SUBJECT:
POINT BEACH NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000266/2025003; 05000301/2025003 AND 07200005/2025001
Dear Thad Edmonds:
On September 30, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant. On November 19, 2025, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
Due to the temporary cessation of government operations, which commenced on October 01, 2025, the NRC began operating under its Office of Management and Budget-approved plan for operations during a lapse in appropriations. Consistent with that plan, the NRC operated at a reduced staffing levels throughout the duration of the shutdown.
However, the NRC continued to perform critical health and safety functions and make progress on other high-priority activities associated with the ADVANCE Act and Executive Order 14300.
On November 13, 2025, following the passage of a continuing resolution, the NRC resumed normal operations. However, due to the 43-day lapse in normal operations, the Office of Nuclear Reactor Regulation granted the Regional Offices an extension on the issuance of the calendar year 2025, 3rd quarter integrated inspection reports normally issued by November 15, 2025, to December 31, 2025. The NRC will resume the routine cycle of issuing inspection reports on a quarterly basis beginning with the calendar year 2025, 4th quarter integrated inspection reports, which will be issued 45 days after the 4th quarter ends on December 31, 2025.
No findings or violations of more than minor significance were identified during this inspection.
December 22, 2025 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Elba M. Sanchez Santiago, Chief Reactor Projects Branch 2 Division of Operating Reactor Safety Docket Nos. 05000266; 05000301 and 07200005 License Nos. DPR-24 and DPR-27 Enclosure:
As stated cc w/ encl: Distribution via LISTSERV Signed by Sanchez Santiago, Elba on 12/22/25
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 began the inspection period at rated thermal power and remained at or near full power throughout the remainder of the inspection period.
Unit 2 began the inspection period at rated thermal power and remained at or near full power throughout the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs)in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 2 motor driven auxiliary feedwater system on July 10, 2025
- (2) Unit 2 safety injection system on July 14, 2025
- (3) G-03 diesel generator starting air system on July 16, 2025
- (4) Service water system on July 17, 2025
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Fire Zones 225, 226, 227, and 228:
D-105 battery room, D-106 battery room, and electrical rooms on July 9, 2025
- (2) Fire Zone 151:
Containment spray and safety injection pump area on July 14, 2025
- (3) Fire Zones 552, 553, 554, 555:
Service water pump area, circulating water pumphouse, passageway, and forebay on July 15, 2025
- (4) Fire Zones 770, 771, 772, 773, 774, 775, 776, and 777:
Diesel generator building on July 16, 2025
Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the onsite fire brigade training and performance during an announced fire drill on July 30, 2025.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
- (1) The inspectors observed and evaluated licensed operator performance in the control room during a down power to support turbine-driven auxiliary feedwater pump testing on July 31, 2025, and August 1, 2025.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated operator requalification and new license integration on August 19, 2025.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (2 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Turbine-driven auxiliary feed system
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Elevated risk during inverter maintenance and restoration on July 10, 2025
- (2) Elevated risk due to emergent work on the rod drive control system on August 28, 2025
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)
The inspectors evaluated the licensees justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Operability of emergency diesel generator G-01 following step change in coolant conductivity
- (2) Operability of containment with elevated hydrogen readings
- (3) Operability of rod control system following receipt of urgent failure annunciator
- (4) Operability of safety injection valve found with excess packing load
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Containment temperature instrument modification
71111.24 - Testing and Maintenance of Equipment Important to Risk
The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:
Post-Maintenance Testing (PMT) (IP Section 03.01) (8 Samples)
- (2) Swing station battery PMT following battery replacement on July 25, 2025
- (3) Repack Unit 1 safety injection pump cross connect valve on August 12, 2025
- (4) Repack Unit 1 safety injection pump A discharge valve on August 12, 2025
- (5) Service water pump expansion joint replacement on September 23, 2025
- (6) Replace residual heat removal to letdown cross connect valve on September 24, 2025
- (7) Component cooling water pump following breaker maintenance, pump oil change, and cleaning on September 24, 2025
- (8) Rod control system PMT following replacement of logic card on September 30, 2025
Surveillance Testing (IP Section 03.01) (2 Samples)
- (1) IT 405A, Auxiliary feedwater pump water supply isolation exercise quarterly test on August 13, 2025
- (2) Primary auxiliary building filtration system efficiency testing on September 24, 2025
Inservice Testing (IST) (IP Section 03.01) (2 Samples)
- (1) Turbine-driven auxiliary feed pump and valve test on August 1, 2025
- (2) Unit 2 containment spray pump and valve test on September 29, 2025
Diverse and Flexible Coping Strategies (FLEX) Testing (IP Section 03.02) (1 Sample)
- (1) FLEX 120/240 volt alternating current (VAC) portable generator annual surveillance, work order 40982033
71114.06 - Drill Evaluation
Additional Drill and/or Training Evolution (1 Sample)
The inspectors evaluated:
- (1) Point Beach exercise on September 9,
RADIATION SAFETY
71124.03 - In-Plant Airborne Radioactivity Control and Mitigation
Permanent Ventilation Systems (IP Section 03.01) (1 Sample)
The inspectors evaluated the configuration of the following permanently installed ventilation systems:
- (1) Primary Auxiliary Building Ventilation
Use of Respiratory Protection Devices (IP Section 03.03) (1 Sample)
- (1) The inspectors evaluated the licensees use of respiratory protection devices.
Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)
- (1) The inspectors evaluated the licensees use and maintenance of self-contained breathing apparatuses.
71124.04 - Occupational Dose Assessment
Source Term Characterization (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated licensee performance as it pertains to radioactive source term characterization.
External Dosimetry (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated how the licensee processes, stores, and uses external dosimetry.
Internal Dosimetry (IP Section 03.03) (1 Sample)
The inspectors evaluated the following internal dose assessments:
- (1) Internal dose assessment performed for an intake on April 1, 2025
Special Dosimetric Situations (IP Section 03.04) (1 Sample)
The inspectors evaluated the following special dosimetric situations:
- (1) Noble gas emersion dose
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS06: Emergency AC Power Systems (IP Section 02.05)===
- (1) Unit 1 (July 1, 2024, through June 31, 2025)
- (2) Unit 2 (July 1, 2024, through June 31, 2025)
MS07: High Pressure Injection Systems (IP Section 02.06) (2 Samples)
- (1) Unit 1 (July 1, 2024, through June 31, 2025)
- (2) Unit 2 (July 1, 2024, through June 31, 2025)
MS08: Heat Removal Systems (IP Section 02.07) (2 Samples)
- (1) Unit 1 (July 1, 2024, through June 31, 2025)
- (2) Unit 2 (July 1, 2024, through June 31, 2025)
BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (2 Samples)
- (1) Unit 1 (October 1, 2024, through June 30, 2025)
- (2) Unit 2 (October 1, 2024, through June 30, 2025)
OR01: Occupational Exposure Control Effectiveness Sample (IP Section 02.15) (1 Sample)
- (1) October 1, 2024, through June 30, 2025 PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)
- (1) October 1, 2024, through June 30,
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
60855 - Operation of an Independent Spent Fuel Storage Installation Operation of an Independent Spent Fuel Storage Installation
- (1) The inspectors evaluated the licensees independent spent fuel storage installation (ISFSI) cask loading activities from July 7 through July 11, 2025.
Specifically, the inspectors observed the following activities during the loading of Multi-Purpose Canister (MPC) No. 557:
- canister fuel loading and verification
- closure welding and non-destructive evaluations
- vacuum drying
- stack-up and download of the MPC from the transfer cask into the storage cask
- radiological field surveys The inspectors performed walkdowns of the ISFSI pad and haul path, which also included performing independent radiation surveys.
The inspectors evaluated the following:
- spent fuel selected for loading into dry cask storage during this campaign
- selected corrective action program documents
- selected 72.48 screenings
- changes to the site's 10 CFR 72.212 report since the previous inspection
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On November 19, 2025, the inspectors presented the integrated inspection results to Thad Edmonds, Site Vice President, and other members of the licensee staff.
- On July 11, 2025, the inspectors presented the ISFSI cask loading inspection results to Thad Edmonds, Site Vice President, and other members of the licensee staff.
- On September 25, 2025, the inspectors presented the radiation protection inspection results to Thad Edmonds, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Calculations
HI-2240742
Seismic and Structural Evaluation of Approach Apron
at Point Beach
Calibration
Records
HOL-95601
Relief Valve
2/11/2025
2396325
MPC S/N's 201, 202, 203, & 205 Tracking/Documentation
06/18/2021
2396740
DFC S/N# 26 - Holtec FCR31501057
06/23/2021
2443328
WHSM-17 / WNHOMS-32-033 Concrete Repair
2/07/2022
2507231
P-224 CDW Roughing Vacuum Pump Tripped
2/04/2025
2518574
Hydraulic Oil Leak on HI-TRAN
06/30/2025
2518952
Dislodged Annulus Seal Loaded MPC/HI-TRAC in
Spent Fuel Pool
07/07/2025
Corrective Action
Documents
2519149
Potential FM Intrusion into HI-TRAC Annulus
07/09/2025
2519245
ISFSI Inspection - DFS FME Practices
07/11/2025
Corrective Action
Documents
Resulting from
Inspection
2519253
25 ISFSI Inspection - ISFSI Area Housekeeping
07/11/2025
Engineering
Changes
299638
HI-STORM FW Loading to East ISFSI Pad Approach Aprons
MPC-37 Multi-Purpose Canister Record
07/07/2025
2.48/50.59-1435
HI-STORM FW Overpack Baseplate
01/29/2020
2.48/50.59-1455
04/22/2020
2.48/50.59-1462
MPC-37 Lid
05/20/2020
2.48/50.59-1551
ECO-100-46-Full Evaluation
09/13/2024
2.48/50.59-1599
ECO-5018-77-Full Evaluation
09/17/2024
FPL-1
Quality Assurance Topical Report
HI-2240509
Fuel Loading Plan for Point Beach (ISFSI)
08/19/2024
Miscellaneous
JNA 24-005
NA Audit JNA 24-005 Independent Spent Fuel Storage
(ISFS)
10/31/2024
3665-0792-24-
095-07092025-01
Helium Leak Test Report for Multi-Purpose Canister (MPC)
Vent and Drain Port Cover Plates
07/09/2025
C03-PT-02
Lid to Shell-1st Fill Layer
07/08/2025
60855
NDE Reports
C03-PT-07
Closure Ring Welds
07/09/2025
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
DOC-103-017R2
Supplied System Name: HI-TRAC VW with Lift Lugs
for Point Beach (LEASED)
FCR-3392-1030
A: HI-TRAN Manual Recovery Without Power
HPP-2951-0200
HPP-2951-0300
MPC Sealing, Drying, and Backfilling (ISFSI)
HPP-2951-700
8.8: HI-STORM Vent Surveillance
06/30/2025
HSP-355
Periodic Inspection and Recertification of Special Lifting
Devices
HSP-506
Liquid Penetrant Examination for MPC Field Closure
Welding
Rigging Handbook and Inspection Procedure
NP.8.4.7
Control of Safe Load Path and Rigging Manual
NPM 2018-0025
Structural Inspection Year 3
10/05/2022
NPM 2025-0001
Structural Inspection Year 5
2/03/2025
REP-21917-1-
001
Site Load Test Procedure Post Bridge Weld Repair
Procedures
RMP 9120
Auxiliary Building Crane Inspection
2/03/2025
210618-8
ISFSI for New HI-Storm/ Title: Exit Aop 13 C
06/18/2021
210811-15
ISFSI HI-Storm Title: Upper Vent Survey
08/11/2021
220429-10
ISFSI Semi Annual
04/29/2022
220724-01
ISFSI Overview Title: - Exit AOP-13C
07/24/2022
230424-2
ISFSI Semi Annual
04/24/2023
240522-2
05/22/2024
240706-2
07/06/2024
250320-9
03/20/2025
Radiation
Surveys
250416-2
ISFSI Semi Annual
04/16/2025
Self-Assessments 02497351-03
Pre-Inspection Self-Assessment
Work Orders
40997517-01
Z-015 WIRE ROPE INSPECTION
06/04/2025
110E035
P&ID Safety Injection System
Drawings
M-207
Service Water System
M-209
P&ID Starting & Service Air System Diesel Generator
Building
Drawings
M-2217
P&ID Auxiliary Feedwater System
CL 10B
Service Water Safeguards Lineup
CL 11A G-03
G-03 Diesel Generator Checklist
CL 13E Part 2
Auxiliary Feedwater Valve Lineup Motor Driven
Procedures
CL 7A
Safety Injection System Checklist Unit 2
Modes 1,2,3, and 4 (With Both ECCS Trains Aligned for
Injection)
PFP-0-PAB 26
Pre-Fire Plan Unit 1 & Unit 2 Auxiliary Building 26 Ft
PFP-0-PAB-8
Pre-Fire Plan Primary Auxiliary Building Elevations 8'
and Below
Fire Plans
Pre-fire Plan Protected Area North (Inside the Fence)
Miscellaneous
PBN LOC 25C
2S
Fire Drill
Miscellaneous
PBN LOC 25C
001S
New License Integration
Procedures
OP 2A Unit 1
Normal Power Operation Unit 1
2503684
Unexpected Start of W-14B
2/13/2024
2503718
2B52-328H W-13B1 CR Recirc Fan Breaker Thermal
Overload Trip
2/14/2024
2514827
CREFS Actuation
05/06/2025
2514954
20 DPM Leakage Upstream of 2AF-59
05/08/2025
2516247
CREFS Mode 5 Partial Activation
05/27/2025
Corrective Action
Documents
2517337
C-67-EXT Panel Relay 42-B2X Abnormal Noise
06/12/2025
Work Activity Risk
Management
Plan
2DY-02 Perform 10yr PM per 2RMP 9036-6
Work Activity Risk
Management
Plan
Shifting Instrument Inverters Aligned to an Instrument Bus
Miscellaneous
Work Activity Risk
Management
Plan
Troubleshooting and Possible Card Replacement for U2 Rod
Control System Urgent Failure Alarm
Calculations
2003-0014
MOV Operating Parameters
2506691
Review Diagnostic Test Data for 1-SI-00866A Following
Repack
01/29/2025
2511984
Low Level As-Found Inertial Overtorque on 1SI-866A
03/31/2025
2512184
1SI-866B As-Found Test Failure due to Excess Packing
Load
04/01/2025
2513245
Due to Low AL Margin in 1R42 - Increase Thrust in 1R43
04/11/2025
20021
Step Change in Conductivity of Emerg. Diesel Generator
Coolant
07/22/2025
21437
Material Left in Unit 1 Containment
08/13/2025
21441
U1 Containment Entry Aborted due to Lower Explosive Limit
(LEL) Alarm
08/13/2025
Corrective Action
Documents
22288
Unit 2 Rod Control System Urgent Failure
08/26/2025
Procedures
CMP 2.2.9
MOV Overthrust/Overtorque Review Guidance
CN-CRA-08-6
Point Beach Units 1 and 2 (WEP/WIS) LOCA Mass and
Energy Release and Containment Response Analysis for the
EPU Program
1B
Calculations
CN-CRA-12-26
Point Beach Units 1 and 2 LOCA Containment Response
Analysis
22756
FSAR Table 14.3.4-29 Update
09/02/2025
Corrective Action
Documents
Resulting from
Inspection
24477
Potential Minor Violation of 10 CFR 50.71(E)
09/25/2025
2013-0188-02
Reduction of CFC Heat Removal Requirement 50.59
Screening
2018-003
10CFR50.59 Evaluation to Correct Errors in the LOCA and
Steam Line Break Containment Response Analyses
(CN-CRA-12-26 and CN-CRA-12-27)
Engineering
Evaluations
EC 2015-0031
Evaluation of Increased Containment Post-Accident
Temperature on Previously Qualified EQ Components
2513555
Battery Experienced Catastrophic Failure
04/16/2025
2516913
Z-2005A Did Not Crank Over with Battery
06/05/2025
22767
U2 Rod Control System Additional PMT Needed
09/02/2025
Corrective Action
Documents
23849
2SI-871A CS Suction from RHR Valve Stroke Open was
Outside Acceptance Criteria
09/17/2025
Drawings
M-217, Sheet 1
P&ID Auxiliary Feedwater System
107
IT 06
Train A Containment Spray Pump and Valves Unit 2
IT 08A
Cold Start of Turbine-Driven Auxiliary Feed Pump and Valve
Test (Quarterly) Unit 1
IT 405A
2AF-4067, 2P-53 AFP Service Water Supply Isolation
Exercise Test Unit 2 (Quarterly)
IT 520B
Leakage Reduction and Preventive Maintenance Program
Test of 1SI-896A&B, SI Pump Suction Valves and HHSI
System High Flow Test Line (Refueling) Unit 1
NP 7.7.36
Diverse and Flexible Coping Strategies (FLEX) Program
Procedures
OM 3.42
Control of WR SFP Level Instrumentation and Credited
FLEX Equipment
40834723-02
1SI-00829A / Operations PMT Manual Stroke
04/09/2025
40834725-02
1SI-00888A / Operations PMT Manual Stroke
04/09/2025
40881297
Filtration System Efficiency Test
03/06/2024
40951760
1RH-715C Exceeds Admin Limits Leakage
09/03/2025
40964913
D-305; 125V Swing Station Battery is Reaching End of Life
07/06/2025
40973471
2P-011B Change Oil, Flush Bearings and Clean Intake Grills
08/31/2025
40978938
XJ-02974C, P-32C Expansion Joint - 2024 NRC ARD
06/05/2025
40982033-01
0-SOP-FLEX-001 / Z-200A thru I Annual Loaded Run
04/16/2025
40987580-01
Z-2005A 2 Year Maintenance Requirements
06/05/2025
40987580-02
Z-2005A Ops PMT
06/05/2025
40991103
B52-DB50-047 Bkr Maint per RMP 9303 and RMP 9369-1
08/31/2025
41015618-01
Z-2000D; Replace Battery
05/05/2025
41020938-01
Z-2005A Did Not Crank Over with Battery
06/09/2025
Work Orders
41028703
Unit 2 Rod Control System Urgent Failure
08/31/2025
EP Drill Scenario
09/09/2025
Miscellaneous
EPIP 1.2.1
Emergency Action Level Technical Basis
BG AOP-17A
Rapid Power Reduction
Procedures
BG EOP-0.2
Natural Circulation Cooldown
2478916
Vendor Calibration Portacount as-Found Out of
Specifications
2/12/2024
2480710
F-021 Unable to Fully Tighten Charcoal Filter Trays
03/06/2024
Corrective Action
Documents
2481790
F-023 PAB Exhaust Charcoal Filter Test Results
03/19/2024
SCBA Qualification Matrix
09/17/2025
Miscellaneous
Functional Test Results for SCBA 601
2/20/2024
Functional Test Results for SCBA 617
2/12/2025
Jefferson Fire and Safety Air Quality Analysis Report
06/18/2025
Procedures
PC 75 Part 1
Monthly And Turnaround Maintenance for the Scott 4.5
Self-Contained Breathing Apparatus
Self-Assessments L1A 02496994
Level 1 NRC Inspection Assessment
08/29/2025
Work Orders
40881297
Filter Testing
03/06/2024
Calculations
Internal Dose Assessment
04/12/2025
2476128
Dosimeter Calibrator Not Functioning Properly
01/08/2024
Corrective Action
Documents
2481397
Lapel Sampler Failed during Use
03/14/2024
Miscellaneous
HP-100-100924
Calculation of Shallow Dose Equivalent - Whole Body from
Noble Gases
Procedures
HPIP 3.52
Airborne Radioactivity Surveys
Occupational Performance Indicator Data for October 2024
11/05/2024
Occupational Performance Indicator Data for
February/March 2025
04/15/2025
Occupational Performance Indicator Data for June 2025
04/01/2025
RCS Activity PI Data Calculation
11/01/2024
RCS Activity PI Data Calculation
04/02/2025
RCS Activity PI Data Calculation
07/01/2025
ODCM Radiological Effluent Occurrences PI Data
Calculation
11/07/2024
ODCM Radiological Effluent Occurrences PI Data
Calculation
04/12/2025
71151
Miscellaneous
ODCM Radiological Effluent Occurrences PI Data
Calculation
07/11/2025
MSPI Derivation Reports - Unreliability Index for: Emergency
AC Power System, High Pressure Injection System, and
Heat Removal System
09/12/2025
MSPI Derivation Reports - Unavailability Index for:
Emergency AC Power System, High Pressure Injection
System, and Heat Removal System
09/11/2025
71151
Miscellaneous
PBF-1650
MSPI Unavailability and Verification Report for: Emergency
AC Power, High Pressure Injection, and Heat Removal
System from 07/01/2024 through 06/31/2025
4