Forwards LER 89-010-00 Describing Generation of Containment High Pressure Signal During Leak Testing of Containment Penetrations for Facility
ML20059N926
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 10/11/1990
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059N927 List:
References
CON-NRC-90-103 VPNPD-90-436, NUDOCS 9010240026
Download: ML20059N926 (2)


LER-2089-010, Forwards LER 89-010-00 Describing Generation of Containment High Pressure Signal During Leak Testing of Containment Penetrations for Facility
Event date:
Report date:
3012089010R00 - NRC Website

text

_ _. - _ _ _ .__ _ _ _ _ _ _ _

Wisconsin

' liksctnc 1 POWER COMPAtH l l

231 W Mctsyan, PO Box 2M6. Wwoakee, WI 53201 (414)221 2345 l

l l

VPNPD-90-436 10 CPR 50.73 NRC-90-103 October 11, 1990 .

U. S. NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-137 Washington, D. C. 20555 Gentlemen:

DOCKET 50-301 LICENSEE EVENT REPORT 89-010-00 UNANTICIPATED CONTAINMENT PRESSURE TRIP SIGNAL POINT BEACH NUCLEAR PLANT, UNIT 2 Enclosed is Licensee Event Report 89-010-00 for Point Beach Nuclear Plant, Unit 2. This report is provided in accordance with 10 CFR 50.73 (a) (2) (iv) , "Any' event or condition that resulted in the manual or automatic actuation of any Engineered Safety Feature including the Reactor Protection System."

This report describes the generation of a containment high pressure signal during leak testing of containment penetrations i for Unit 2. Unit 2 was in refueling shutdown with the core unloaded. The Engineered Safety Features had,-therefore, been placed in a condition which-precluded safety injection pump _

operation.

A four-hour ENS telephone notification concerning this event was made on October 8,-1989. Due to licensee's oversight, the telephone notification was not followed by a 30-day written report. This failure to provide a written LER was brought to our attention on September 14, 1990, by the Point Beach NRC. Resident Inspectors.

00 gi hDk S

ilsubWim ofIlluvnshiDwqv Cmonotha

4 NitC Document Control Desk October 11, 1990 Page 2 If any further information is required, please contact us, t

very truly yours, N

h60 t '

C. W. Fay Vice President Nuclear Power Enclosure Copies to NRC Regional Administrator, Region-III NRC Resident Inspector 1