05000416/LER-1982-172, Update 2 to LER 82-172/99X-2:on 821210,penetration AE154C in Auxiliary Bldg Opened.Caused by Planned Maint Activity. Hourly Fire Watch Established.Penetration to Be Resealed by 830910

From kanterella
Jump to navigation Jump to search
Update 2 to LER 82-172/99X-2:on 821210,penetration AE154C in Auxiliary Bldg Opened.Caused by Planned Maint Activity. Hourly Fire Watch Established.Penetration to Be Resealed by 830910
ML20080A174
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/12/1983
From: Mcgaughy J, Rohrer M
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
AECM-83-0394, AECM-83-394, LER-82-172-99X, NUDOCS 8307250193
Download: ML20080A174 (2)


LER-2082-172, Update 2 to LER 82-172/99X-2:on 821210,penetration AE154C in Auxiliary Bldg Opened.Caused by Planned Maint Activity. Hourly Fire Watch Established.Penetration to Be Resealed by 830910
Event date:
Report date:
4162082172R00 - NRC Website

text

NRC FCCM 366 U. S. NUCLEAR REGULATORY COMMISSION c.7n

~

Update Report - Previous $ N M k RT Attachment to AECM-83/0394 Page 1 of 1 CONTROL SLOCK: l l l l l  ! l spLEASE PalNT em TWE ALL REEUIRED INFORMATION) 10lilll 7 8 9 4 Sl:LICENSEE d etCOOE d 11@l O f d -l 0101 84 il d 0101 -1 d O @l2 4 fLICENSE LICSNGE Num 21 '

il i l ilTYPE 11@lJO 57 CAT 58l@

I CON'T I O l 1 l!

? 8

$v"RCs 60 l L St@l_ 01OOCKET d OlNUemEm Ol O l 4111 e e6 @EVENT 112l 1l Ol El DATg 74 275hl OREPORT l 711l2l8l3l@

OATE 80 l

EVENT DESCRIPTION. AND PROSA8LE CONSEQUDeCES h I O 12 ll l_Qn_ December 10. 1982. oenetration AEi54C in the Auxiliary Buildina was i ,

[TTTh l opened to perf orm a planned maintenance activity. This penetration is at IOl4lIlfire rated assembly required by T.S.3.7.7. This condition has na affect)

Io I s p lon the health and saf ety of the public and does not constitute a threat l l 0 l61 l to plant saf ety. This is a Special Report pursuant to T.S.3.7.7a. j 10171 1 1 101811 I 7 8 9 #

Orat SUSC COndPONENT CODE SUS dE S E l 0 l 9 l:

7 8 I f4 B lh Wh Jh l Zl Zl Zl Z l Zl 7 @ [ZJ@ ] @

9 90 11 12 13 18 19 20

. SEQUENTIAL OCCUR RE NCE REPORT REVISION LER RO REPORT 8so. CODE TYPE NO

@ ,ayg.-u EVENT181 21 VE AR

,,,,2 7 22 l--J 23 1 1171 21 24 36 W

27 LE 2 29 I xl 30 8

31 12i 32 TAK N A ON N1 HOURS TT FOR 8. SUPPL R MAP UF ACTURER lx J._l@LxJ@. 34 . LZJ@

36

_ LB@

JS lol 9 37 I9 lNj g e 44 lNjg 42

] g 43 lZl 9l9l 9lg 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTDONS h l lilOlllThe penetration was opened during a planned maintenance activity to pu113 lilipl cables. An LCO was initiated and an hourly fire watch was established. t

, 2 l Work is currently in progress to reseal the penetration assembly and is g g nexpected to be completed by September 10, 1983. This is a final report.)

i a i 1 7 8 9 80 STA S  % POvv0R OTHER STATUS DISCOVER DISCOvFRY OESCRIPTION M j i s W @ li0h0l0 @ l @ Planned Action ACTry:TY CO TENT RFLE ASED OF RELEASE AteOU'f7 OF ACTivlTY, LOCATION OF RELE ASE i 6 r L, t.j h t,o .jgi M i iM 1 PERSOssNGL EXPOSURES MUnseen TYPE DE SCnePTION

, 7 1 1 0101 o lO".J.SLr )O= t =

,ERSO, EL

~u .ER o.SCR.R .O @

i a 1 I o I o l o l@t u 77,Sg Os ORto np A

  1. ACeurv @ k O Obh0h6 7

i 9 8 9 W hlM to PDR so l

OE RIPfeOps

  • 2 0 ISSUE @l E I llllllllllllI*

7 pi 9 10 68 69 80 .

NAME OF PREPARER M. V. ROhrer peg

l 1  !

MISSp~"@'hi9bsU.R & LIGHT COMPANY

' Helpini kiu'ild Mississippi l

P. O. B O X 164 0, J A C K S O N, MIS SIS SIP PI 3 9 2 0 5 83 J111.19tul@i,21083 J AM ES P. MCG AUGHY, JR viCE persicant Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30303 Attention: Mr. J. P. O'Reilly, Regional Administratnr

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-13 File 0260/L-835.0 Update Report - Penetration AE154C Opened to Full Cables Through It LER 82-172/99 X-2 AECM-83/0394 This letter submits an update to previous reports submitted on January 13, 1983, and March 15, 1983. The event for which the reports were submitted occurred on December 10, 1982, when penetration AE154C in the Auxiliary Building was opened in order to pull cable through it. A Special Report was submitted pursuant to Technical Specification 3.7.7.a.

Work to reseal the penetration assembly is currently in progress. The revised estimated completion dcte for the work task is September 10, 1983.

Attached is LER 82-172/99 X-2, which is a final report.

Yours truly, JPM: sap Attachment 7, / g tgM/

cc: Mr. J. B. Richard (w/a)

Mr. R. B. McGehee (w/o)

Mr. T. B. Conner (w/o)

Mr. G. B. Taylor (w/o)

Mr. Richard C. DeYoung, Director (w/a)

Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Ot prpT COW,# a Document Control Desk (w/a)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 E 2 s2; Member Middle South Utilitiet, System