05000285/FIN-2013405-04

From kanterella
Jump to navigation Jump to search
04
Site: Fort Calhoun Omaha Public Power District icon.png
Report IR 05000285/2013405 Section 3S01
Date counted Mar 31, 2013 (2013Q1)
Type: NCV: Green
cornerstone Physical Protection
Identified by: NRC identified
Inspection Procedure: IP 71130.01
Violation of: 10 CFR 73, PHYSICAL PROTECTION OF PLANTS AND MATERIALS
CCA H.14, Conservative Bias
INPO aspect DM.2
'