05000301/LER-1995-003, Forwards LER 95-003 Re Rt Due to Turbine Generator Eg Control Sys Oil Leak

From kanterella
Jump to navigation Jump to search
Forwards LER 95-003 Re Rt Due to Turbine Generator Eg Control Sys Oil Leak
ML20082F390
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/05/1995
From: Link B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20082F392 List:
References
NRC-95-018, NRC-95-18, VPNPD-95-030, VPNPD-95-30, NUDOCS 9504120109
Download: ML20082F390 (1)


LER-2095-003, Forwards LER 95-003 Re Rt Due to Turbine Generator Eg Control Sys Oil Leak
Event date:
Report date:
3012095003R00 - NRC Website

text

,

r.y m y D&.- >

yo

{

Wisconsin Electnc POWER COMPANY

' 231 W Michgan.PO Box 2046.Mdwoukee WI 53201-2046 (414)221-2345

'VPNPD 95-030 NRC 95-018

-April:5, 1995 n

Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Ladies / Gentlemen:

DOCKET 50-301  !

LICENSEE EVENT REPORT 95-003-00 REACTOR TRIP DUE TO TURBINE GENERATOR ELECTROHYDRAULIC (EH) CONTROL SYSTEM OIL LEAK P_OINT BEACH NUCLEAR PLANT, UNIT 2 Enclosed is Licensee Event Report 95-003-00 for Point Beach Nuclear Plant, Unit 2. This report is provided in accordance with 10 CFR 50.73 (a) (2) (iv) , "The licensee shall report...any event or-condition that resulted in a manual or automatic actuation of any-engineered safety feature (ESF), including the reactor protection system (RPS)."

This report describes an automatic reactor trip initiated due to an oil leak in the Unit 2 turbine generator electrohydraulic (EH) control system.

Please contact us if any further information is required.

  • Sincerely, Bob k Vice P esident Nuclear Power Copy to: NRC Regional Administrator NRC Resident Inspector Enclosure DAW / cms 110145 "

9504120109 950405 PDR ADOCK 05000301 4i S PDR

' h6 i ,

.4 suMhryaf Mismnsh Ewas Ovpvathn