B17409, Revises Request Previously Submitted by NNECO in Ltr & Modified by Ltr Re Use of ASME Code Section XI & Withdraws Requests for Relief

From kanterella
(Redirected from B17409)
Jump to navigation Jump to search
Revises Request Previously Submitted by NNECO in Ltr & Modified by Ltr Re Use of ASME Code Section XI & Withdraws Requests for Relief
ML20237B278
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 08/14/1998
From: Bowling M
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B17409, NUDOCS 9808180155
Download: ML20237B278 (3)


Text

- - _ _ _ _ _ _ - - - - _ _

l D Northeast ilope Ferry lld. (Route 156), Waterford, CT 06385 Nuclear En:rgy naistone Nocieu Power staisoo

, Northeast Nuclear Energy Company P.O. Box 128 4 . .

Weterfor<'. CT 06385-0128 (860) 447-1791 Fax (860) 444 4277 The Nortleast Utilities System AUG l 41998 l Docket Nos. 50-245 50-336 50-423 B17409 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station. Unit Nos.1. 2. and 3 Revised Reauest to Use an Alternative to ASME Code Section XI and to Withdraw Previousiv Submitted Reauests for Relief The purpose of this letter is to revise a request previously submitted by Northeast Nuclear Energy Company (NNECO) in our letter of December 15,19950) and modified by a letter dated June 12,1996.(2) These submissions requested relief from portions of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI and requested permission to utilize an alternative to the ASME Boiler j and Pressure Vessel Code,Section XI for the Haddam Neck Plant and Millstone Unit Nos.1,2, and 3. Specifically, NNECO is withdrawing its requests for relief as follows:

Millstone Unit No.1, R&R No.1, R&R No. 2, Millstone Unit No. 2, RR-13, RR-14, and Millstone Unit No. 3, IR-23, IR-24. Additionally, NNECO is withdrawing its request to use Code Case N-389-1, " Alternative Rules for Repairs, Replacements, or ModificationsSection XI Division 1," for Millstone Unit Nos.1 and 2. The Connecticut Yankee Atomic Power Company's (CYAPCO) requests for the Haddam Neck Plant were previously withdrawn by CYAPCO in a letter dated February 18,1997.9) The

. applicability of Code Case N-389-1 is now limited to Millstone Unit No. 3 for the l \

UI Letter dated December 15,1995 (B15120), from E. A. DeBarba to U. S. Nuclear Regulatory l Commission, "Haddam Neck Plant, Millstone Nuclear Power Station, Unit Nos.1,2, and 3, i Request for Relief from Performing Certain Repair and Replacement Activities in Accordance l with ASME Code Section XI and a Request to Use a Code Case Revision."

  • Letter dated June 12,1996 (B15659), from T. C. Feigenbaum to U. S. Nuclear Regulatory Commission, "Haddam Neck Plant, Millstone Nuclear Power Station, Unit Nos.1,2, and 3,  ;

Revision to Requests for Relief from Performing Certain Repair and Replacement Activities in 1 Accordance with ASME Code Section XI." ,

  • ) Letter dated February 18,1997 (B16219)c from T. C. Feigenbaum to U. S. Nuclear f Regulatory Commission,"Haddam Neck Plant, Status Of Proposed License Amendments and i j

^

Relief Reauests." '

l 9008180155 980814 PDR ADOCK 05000245

' 'l

_ ___ ____ __________ _ __ _ _ a

1 U.S. Nuclear Regulatory Commission

. B17409\ Page 2 remainder of its current 10 Year Inspection Interval. Therefore, our previously submittedre'que'st for permission to utilize Code Case N-389-1 for Millstone Unit No. 3 remains.

This modification to our previous requests is based on changes to the Code which have occurred since our original submittal and which are not consistent with the positions previously submitted. NNECO currently considers compliance with the Code in these areas to be appropriate based on our current Code applicability.

Code Case N-389-1 has been incorporated into Section XI in the 1988 Addenda which is approved for use in accordance with 10CFR50.55a and thus represents the basis to determine that the requirements in this Code Case provide an acceptable level of quality and safety.

There are no commitments made within this letter.

If you should have any questions regarding this request, please contact Mr. R. W.

Flanagan at (860) 444-5817.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY I

Martin L. Bowling /

Recovery Officer - Technical Services Attachments (1) cc: H. J. Miller, Region i Administrator E. V. Imbro, Acting Director, Special Projects Office W. D. Lanning, Deputy Director, inspections, Special Projects Office W. M. Dean, Acting Deputy Director, Licensing and Oversight, Special Projects Office J. P. Durr, Branch Chief Inspections, Special Projects Office S. Dembek, NRC Project Manager, Millstone Unit No.1 T. A. Eastick, Senior Resident inspector, Millstone Unit No.1 D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 L. L. Wheeler, Senior Project Manager, PDND RWF:rf t

}

Docket Nos. 50-245  ;

50-336 f 50-423 B17409 l

I Attachment 1 Millstone Nuclear Power Station, Unit Nos.1,2, and 3 NNECo's Commitments l

1 l

I I

August 1998 l

U.S. Nucl:ar Regulatory Commission

. B17409\ Attachment 1 \ Page 1 Attachment 1 Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

Please notify the Director, Regulatory Affairs at the Millstone Nuclear Power Station of any questions regarding this document or any associated regulatory commitments.

Number Commitment Due N/A None N/A 1

i 1

l l

l

[