05000285/FIN-2013008-13
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Establish and Document Basis for Test Acceptance Criteria |
Description | The team identified a non-cited violation of 10 CFR Part 50, Appendix B, Criterion III, Design Control, associated with the licensees failure to assure that applicable design basis information, as defined in 10 CFR 50.2, for breaker testing was correctly translated into specifications, drawings, procedures, and instructions. Specifically, from July 2011, to the present the licensee failed to incorporate the basis for the acceptance limits of the digital low resistance ohmmeter values into specifications and procedures. Without a basis for the acceptance values the licensee cannot show that the breakers will perform satisfactorily in service, and incorrect acceptance values could allow high resistance connections to go unnoticed. This issue has been entered into the corrective action program as Condition Report CR 2013-04032. This performance deficiency is more than minor, and therefore a finding, because it is associated with the design control attribute of the Mitigating Systems Cornerstone, and affected the associated cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Using Inspection Manual Chapter 0609, Appendix G, Shutdown Operations Significance Determination Process, Attachment 1, Checklist 4, PWR Refueling Operation: RCS level > 23\' OR PWR Shutdown Operation with Time to Boil > 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> And Inventory in the Pressurizer, the team determined that because this finding did not increase the likelihood of a loss of reactor coolant system inventory; did not degrade the licensees ability to terminate a leak path or add reactor coolant system inventory; and did not degrade the licensees ability to recover decay heat removal, this finding did not require a Phase 2 or 3 analysis as stated in Checklist 4. Therefore, the finding is determined to have very low safety significance (Green). This finding has a cross-cutting aspect in the area of human performance associated with the work practices component because licensee personnel failed to follow procedures. Specifically, Fort Calhoun Station personnel failed to follow the requirements specified in Procedure PED-GEI-7, Specification of Post-Modification Test Criteria |
Site: | Fort Calhoun |
---|---|
Report | IR 05000285/2013008 Section 1R19 |
Date counted | Jun 30, 2013 (2013Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.19 |
Inspectors (proximate) | A Klett C Smith M Davis J Josey C Bickett G Warnick M Hay J Brand J Groom M Keefe R Latta W Schaup J Watkins B Hagar A Allen J Wingebach K Martin L Wilkins S Morrow R Deese F Ramirez |
Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |