IR 05000285/2013501
| ML14059A458 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 02/27/2014 |
| From: | Mark Haire Plant Support Branch-1 |
| To: | Cortopassi L Omaha Public Power District |
| M. Haire | |
| References | |
| IR-13-501 | |
| Download: ML14059A458 (2) | |
Text
February 27, 2014
SUBJECT:
FORT CALHOUN STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000285/2013501
Dear Mr. Cortopassi:
On December 31, 2013, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Fort Calhoun Station. This inspection began on January 1, 2013. Issuance of this letter closes NRC Inspection Report 05000285/2013501. The inspection results associated with the 2013-501 reports are documented in integrated Resident Inspector Reports 2013-002, 2013-003, 2013-004, and 2013-005.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Mark S. Haire, Chief
Plant Support Branch 1
Division of Reactor Safety
Docket: 50-285 License: DPR-40
Electronic Distribution for Fort Calhoun Station
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-4511 Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRS Director (Jeff.Clark@nrc.gov)
Acting DRS Deputy Director (Geoffrey.Miller@nrc.gov)
Senior Resident Inspector (John.Kirkland@nrc.gov)
Resident Inspector (Jacob.Wingebach@nrc.gov)
Branch Chief, DRP/F (Michael.Hay@nrc.gov)
Senior Project Engineer, DRP/F (Nick.Taylor@nrc.gov)
Project Engineer, DRP/F (Chris.Smith@nrc.gov)
FCS Administrative Assistant (Janise.Schwee@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
RIV Public Affairs Officer (Lara.Uselding@nrc.gov)
NRR Project Manager (Lynnea.Wilkins@nrc.gov)
NRR Project Manager (Joseph.Sebrosky@nrc.gov)
RIV Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource OEWEB Resource (Sue.Bogle@nrc.gov)
RIV/ETA: OEDO (Ernesto.Quinones@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
MC 0350 Panel Chairman (Anton.Vegel@nrc.gov)
MC 0350 Panel Vice Chairman (Louise.Lund@nrc.gov)
MC 0350 Panel Member (Michael.Balazik@nrc.gov)
MC 0350 Panel Member (Michael.Markley@nrc.gov)
S:\\DRS\\PSB 1\\MID-CYCLE & END-OF-CYCLE\\EOC 501 Letters\\EOC 2013501 Letters\\FCS2013501-EOC-LTR-pje.docx ML ADAMS: No x Yes x SUNSI Review Complete Reviewer Initials: MSH
x Publicly Available x Non-Sensitive
Non-publicly Available Sensitive C:PSB-1
MSHaire
/RA/
2/27/14
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax