " pumps" as a submersible pump was added to the system. This reflects a change from safety evaluation HB3-SM-401.
. Part 5 (c): "SFP Domineralizer Filter" changed to "SFP Domineralizer Strainer" to more accurately describe the function of the unit.
- 14. Sections 4.1,4.2 and 4.3: Eliminated description of plant organization that existed to place the plant in SAFSTOR. This reflects a change from safety evaluation 1998-07. Also l
eliminated descripticn of schedule information because this information is more l appropriately located in the PSDAR. Changed section titles accordingly to reflect these changes.
- 15. Section 4.2.1: Clarified that support continues to be provided to maintain Unit 3 in SAFSTOR from the following departments: Regulatory Services, Budget and Performance Mana0ement Department, the Procurement Services Section of the Site Services Department, Nuclear
- Quality Services, and Design Engineering Services. Department names were changed to refied current names.
- 16. Section 4.2.1: Revised description of the Senior Vice President and General Manager, and the Vice President, Nuclear Technical Services to reflect current responsibilities. This reflects a change from safety evaluation 1998-07.
- 17. Section 4.2.1: Clarified that the Plant Manager reposts to the Vice President, Nuclear i Technical Services.
- 18. Section 4.2.3: Eliminated discussion of the minimal impact of having an additional 15 employees in 1985.
- 19. Section 4.3.1: This section was revised to refied current cost estimates. Deleted estimated annual purchase expenses in Humboldt County of $20,000 in 1984 dollars as no longer l being relevant. l
- 20. Section 4.3.3.1, Training Program
Description:
Clarified the type and level of training provided to plant employees.
- 21. Section 4.3.3.2, General Employee Training: Description of Level 1,2 and 3 training moved to this section from 4.3.3.1 to eliminate duplication.
- 22. Section 4.3.3.3, Use of Monitoring Equipment: Maintained overall detection requirements but eliminated identification of specific detectors because specific detectors may change.
. 23. Section 4.3.3.3, Quality Control Department Training: Use of video tape as supplemental training is not used.
l
(
S$licennehtlerhvsunsi. doc Rev2 August 199s
- 24. Section 4.3.3.3, Quality Control Department Training Program: Number of QC inspectors is not pcrtinent to the training program description.
- 25. Section 4.4.3.1, Process Radiation Monitoring System: Modified the radwaste limits to reflect the wording of Safety Evaluation 1998-03,
- 26. Section 4.4.3.2, Yard Drains: The yard drain sump can be valved to the oily water separator instead of the settling ponds. This reflects a change from safety evaluation 1998-06.
- 27. Section 4.4.5, Radioactive Waste Processing and Disposal, was revised to describe expected future liquid and solid waste processing and disposal procedures at HBPP.
Section 4.4.5.1 Sources of Radioactive Wastes e Editorial changes such as removal of statements that waste generation will be at a reduced rate during the SAFSTOR period, or that a relatively low volume of liquid or solid waste will be generated.
Section 4.4.5.2 Waste Processing and Disposal e Editorial changes to set status of activities to current time.
. Description of the use of " Secondary Processors" to process wastes off-site, including sorting, survey and free-release, decontamination, consolidation and volume reduction prior to burial at a licensed burial site. Addressed in the Safety Evaluation 1998-04.
. Clarification that liquid waste processing may consist of any combination of filtration, domineralization, or (addition) of "other appropriate" process method.
. Removal of evaporation as a routine processing method. Although this method may be vendor supplied, the on-site evaporator will not be used. This issue was addressed in the EDOl, E3 changes S.E. 1998-01.
. Removal of the statemord that all wastes discharged are filtered through minimum 25 micron filter at the time of discharge. Filtration and/or domineralization will occur either
[
prior to or during discharge. This issue was addressed in the EDOI, E3 changes Safety i Evaluation 1398-01. 1
- For clarification, added resin sluice water and caisson inleakage to expected sources of i liquid radwaste.
. For clarification, removed statement that radwaste discharges will occur infrequently, o Elimination of discussion of on-site evaporator to process !! quid wastes. Addition of use of vendor (contractor) equipmerd to process waste by unspecified means, rather than limited to " solidification." Addressed in Safety Evaluation 1998-04.
- Addition of statemord that liquid and wet solid wastes may be shipped to off-site processor for treatment psior to land disposal. Addressed in Safety Evaluation 1998-04.
. Elimination of detailed discussion on process of sampling, analyzing of CWT contents in prepamtion for solidification. This was redundant with discussion later in section which is retained.
. Revision of processing of resins, including: (1) replacement of processing by de-watering or solidification with unspecified processing; (2) addition of the option to use off-site secondary procem J. Addressed in Safety Evaluation 1998-04.
. Revision of proces.ang of filters, including replacement of all details on package description, package storage, method of solidification on-site with general statement that packaging, processing, and shipmerd will be in accordancer with applicable regulations.
Addressed in Safety Evaluation 3/25/96 on method of processing and disposal of filters.
. Corrected the flow rate of two circulators to be 25,000 gpm instead of 50,000 gpm.
e Elimination of statement that chemical and decontamination wastes will be of minimal quantities. Clarification that decontaminatbn y astes are lic,41.
o Elimination of the description of dry activated waste processing as it is redundant on the desciiption of solid low-level waste processing, which is retained. l e Clarification of processing of activated components by allowing " current technology.'
3 5%sameentmorWwunsmodec Rev2 Auem 199s
i e Revision of processing of solid radioactive wastes including elimination of details on compactible and non-compactible waste handling and packaging, and the removal of
" valves" and addition of ' rubble" as examples. Clarification that processing may occur on-site or off-site to achieve volume reduction in the amount of waste disposed, e Clarification of processing of low level wastes including: (1) allowing sampling and analysis of wastes 'as required by regulation;" (2) addition of option to use secondary processors.
. Clarification of description of disposal, including: (1) addition of option to use secondary processors; (2) removal of Richland, WA facility as example of disposal site; (3)
, clarification that low-level wastes " shipped for land burial disposal' will be characterized per 10CFR61.
- 28. Section 4.4.6.1: The list of areas and rooms that were locked or provided with physical baniers to prevent access was deleted due to the ongoing decontamination effort and the removal of unused equipment. This reflects a change from a safety evaluation performed for a change to procedure RCP 4-F.
- 29. Section 5.2: Clarified that the spent fuel pool is the primary source of radioactivity, not the only source.
- 30. Section 5.2.2: Changed description of annual reports contents by referencing Offsite Dose Calculation Manual requirements. This reflects a change from Safety Evaluation 1998-02.
- 31. Section 5.3.2: Added statement that plant maintenance willimplement the requirements of 10 CFR 50.65 as appropriate.
- 32. Section 6.1: Deleted description of Senior Vice President and General Manager as duplicative of information in Section 4.2.1.
- 33. Section 6.1: Clarified that the PSRC serves as the plant ALARA Committee.
- 34. Section 6.1: Changed to indicate that the Senior Radiation Protection Engineer now reports to the Plant Manager.
- 35. Section 6.2: Deleted reference to the Corporate ALARA Committee which no longer exists, and added a description of equivalent corporate ALARA review being performed with the assistance of the Diablo Canyon Power Plant ALARA committee.
- 36. Section 6.3.1: Clarified that TLDs are the type of dosimetry badge used. Clarified that TLDs provide official exposure while pocket dosimeters provide estimates.
- 37. ,Section 6.3.3: Clarified that use of respirators will be based on a TEDE ALARA review.
- 38. Section 6.3.3: Clarified the requirements for personnel to wear respirators to add that personnel must be qualified to wear respirators in addition to having knowledge of respirators.
- 39. Section 6.3.4: Clarified that protective clothing requirements apply to personnel working in the restricted, not the owner controlled area.
- 40. Section 6.3.6.1: Clarified that only nne air sampler is in the refueling building.
- 41. Section 6.3.6.2: Clarified that contamination levels will be determined with an appropriate instrument, rather than specify a GM instrument.
SV- ^' '... - doc Rev2 August 1998 l- -- -
?
- 42. Section 6.3.6.3: Clarified that an offsite laboratory may be used to analyze samples.
- 43. Section 6.3.7.1: Deleted discussion of use of specific types of instruments because equivalent instruments can be used if the specific instruments are no longer available.
- 44. Sections 6.3.7.1,6.3.7.3 and 6.3.7.4: Clarified that instrument calibration and participation in an intertaboratory sample splitting program may be performed offsite rather than making specific reference to Diablo Canyon Power Plant and/or PG&E's Technical and Ecological Services. ,
l
- 45. Section 6.3.7: Deleted Table 6-1, " Radiation Protection Instruments Used at HBPP" because it contained a representative listing of the types of portable survey instruments and equipment available at HBPP and may not be complete since instruments may be replaced (for repairs) with new instruments if the current instruments are no longer available.
i i
l i
-5 S L d A % veunundoc
PG&E Letter HBL-98-015 ENCLOSURE 2 IIUMBOLDT BAY POWER PLANT, UNIT 3 DEFUELED SAFETY ANALYSIS REPORT l
l l
l l
l l
l l
.