| Q | CCA | Title |
---|
05000285/FIN-2011406-02 | 2012Q1 | P.3 | Security |
05000285/FIN-2011406-01 | 2012Q1 | P.2 | Security |
05000285/FIN-2011014-01 | 2012Q1 | H.7 | Failure to Ensure That the 480 Vac Electrical Power Distribution System Design Requirements Were Implemented and Maintained |
05000285/FIN-2011014-03 | 2012Q1 | | Cause of Breaker 1B3A Trip Not Identified |
05000285/FIN-2011014-02 | 2012Q1 | | Failure to Perform Adequate 10 CFR 50.59 Review |
05000285/FIN-2012002-04 | 2012Q1 | H.5 | Failure to Promptly Recognize and Communicate Siren System Failures |
05000285/FIN-2012002-05 | 2012Q1 | H.2 | Failure To Comply With An Emergency Plan Requirement To Notify Offsite Authorities Within 15 Minutes Of An Emergency |
05000285/FIN-2012002-03 | 2012Q1 | P.2 | Failure to Meet Design Basis Requirements for Design Basis Flood Event |
05000285/FIN-2012002-02 | 2012Q1 | P.2 | Failure to Classify Intake Structure Sluice Gates as Safety Class III |
05000285/FIN-2012002-01 | 2012Q1 | P.2 | Inadequate Procedures to Mitigate a Design Basis Flood |
05000285/FIN-2012009-02 | 2012Q2 | | Impact of Wetting on Safety-Related Cables |
05000285/FIN-2012009-03 | 2012Q2 | | Assess Corrective Actions and Determine Structural Effect of Water Intrusion and Boric Acid on Interior Containment Walls |
05000285/FIN-2012301-03 | 2012Q2 | H.5 | Failure to Comply with Technical Specification 2.3(1)(i) for Safety Injection Tank Operability |
05000285/FIN-2012301-05 | 2012Q2 | | Failure to Correctly Translate the Design Basis for the Containment Spray System |
05000285/FIN-2012007-01 | 2012Q2 | | Failure to Provide Adequate Post-Fire Safe Shutdown Actions in the Switchgear Rooms |
05000285/FIN-2012007-02 | 2012Q2 | H.13 | Failure to Maintain Command and Control Function During Fire Fighting Activities in the Protected Area |
05000285/FIN-2012009-01 | 2012Q2 | | Evaluation of Future Discharge Tunnel Inspection Plans |
05000285/FIN-2012007-04 | 2012Q2 | H.13 | Failure to Provide Adequate Alternate Shutdown Capability |
05000285/FIN-2012007-05 | 2012Q2 | H.13 | Untimely Corrective Actions Related to Revising a Post- Fire Safe Shutdown Procedure |
05000285/FIN-2012301-02 | 2012Q2 | | Failure to Periodically Update the Final Safety Analysis Report for the Emergency Diesel Generators |
05000285/FIN-2012301-01 | 2012Q2 | P.1 | Seven Examples of Inadequate Procedures for the Barrier Integrity Cornerstone |
05000285/FIN-2012301-04 | 2012Q2 | P.1 | Five Examples of Inadequate Procedures for the Initiating Events Cornerstone |
05000285/FIN-2012301-06 | 2012Q2 | P.1 | Four Examples of Inadequate Procedures for the Barrier Integrity Cornerstone |
05000285/FIN-2012003-01 | 2012Q2 | H.2 | Failure to Ensure Personnel Meet Minimum Educational Requirements |
05000285/FIN-2012007-03 | 2012Q2 | | Alternate Shutdown Procedure Does Not Account for Single Worst Case Spurious Actuations |
05000285/FIN-2012004-01 | 2012Q3 | | Failure to report an event to the NRC within 60 days for an operation prohibited by Technical Specifications |
05000285/FIN-2012005-01 | 2012Q3 | | Failure to Update the Safety Analysis Report Solid Waste |
05000285/FIN-2012004-02 | 2012Q3 | P.5 | Fuel Move with SFP Ventilation Inoperable a Condition Prohibited by Technical Specification 2.8.3(4) |
05000285/FIN-2012004-03 | 2012Q3 | H.7 | Failure to Establish and Implement Adequate Procedures for Meteorological Monitoring and the Off-Site Dose Calculation Manual |
05000285/FIN-2012004-04 | 2012Q3 | H.7 | Failure to Ensure Breaker Coordination of 480 VAC Electrical Power Distribution System Was Maintained |
05000285/FIN-2012005-02 | 2012Q3 | P.3 | Untimely Corrective Actions for 480 VAC Breaker Issues |
05000285/FIN-2012403-02 | 2012Q4 | H.5 | Security |
05000285/FIN-2012403-01 | 2012Q4 | H.14 | Security |
05000285/FIN-2012012-05 | 2012Q4 | | Failure to Perform Siren Maintenance as required by the Alert and Notification System Design Report |
05000285/FIN-2012012-04 | 2012Q4 | H.14 | Failure to Adequately Implement the Maintenance Rule Program |
05000285/FIN-2012012-03 | 2012Q4 | P.3 | Failure to Properly Manage the Functionality of the River Sluice Gates |
05000285/FIN-2012012-01 | 2012Q4 | | Hot Work Procedures Allowed a Roving Fire Watch |
05000285/FIN-2012011-05 | 2012Q4 | H.12 | Failure to Properly Scope All the Pertinent External Flood Protection Features into the Walkdown List in Accordance with Industry Guidance NEI 12-07 |
05000285/FIN-2012011-04 | 2012Q4 | H.7 | Inadequate Design Basis Documentation |
05000285/FIN-2012011-03 | 2012Q4 | P.2 | Failure to Ensure that Adequate Equipment was Available to Measure River Level Locally to be Able to Comply with an Abnormal Operating Procedure |
05000285/FIN-2012011-02 | 2012Q4 | P.5 | Failure to Follow Radiation Work Permit Requirements |
05000285/FIN-2012011-01 | 2012Q4 | H.14 | Inadequate operability determination for containment internal structures |