05000285/FIN-2012004-02
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Fuel Move with SFP Ventilation Inoperable a Condition Prohibited by Technical Specification 2.8.3(4) |
| Description | The inspectors identified a non-cited violation of very low safety significance of Technical Specification 2.8.3(4), the limiting condition for refueling operations in the spent fuel pool. In December 2009, the licensee performed refueling operations with the Spent Fuel Pool Area Charcoal Filtration System, VA-66, declared inoperable. The failure to establish an operable Spent Fuel Pool Area Charcoal Filtration System, VA-66, before moving spent fuel was a performance deficiency and a violation of Technical Specification 2.8.3(4). The licensee entered this issue into the corrective action program as Condition Reports 2012-08521, 2012-0836 and Licensee Event Report 2012-008-0. The performance deficiency was determined to be more than minor because it adversely impacted the attribute of the Barrier Integrity Cornerstone objective to maintain radiological filtration functionality during operations in the spent fuel pool to protect the public from radionuclide releases caused by accidents or events. Using IMC 0609 Appendix A, Barrier Integrity Significance Determination Process, the inspectors determined this finding to be of very low safety significance (Green). Although fuel movements were contrary to the licensees technical specifications limiting condition for refueling operations, the finding represented a degradation of the radiological barrier function provided for the spent fuel pool fuel building. This finding has a cross-cutting aspect in the area of problem identification and resolution because the licensee did not effectively incorporate internal operating experience and lessons learned from previous VA-66 ventilation system failures during spent fuel pool refueling operations and plant safety. Specifically, the licensee failed to systematically collect, evaluate, and communicate to affected internal stakeholders in a timely manner relevant internal and external operating experience. |
| Site: | Fort Calhoun |
|---|---|
| Report | IR 05000285/2012004 Section 2RS6 |
| Date counted | Sep 30, 2012 (2012Q3) |
| Type: | NCV: Green |
| cornerstone | Barrier Integrity |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71124.06 |
| Inspectors (proximate) | K Clayton R Deese J Kirkland F Ramirez A Klett B Tharakan L Carson A Rosebrook C Young C Alldredge N Greene J Wingebach |
| CCA | P.5, Operating Experience |
| INPO aspect | CL.1 |
| ' | |
Finding - Fort Calhoun - IR 05000285/2012004 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Fort Calhoun) @ 2012Q3
Self-Identified List (Fort Calhoun)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||