MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 ML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211L4901999-09-0101 September 1999 Forwards Insp Repts 50-313/99-12 & 50-368/99-12 on 990711- 0821.No Violations Noted ML20211J2351999-08-31031 August 1999 Forwards Request for Addl Info Re SG Outer Diameter Intergranular Attack Alternate Repair Criteria for Plant, Unit 1 ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211F4181999-08-25025 August 1999 Forwards SE Accepting Licensee 980603 & 990517 Requests for Approval of risk-informed Alternative to 1992 Edition of ASME BPV Code Section Xi,Insp Requirements for Class 1, Category B-J Piping Welds ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves IR 05000368/19990111999-08-12012 August 1999 Forwards Insp Repts 50-313//99-11 & 50-368/99-11 on 990719-23.No Violations Noted.Insp Focused on Review of Licensed Operator Requalification Program & Observation of Requalification Exam Activities at Unit 1 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 ML20210L3581999-07-29029 July 1999 Ltr Contract,Task Order 43, Arkansas Nuclear One Safety System Engineering Insp (Ssei), Under Contract NRC-03-98-021 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D8131999-07-28028 July 1999 Forwards Request for Addl Info Re SG Tube End Cracking Alternate Repair Criteria for Plant,Unit 1 ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 ML20210C2191999-07-21021 July 1999 Forwards Insp Repts 50-313/99-08 & 50-368/99-08 on 990530-0710 at Arkansas Nuclear One,Units 1 & 2,reactor Facility.No Violations Noted.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations ML20209H5251999-07-15015 July 1999 Informs That as Result of NRC Review of Licensee 980701 & 990311 Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 RAI, Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20209E5551999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1,staff Revised Info in Rv Integrity Database & Releasing Database as Rvid Version 2 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20210K1621999-07-0707 July 1999 Informs That Licensee in Process of Preparing Scope of Service Delineation for Environ Assessment to Be Performed for New Airport Located Near Russellville,Ar,To Identify Anticipated Environ Impacts from Various Agencies 1CAN079902, Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation1999-07-0606 July 1999 Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 0CAN069906, Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages1999-06-30030 June 1999 Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages 1CAN069905, Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs1999-06-17017 June 1999 Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs 0CAN069903, Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii)1999-06-10010 June 1999 Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii) 2CAN069901, Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 20001999-06-0202 June 1999 Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 2000 1CAN069901, Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice1999-06-0202 June 1999 Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice 0CAN059906, Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs1999-05-28028 May 1999 Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs ML20207E4341999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Changes in ECCS Analysis for ANO-1.CRAFT2 Limiting PCT for ANO-1 Was Bounded by 1859 F PCT Calculated at 2568 Mwt for Crystal River 3 Cold Leg Pump Discharge Break Size of 0.125 Ft 1CAN059904, Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn1999-05-20020 May 1999 Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn 2CAN059906, Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-11999-05-18018 May 1999 Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-1 1CAN059902, Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program1999-05-17017 May 1999 Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program 2CAN059905, Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative1999-05-14014 May 1999 Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative ML20206P7681999-05-10010 May 1999 Forwards Applications for Renewal of Operating License (Form 398) for MW Little & F Uptagrafft.Without Encl 2CAN059903, Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance1999-05-10010 May 1999 Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 ML20206H7121999-05-0606 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept, for Ano.All Radionuclides Detected by Radiological Environ Monitoring Program During 1998 Were Significantly Below Regulatory Limits 1999-09-09
[Table view] |
Text
~
3
.. =. ;
f
- y. "t Entergy opetetlons,Inc. l 1448 SA 333 !
Y:- fkasese, AR 72601 !
Tel 501858 5000 December 16,1997 10CFR50.55a 2CAN129702 -
' U. S. Nuclear Regulatory Commission Document Control Desk Mail Station OPI-17 Washington, DC 20555
Subject:
Arkansas Nuclear One - Un't 2 Docket No. 50 368 LMaa No. NPF-6 ANO-2 End of Period Inservice Inspection (ISI) Summary Report Gentlemen:
Pursuant to the reqairements of 10CFR50.55a, ISI summary reports for ASME Class 1 and 2 pressure retaining ccmponents and their supports for Arkansas Nuclear One, Unit 2 (ANO-2) are provided for your review. The results presented by this letter are represmta'ive of the second inspaction period of the second ten year inspection interval. This submitta is provided in accordance with ASME Section XI IWA-6230 and Code Case N-532. Attachment 1 provides ASME form OAR-1, Owner's Activity Report. Attachment 2 consists of an abstract of examinations and tests, conditions requiring evabation, and actions necessary for continued service. Please note that the abstract of actions for continued service (Attachment 2, Table 3) includes all of the corrective measures during the second inspection period and ilmt only the three corrective measures indicated by the asterisks were required for continued serAce.
Previous NRC review of the 'ANO-2 Inservice Inspection Program (NRC Inspection Report 50-36HS.23) noted that the ANO-2 ISI Program included the 1989 Edition of the ASME
'Section XI Code as the applicable examination requirements for Class 1 valve body internal surfaces-(Examination Category B-M 2). In accordance with NRR guidance regarding notification to the NRC sf the use of this edition of the code, this letter serves as a formal notification that ANO-2 has chosen to uw this NRC approved edition of the code.
Should you hs,ve any questions or comments, please contact me.
9712300229 971216 * -
PDR ADOCK 05000368 -
O PDR; ,,I b d U .,' d h lll$$$lkIMIII!II.I d
U. S. NRC December 16,1997 2CAN129702 Vay truly yours,- .
NA S Dwight C Mims Director, Nuclear Safety DCM/mkg' Attachments .
l
- cc: Mr. Ellis W. Marschoff Regional Administrator ,
U. S Nuclear Regulatory Commission - .
, Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72R47 i
Mr. George Kalman NRR Project Manager Region IV/ANO-1 U. S. Nuclear Regulatory Commission ,
NRR Mail Stop 13 H 3 One White Flint North 11555 Rockville Pike Rockville, MD 20852 t
t t
- .+- _ _ , .,g'_ , __, y _
t
ASME FORM OAR-1 OWNER'S ACTIVITY REPORT l l
l t
l
\
- - - - - . - . _ . . . _ . ~ _ . . _ .
PORM OAR.1 OWNER *8 ACTivlTY REPORT __
i N Nal II A Owmar __ Esderar Anspsme Inc./ P. O. ber 951.TCSY Tener. Lane Red. AR 7 2 2113
(>teme and Asseeme 1 Osmer)
Plesd Athensee " - One /14d8 E R. 233. R~ * ". AR 728D1 .
(tesmo and Address of plant)
UngNo. 2 Commeroimi servios da's March 28.1900 RefuehnB outape no. 2R11 (N opidumbto)
Curved inspeessa intera l tecend f2nd inseesgentgerval (1st,2nd, and,4th, other)
Current imessoWon perted At(Qad)inacechun Forted . .
(1el,2nd. 3rd)
Edneoa and Addende of Section XI apphostdo lo the inat==rman plan ites Edman INo .t__ .c _ _ _ _ _ .
Date end revtsien of hepochen pian Desember 22.1883 / Reesir d Ednen and Addenes of Secten XI appha=W= to repente and . ._ QY#. d then the inepecten pien,,,3 / A CORitPICATE OF CONPORMOICE l certdy that the oestemente made in thee Ownere Acevity Report are correct, and that the seeminehens, teet, repaire, t., _ . . _ ,
" -S~e, and correct 6ve meneures reprenanted try this report conform to the rostuiremente of Soolion XL Ceridicate of AuthortreNon No. N/A Empirelum Date N/A (W e)
Signed M4I Menneer. Ergingetne i t Proerems Date /2 M 7 Owner or Ownere Dentynes Tate / '
CERTIFICATE OF INeeRVICE INSPECTION 1, the underwened, holding a vehd commisanon tenued by the Nahonal toerd of toine and Pressure veneel triepectors and and employed by Arkwrishi Musueunsurance ca. of the state or Province of __ Athenees Walthent MA have 6nepected the noms descrbed in thie Owner's Actmly Report, daring the pened - Antil 24. ited to __ March 26.1901_ . and state that to the base of my knowledes and benef, the owner hee pasarmed me enhvaise repreeerded by the report in sooordance weh the requirements of Sechen XL Sy signing this eerWAoste nenhor the inepmotor nor lue employe mehes any vertenty, esqweemed or impiled, concervune # e eneminamons,teste, repairs, r ._.._, evelustions and corvecove measures doecribed this report. Furthermore, neither the inspector nor his employer shoe be Embio in any menner for any percors'inhary or property demeGe or a lose of any kind oneine from or weh this inapochon
- d@nHbM Commmeions _._f6 RARK 1064 *N* *f* T Nehenet Soord, State. Provence, and Endorsemente Inspectore SWe Date / 2. 9 '7 This form (E00127) may be obeelnad from the Order Deld., ASN,22 Low Drive, Don 2300, Fenfeid, NJ 07007 2300 i
-u,. . . - . - , . , , ,, , _- , , -,_, , ,- , ,. . , . , , ...,.-ng- m- ,,
f i
/
i i
ATTACHMENT 2 !
i TABLE 1 1
ABSTRACT OF EXAMINATION AND TESTS TABLE 2 f
ITEMS WITII FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE TABLE 3 ,
ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE l MEASURES REQUIRED FOR CONTINUED SERVICE 3
L l
i 4
l-
-,-.r--.-.
, ....m, ,w--,,m, w -..-n-
- - - -- . - , .y- --y, y -- - , - , . ~ . . , - ,iy,-. r. --- ,_ v -. . , e
t TABLEI ABSTRACT OF EXAMINATIONS AND TESTS -
Total Examination Total Total Total Examinatsees -
Category Exameimations Examinatices Examinatices Credited (%)
Required for Credited for Credited (%) To Date for (See Note 1) The laterval This Period for The Pened The laterral Remarks B-A 16 '/ 3of Bl.40 N/A N/A Interval total to date consists of'/ 2 of Upper ShcIl-to-Flange Weld (Bl.M) and3/ of Weld Closure Head-to-Flange Weld (81.40). Balance of B-A to be NE,s.M 3rd pmod.
B-B 7 3 42.86 71.43 A Relief Regis st is required for exceedmg the 1996 Code 2nd inspection pened apper limit of 67% per Table 1%%2412-1.
B-D 34 12 35.29 64.71 B-F 28 9 32.14 64.29 B-G-1 216 72 33.33 66.67 B-G-2 16 7 43.75 62.50 B-H 2 1 50.00 100.00 Per IWB-2412 of the 1986 Code, if there are less than 3 items in an Examination Category, the items may be examined in any two perd B-J 170 57 33.53 67.06 B-K-1 10 3 30.00 50.00 B-N-1 1 1 N/A N/A Arrmible areas of the Reactor Vessel Interior are inspected each penod.
C-A 8 3 37.50 75.00 A Relief Request is required for exceeding the 1986 Code 1st inspection penod apper t limit of 34% and the 2nd in=wtaa i pened upper limit of 67% per Table IWB-2412-1.
C-B 10 4 40.00 60.00 C-C 32 9 28.13 62.50 C-F-1 112 30 26.79 60.71 C-F-2 31 12 38.71 64.52 D-B 96 28 29.17 59.38 F-A 211 76 36.02 64.93 Note 1 Certain Examination Categones, which are not subject to the percentage requirements ofTabic IWB-2412-1. are omitted from Table I for the reasons provided below Due to lack of gmdance in the 1986 Edition of the ASME Secten XI Code, for clarification purposes only,1995 Edition IWB 2412 paragraph referenas are provided.
-- Examination Categories B-P and B-Q per IWB-2412(a)(1)
- Examination Categories B-E, B-lel, B-M-1, B-N-2, B-N-3 and B-O per IWW2412(aX2) - deference allowable until the eM of an ispion interval
- Examination Categoriet B-L-2 and B-M-2 per IWB-2412(a)(4) - deference allowable until disassembly of component for maintenance, repair or volumetnc examination
! TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUrRED EVALUATION FOR CONTINUED SERVICE Mew or Menevent Comeden Feued Denug Scheduled Sectien XI Essassenties Iten Esaminasica er Test Category Number Itesa Description Flaw C W (Yes or No)
B-A Bl.40 Rea-tor Vessel Closure Head - Flange External Surfam Several Surfam Marks No B-B B2.40 Steam Generator 2E24B - Lower Extension Ring to Tube Subsurface labcations frosa an extnmos / Yes Sheet Weld fabocation stnnger and back-ground userfaz area B-G-1 B6.10 / 30 / 50 Reactor Vessel C osure Head - Nuts / Stads / Washers Pitting on exposed Surfaces Yes B-H B8.20 Pressuruer- Support Skirt to Bottom Head Weld Linear Surface Indication - acar surface slag line Yes B-F B5.130 Reactor Coolant Cold Leg - Dissimilar Metal Piping Weld Linear Surface Indscation - smeared income! Yes B-F B5.130 Safety injection System - Dissimilar Metal Piping Weld Three Linear Surface ladications Yes B-J B9.11 Shutdown Cooling System - Piping Weld Two Unear Surfam larbca'nons Yes B-J B 9.40 Reactor Coolant Cold leg Drain Liric - Piping Weld Linear Surface Gouge Yes B-J B 9.21 Cnemical and Volume Control System - Piping Weld Lancar Surface Gouges Yes B-J B 9.21 Chenucal and Volume Control System - Piping Weld unear Surface Geg: Yes B-N-1 B13.10 Reactor Vessel-Interior Surface Foreign Materialon Lower Core Plate Y-s F-A Fl.30B Senice Water System - Multi-Directional Restraint Cormsson Degradanon No F-A Fl.30B Service Water System - Multi-Directional Restraint Corrosion Degradation No F-A n/a Reactor Coolant System - Vanable Spring Improper Cold Imed Setting No l
F-A n/a Chemie=1 and Volume Control System - Vanable Spring Improper Ccid Load Setting No F-A n/a Che-nical and Volume Control System - Vanable Spring Improper Cold Imad Setting No F-A n/a High Pressure Safety Injedion System - Variable Spring Improper Cold Load Setting No <
F-A n/a steam Generator Sm.iiy System - Vanable Spring Improper Cold Lead Setting No F-A n/a Reactor Coolant System - Variable Spring Irnproper Cold Lead Setting No i
- -. . - , - - -, n , -- , -
TABLE 3 ABSTRACT OF REFAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINL'ED SERVICE -
Furw Or Metevnet remaie-- Found Repair, Descripties of Work During Schedmied Replacement Sectica XI RepairI Code er Corrective Items = -Indicates a Repair or Replacement Actmty Perforused due to Examiesties orTest Date 1, " -- -- - :
Class Measure Descripties a Flaw or Relevnet Ceedettee (Yes or No) C- ,%4 Mae Neumber 3 Reptarement Pump Replaced Pump 2P-40B N/A 06/16/94 93-2053 1 RgA.4 Vale Replaced Bonnet Studs and Nuts (2SI-14B) = No 13/18/95 93-2159 i RepI - t Valve Replxed Valve Disc (2SI-13D) N/A 4/21/94 93-2243 2 Repl e Support New Support (2HCB-7-H13) N/A 10,tM/94 93-2401 2 Peple Valves Replaced (2CV-5637-1/5638-2) N/A 6/30/94 93-2402 2 R eal-t
- Supports Moddy Supports (2HCB-7-Hil/H13) N/A 6/30/94 93-2403 3 2 Rept e Valve Replaced Valve Plug (2CV-1001) N/A 4/29/94 93-2421 2 Repte Valve Replaced Disc (2CV-1002) N/A I/24/95 93-2422 2 Repair Valve Machined Plug (2CV-5101-1) N/A i1/13/95 93-2430 2 Replacement Valve Replaced Disc Insert (2.PSV-4822) N/A 10/5/95 94-2005 I Rep 3 - ' Valve Replaced Valve (2BA-216) N/A 4/11/94 94-2030
'2 Replamment Valve Replaced Wedge (2SA48) N/A t/14/94 94-2134 2 Rept e Valve Replaced Disc (2CV-1052) N/A 6/3/94 94-2137 2 Rept e Support Modify Support (2HCB-9-H10) N/A 5/17/94 94-2176 2 Replacement Support Modify Support (2DCB-502-H002) N/A 6/20/94 94-2186 2 Replacement Support Modify Support (2DCB-3-H29) N/A 7/15/94 94-2206 3 Replacement Support Modify Support (2EBC-1-H25) N/A 7/28/94 94-2212 2 Repl e Support Modify Support (2CCB-8-H19) N/A 3/14/95 94-2214 2 Repair Support Modify Support (2HCB-33-H4) N/A 8/1084 94-2229 2 Repair Support Modify Support (2GCB-3-HI4) N/A 9/4/94 94-2230
TABLE 3 (Cost *d)
ABSTRACT OF REFAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE -
Mew or Relevant Comdsties Feued Repair, Description of Werk Durieg Scheduled Replacensent Sectise XI Repair /
Code or Cornetive Itess * -Indicates a Repair er Repiscensent Actisity Pe fernsed due to Esassinatsee er Test Deee Replacesseet Class Measure Description a Maw or Relevant Ceedities (Yes or No) Comepleerd Man Noaiker 3 Rcp-- - - - : Support Modify Support (2DBC-4-H2O) N/A 8/2/94 94-2255 2 RAe Support Modify Support (2HCB-21-H1) N/A 8/4/94 94-2258 2 R$-t Support Modify Support (2HCB-27-H9) N/A 8/24/94 94-2260 2 R$u- - -- -t Support Modify Support (2DCB-3-H20) N/A 10/15/95 94-2288 3 Real== Pipe Installed Flow Orifim (2FO-1400) N/A 12/13/94 94-2295 3 R$=rement Pipe Installed Flow Orifice (2FO-1402) N/A 12/13/94 94-22 %
3 Replacement Pipe Installed Flow Orifice (2FO-140l) N// 12/13/94 94-2297 2 Replacement Valve Replaced Disk Stack (2CV-4816) N/A 7/2L94 94-2300 2 Rep + <- - - Support Modify Support (2CCB-70-H2O) N/A 8/4/94 94-2306 Repair Pump Machined Pump Flange (2P-4A) N/A 12/13/94 94-2311 3 Repair Pump Machined Pump Flange (2P-4B) N/A 12/13/94 94-2312 2 Replacement Support Modify Support (2HCB-42-H4) N/A 9/30/95 94-2315 2 Rept= cement Support Modify Support (2DCB-13-H005) N/A 9/1/95 . 94-2317 3 Rept=rement Support Modify Support (2HCC-282-HI) N/A 5/2/75 94-2340 3 Replacement Support Modify Support (2HCC-32-H6) N/A 5/12/95 94-2341 <
3 Replacement Support Modify Support (2HCC-32-H5) N/A 5/12/95 94-2342 3 Rcp- --a = Support Modify Support (2HCC-32-H4) N/A 5/12/95 94-2343 3 Replacement Support Modify Support (2HBC-2-H18) N/A 10/7/95 94-2352 3 Repair Support Repair Support Welds (2HBC-59-H4) N/A 4/27/95 94-2356 3 Repair Support *epair Support Welds (2DBC-1-H4)
. N/A 2-27-% 94-2357
4 TABLE 3 (Cost'd) -
ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERV 1CE Mew Or Relevant -
remaies Femed Repair, Descriptise of Werk During Scheduled Sectise XI Repair /
Replacement
- -ledecates a Repair er R./ x- ;; Activity Perferend due se Ermeimetion er Test Deee -/ _= 4 Code or Corrective Iteam Descripties a Raw or Relevant Ceedities (Yes orNo) Completed Flee W Class Measure Valw Replaced Bonnet and Disc (2SI-26A) N/A III2/96 94-2360 I Replacement N/A- 4695 94-2363 3 Rep 8 e Valve Replaced Disc (2GZ-1)
N/A I/12/95 94-2405 3 Frpt - t Support Modify Support (2EBC-2-H5)
Replaced Wedge (2CV-4731-2) N/A 12W 95 94-2410 I Rept-t Valve N/A 10/20/95 94-2413 2 R,pa-t Valus Replaced Valves (2CVC-22C/69C)
N/A 10/26/95 94-2414 2 R,pa- Pipe Weld at Line Break for 2CVC-69C Modify Support (2CCB-16-H003) N/A 10/26/95 94-2415 2 Replacement Support New Pipe Welds to 2M-116C N/A 10/26/95 94-2417 2 RepI - t Dampner Modify Support (2HCB47-HI) N/A 10/26/95 94-2418 2 RepI - t Support _-
Modify Supports (2CCB-84113/2CCB-1641003) N/A 10/26/95 94-2425 2 Replacement Supports Support Modtry St . + wt (2DBC-3-HI1) N/A 3/13/95 94-2442 3 Fep3 - t Valve Replaced Plug and Bonnet Stads/ Nuts (2CV-4826) N/A 10/13/95 94-2455 2 Rept - t Pipe Replaced 3" Elbow (N-416-1) N/A 10/12/95 94-2458 2 Replacement Support Repair Support Weld (2GCB-164114) N/A i1/10/94 94-246I 2 Repair Dampner New Pipe Welds to 2M-116A N/A 10/26/95 94 2464 2 Replacement Welds at Line Break for 2CVC-69A N/A 10/26/95 94-2465 2 R$-t Pipe Valus Replaced Valves (2CVC-22A/69A) N/A 10/26/95 94-2466 2 PT-t Modify Support (2HCB-2) N/A 10/26/95 94-2467 2 Pent-st Support N/A 10/16/95 94-2468 2 Repair Valus Trim Valve Ends (2CVC-22A/69A)
Modify Support (2CCB-18-H2) N/A 10/26/95 94-2478 2 Replacement Support
' a . .. , . , - _ _
TABLE 3 (Cent'd) ~
ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE new or nelevant '
Ceedioise Feeed A.Z~ of Werk Beneg Schedoled Repair, Repair /
Sectiem XI i L;" =_: Deee Replers-e=8
= - Indicates a Repair er 1," 4 Activity Perfenmed due se Fummimmes== or Test Code er Corrective Iteen --
(Yes or No) Cemspleted Plan Neenber Claen Meneere Descripties a Mew or Relevnet Ceeesties N/A I/1735 94-2479 3 Pep 3 - ae=* Vaht Replaced Disc (2EFW-48)
N/A 5/2336 94-2544 2- Penair Vaht Machined Wedse (2CVC-23A)
N/A I/16/95 95-2009 3 Replacemens S= p Modify Sp. (2HCC-58-H12)
N/A I/17/96 95-2027 2 Rqi- g--= Vahr PepI=d N=le Disc, Inlet Studs (2PSV-1004)
N/A I1/16/96 95-2055 2 Repair / Vaht Machined Disc / Replaced Boomet Studs (2CV-1052)
Reph w Yes 10/10/95 95-2057 1 Rep scr:N t
Sappnet Modify SW (2CCA-26-H2) =
N/A 5/3135 95-2147 2 R 8-ment &=part Modify Sappart (2HCB-39-H17) i N/A 10/20/95 95-2167 2 Re;!- - ---- ^ Vaht RepI=d Valve Nozzle and Disc (2PSV-1004)
N/A 10/2035 95-2173 2 Reat-me=* Vaht Rep 3 d Vahe Nozzle and Disc (2PSV-1054)
N/A 10/20/95 95-2175
! 2 Rept = =ent Vaht Replaced Valve Nozzle and Disc (2PSV-1055) i Vaht Replaced Valve (2PSV-4633) N/A I1/t755 95-2176 I Replacement N/A II/17/95 95-2178 i Rept-ment Vaht Replaced Valve (2PSV-4634)
Support Repaned Support Weld (2HCC-231-H006) N/A 7/735 95-2190 3 Repair N/A 7/5/95 95-2191 3 Repair Support Repaired Support (2HCC-236-H006)
N/A 9/1965 95-21 %
2 Rep 3-mene Vaht Replaced Disc (2SI-10C)
Machined Face for New Seal Ring (2SI-15B) and Installed New N/A 2/8/96 95-2202 1 Replacement Vaht Bonnet / Studs and Nuts Machined Face for New Seal Ring (2SI-15D) and Installed New N/A 2/8/96 95-2203 1 Replacement Vahe Bonnet /Stads and Nuts Installed Lugs (2HBC-34-H18) N/A 10/1235 95-221I 3 Replacement Support l
TABLE 3 (Cent'd) ~'
ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECI'IVE MEASURES REQUIRED FOR CONTINUED SERVICE Flow Or Relevant re-data = Found Repair, Descripties of Werk During Sch=ed=4 m;' _ .:
Sectise XI Repair /
Code er Corrective Items * - Indecases a Repeer er L;' - ; Activity Perforuned due to F=h er Test Doet argn=r-===a Class Measure Descripties a Flaw or Relevast C== dei == (Yes er No) Ceampleted Plan Maasber 1
3 Replacement Support Modify Support (2HBC40-H3) N/A 10/1335 95-2212 3 Replacement Support Modify Support (2HBC40-H5) N/A lof13M5 95-2213 j 3 Red- Support Modify Support (2HBC49-H2) N/A 10/13/95 95-2214 i 3 R$e Support Modify Support (2HBC-78-HI) N/A 10/1385 95-2215 3 Replacement Suppost Modify Support (2HBC-78-H3) N/A 10/1385 95-2216 2 R ; * - -- =^ Support Modify Supports (2CCB-2-H011. H013. H014) N/A 10/1955 95-2219 3 R$- Support Modify Support (2HBC43-H010) N/A 10/19/95 95-2220 3 R$~ Support Modify Support (2HBC-278-H002) N/A !0/11/95 95-2221 3 R$- Support Modify Supgest (2HCC-292-H15) N/A 10/11/95 95-2222 3 R$_ - Support Modify Support (2HCC-248-H001) N/A 10/4M5 95-2223 3 R$- Support Modify Support (2HBC-68-H002) N/A 10/4M5 95-2224 1 Rch..cr. 2T-1 Studs Replaad Manway Studs NiA 12/5/96 95-2226 3 Red - Pipe Replaced Semoe Water Pipe (Code Case N-416-1) N/A 10/1435 95-2227 3- RM- Pipe Replaced Semce Water Pipe (Code Case N-416-1) N/A 10/1435 95-2228 3 R-:p --- --- c Pipe Replaced Semce Water Pipe (Code Case N-416-1) N/A 10/1465 95-2229 t 3 Replacement Pipe Replaced Semoe Water Pipe (Code Case N-416-1) N/A 10/1435 95-2230 3 R$- Pipe RM Sema Water Pape (Code Crac N-416-1) N/A 10/14/95 95-2241 3 Replacement Pipe Replaced Semoe Water Pipe (Code Caee N-416-1) N/A 10/14/95 95-2242 l 3 Replacement Pipe Replaced Semoe Water Pipe (Code Case N-416-1) N/A 10/14/95 95-2243 3 Red - = ent Valve Installed New Valve (2SW-143A) (Code Case N-416-1) N/A 10/5/95 95-2245
. .. . - ____ __ -- J
l TABIE 3 (Cost'd) '
ARSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERV 2 3 Flow Or Relevant '
Candiden Found Repair, Descriptise of Work During Schedeled Replacemeest Sectism XI Repair /
Code er Corrective item * - Indicaces a Repair er N' :4 Activsty Federused dae to Fa===i==ss== or Test Date Repiseessent Class Measure Descripties a Flaw or Relevant Candielen (Yes or No) Casapieted Flem Namiher 3 Replacernent Valve Installed New Valve (2SW-144 A) (Code Case N-416-1) N/A 10/535 95-2246 3 F='=------^ Valve Installed New Valve (2SW-1448) (Code Case N-416-1) N/A 10/1435 95-2247 3 RAwa Valve Installed New Valve (2SW-143B) (Code Case N-416-1) N/A 10/14/95 95-2248 2 Righ ---:- ^ - Support Modify Support (2FCB-22-HO12) N/A 10/18/95 95-2250 2 Replacement ' Support Modify Support (2CCB-17-H2) N/A 10/1965 95-2251 2 Psp = - --- - ^ Support Modify Support (2HCB-68-HI) N/A 10/19/95 ' 95-2252 2 R$w Dampner New Pipe Welds to 2M-II6B N/A 12/14/95 95-2253 2 Ref=- -- Support Modify Support (2CCB-11-H10) N/A 10/19/95 95-2256 2 Repe Valves Replaud Valves (2CVC-22B/69B) (Code Case N-416-1) N/A 12/14M5 95-2257 2 Repair Valves Trim Valve Ends (2CVC-22B/693) N/A 12/I4/95 95-2258 3 Rcp!= - --- - - Support Modify Support (2HCC-2-H001) N/A 10/13/95 95-2259 2 Repair Valve Trim Vaht: Ends (2CV-5057-2) N/A 9/15/95 95-2261 2 Repair Valve Trim Valve Ends (2CV-5017-1) N/A 9/15/95 95-2262 2 Repair Valve Trim Valve Ends (2CV-5077-2) N/A 9/15/95 95-2263 2 Repair Valve Trim Valve Ends (2CV-5037-1) N/A 9/15/95 95-2264 2 Rep e Valves Upstream Welds of Valves (2CV-5037-l/5077-2) N/A 10/26/95 95~2265
'! ~
2 R=laceaneae Valve Downstream Welds of Valve 2CV-5037-1 N/A 10/26/95 95-2266 2 Replaament Valve Downstream Welds of Valve 2CV-5077-2 N/A 10/26/95 95-2267 . l 2 R6p;- -
r---= Support Modify Support (2DCB-3-H2O) N/A 10/26/95 95-2268 2 Repl e Valve Installed Valve 2SI-72 N/A 10/26/95 95-2269 i
TABLE 3 (Cont'd) ~
ABSTRACT OF REFAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Maw Or Relevant ~
Ceedseien Feued Repser, Description of Work During Scheduled Replacessent Seeden XI Repair /
Code orc 1; Items * - Indicates a Repair er Replacennent Aedway Perfenmed due to E===i==*i== or Test Deee IRepaan aseet Class Meanne Descripties a Maw or Relevant Ceedetsen (Yes or No) Casepleeed Flem Neusher 2 Psy= - - =r- Vahrs Installed Vahes 251-73/2S1-75 N/A 10/26/95 95-2270 2 Psy=- - --a r^ Vahts Replaced Vahts 2CV-5035-1/2CV-5036-2 N/A 10/2655 95-2271 2 Replacement Vahts Installed Vahr 251-74 and Replamd Vahts 2CV-5076-2/2CV- N/A 10/26/95 95-2272 5075-1 3 Replacement Support Modify Support (2HCC-21-H001) N/A 10/765 95-2277 2 Rp = - - a r ^ Support Modify Support (2CCB-2-H005) N/A 7/11/95 95-7279 2 Rey +_ _=-ara Support Modify Support (2DBB-3-H8) N/A 10Mw35 95-22 %
2 Repair Support Rew:Id Broken Tack Weld (2 EBB-2-H2)
- No 10/3/95 95-2297 2 Pp - --- at-Vaht Replaced Piping Weld Upstream of Valve 2CV-5057-2 N/A 10/26/95 95-2299 2 Real-it Vahr Replaced Piping Welds Dov,ha of Vahr 2CV-5017-1 N/A 10/26/95 95-2301 2 Repla ment Vaht Replaced Piping Welds Downstream of Vahr 2CV-5057-2 N/A 10/26/95 95-2302 2 R8y ---.t Vaht Replaced Piping Weld Upstream of Vahr 2CV-5017-1 N/A 10/26/95 95-2303 2 Real-t Support Modify Support (2DBB-7-H14) N/A i1/2/95 95-2304 2 Rep 3-t Support Replaad Support (2CCB-71-H15) N/A 10/18/95 95-2305 2 Rept - t Support Replaced Support (2CCB-704127) N/A 10/15/95 95-2306 2 Repair Support Add Weld Metal (2 EBB-14173 N/A 10/6/95 95-2307 y a
3 Rept-t Support Modify Support (2HCC-284-HI) N/A 10/11/95 95-2308 i 2 RepI - t Penet. Install laboard / Outboard Blind Flanges on 2P-53 N/A I1/1/95 95-2312
- 2 Replacement Vaht Replaced inlet Nuts (2PSV-1056) P/A 1/17/96 95-2318 t 2 Replacement Vaht Replaced Noizie and Disc (2PSV-1056) N/A 10/20/95 95-2324 l.
o TABLE 3 (Coat'd) '
ABSTRACT OF REPAIRS, REPLACEMENTS OR CORRECTIVE MEASURES REQUIRED FOR CONTLNUED SERVICE 1
Flew Or hmet ,
Ceedities Feued Repair, Description et Work During Scheduled RepIncenicet Section XI Repair /
Code or Correctrve leenn * - Indicates a Repair or Replacemeest Activity Performed due to Exameinsties or Test Date P ;" -w :
Class Measure Description a Flaw or Relevnet Condities (Yes or No) C; -f14 Plan Nuesber 2 RepI m Valve Replaced Piping and Valve 2CVC49B (Code Case N-416-1) N/A ;2/14/95 95-2326 2 Replacement Valve Replaced Valve 2PSV-4822 N/A i1/17/95 95-2330 2 Replacement Support Modify Support (2 EBB-5-H005) N/A 10/26/95 95-2332 3 Replacement Support Modify Support (2HCC-185-HO17) N/A 10/24/95 95-2333 2 Repair Pipe Removed "N" Stamp from Piping (2CCB44) N/A 11/5/95 95-2335
? Replacement Support Modify Support (2CCC-11-H00l) N/A 10/23/95 95-2339 1 Replacement Support Modify Support (2BCA-14-HI4) N/A 10/25/95 95-2341 1 Rept - Support Modify Support (2BCA-14-H6) N/A 10/25/95 95-2342 1 Replacement Support Modify Support (2BCA-14-H3) N/A 10/25/95 95-2343 3 Replacement Support Modify Support (2HBC49-H2) N/A 10/19/95 95-2345 I Replacement Support Modify Support (2BCA-14-H5) N/A 10/25/95 95-2351 2 Replacement Support Modify Support (2GCB-5-H6) N/A 07/23/96 95-2354 3 Replacement Valve Replaced Valve (2MS-39A) N/A I1/15/95 95-2357 3 Rep!-r Valve Repizced Valve (2MS-39B) N/A 11/15/95 95-2358 3 Replaament Valve Replaced Valve Internals (2CV-1456-2) N/A 11/16/95 95-2360 1&2 Replacement Snubbers Replaced Various Scubbers N/A 10/20/95 95-2379 3 Rept e Valve Replaced Valve Bonnet and Bonnet Bolting (2FP-27) N/A 6A)3/96 % 2054 1 Replacement 2T-1 Studs j Replaced Manway Studs N/A 12/5/96 % 3120
..