Forwards LER 90-020,Rev 1,updating Status of Corrective Actions & Including Other Minor Editorial Changes.Mod Request Initiated to Replace or Upgrade DG Voltage Regulator Due to Lack of Spare Parts Availability Not Required
ML20056H183
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/31/1993
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20056H184 List:
References
LIC-93-0230, LIC-93-230, NUDOCS 9309080341
Download: ML20056H183 (1)


LER-2090-020, Forwards LER 90-020,Rev 1,updating Status of Corrective Actions & Including Other Minor Editorial Changes.Mod Request Initiated to Replace or Upgrade DG Voltage Regulator Due to Lack of Spare Parts Availability Not Required
Event date:
Report date:
2852090020R00 - NRC Website

text

.

t. .

l 1

Omaha Public Power District P.O. Box 399 Hwy.75- North of Ft. Calhoun Fort Calhoun, NE 68023-0399  ;

402/636-2000 i

[

a August 31, 1993 i LIC-93-0230 U. S. Nuclear Regulatory Commission  ;

l Attn: Document Control Desk ,

1 Mail Station PI-137 ,

Washington, DC 20555

References:

1. Docket No. 50-285 '
2. LER 90-020 Revision 00 from OPPD (W. G. Gates) to NRC (Document Control Desk) dated October 15, 1990 (LIC-90-0804)

Gentlemen:

Subject:

Licensee Event Report 90-020 Revision 01 for the Fort Calhoun  ;

Station ~

l Please find attached Licensee Event Report (LER)90-020 Revision 01 dated l August 31, 1993. This revision updates the status of corrective actions and includes other minor editorial changes. Revisions to the Abstract and Text are denoted by vertical lines in the right margin. One specific change involves a corrective action which indicated that a modification request had been initiated to replace or upgrade diesel generator voltage regulators due to lack l of spare parts availability. A review of this modification request has since l concluded that such a modification is not required, in part because completion of modifications to increase reliability has reduced the need for a full I complement of spare parts. As a result, the associated corrective action has been deleted from the LER.

This report is being submitted pursuant to 10 CFR 50.73(a)(2)(v). If you should have any questions, please contact me.

Sincerely, AV N W W. G. Gates Vice President WGG/jrg Attachment c: LeBoeuf, Lamb, Leiby & MacRae J. L. Milhoan, NRC Regional Administrator, Region IV S. D. Bloom, NRC Project Manager R. P. Mullikin, NRC Senior Resident Inspector INP0 Records Center bI J