2CAN029505, Forwards ANO Unit 2 SG Circumferential Cracking Evaluation, Including Results of Special SG Tubing Insp Conducted During Planned mid-cycle Outage 2P95-1

From kanterella
Jump to navigation Jump to search
Forwards ANO Unit 2 SG Circumferential Cracking Evaluation, Including Results of Special SG Tubing Insp Conducted During Planned mid-cycle Outage 2P95-1
ML20080H659
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 02/17/1995
From: Mims D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20080H660 List:
References
2CAN029505, 2CAN29505, NUDOCS 9502230208
Download: ML20080H659 (2)


Text

_

e

-: = ENTERGY.

Entergy operations, Inc.

1448sa 333 RwAldie, AR 72801 Tel501858 5000 i

February 17,1995 2CAN029505 U. S. Nuclear Regulatory Commission l Document Cct. trol Desk l Mail Station PI-137

Subject:

Arkansas Nuclear One - Unit 2 Docket No. 50-?68 License No. NPF-6 2P95-1 Steam GeneratorInspection Results  !

and Circumferential Cracking Evaluation i

Gentlemen:

Arkansas Nuclear One, Unit 2 (ANO-2) Technical Specification 4.4.5.0 requires the results of the special steam generator tubing inspection conducted during the planned mid-cycle outage 2P95-1 ,

to be reported to the NRC within thirty days of resumption of plant operation. 'Ihese results have i been included in the attached engineering report which provides a comprehensive evaluation of the impact of circumferential cracks on the structural integrity of ANO-2 steam generator tubing. 'Ihis report also fulfills the commitment made during Entergy Operations' July 14,1994, presentation to the NRC discussing the ANO-2 steam generators to provide more detailed information to support the presentation materials. Ifyou have any questions regarding this submittal, please contact me.

Very tmly yours, M

Dwight C. Mims Director, Licensing DCMT.dd attachment i

e 90l i 9502230208 950217 // l PDR ADOCK 05000368 /

P PDR ,

w ,

1 I

g . U. S. NRC .  !

l February 17,1995 l

2CAN029505 Page 2 l

J cc: Mr. Leonard J. Callan Regional Adnsrd.h.ici  ;

U. S. Nuclear Regulatory Commission {

RegionIV  :

611 Ryan Plaza Drive, Suite 400 Arlington,TX 76011-8064 NRC SeniorResidentInspector

1448 S. R. 333 l Russellville, AR72801  ;

Mr. George Kalman - i NRR Project Manager Regen IV/ANO-1 & 2 ,

U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike Rockville, MD 20852 ,

i 7

i I

f f

l l

1 l

l l