| Q | CCA | Title |
---|
05000285/FIN-2011005-01 | 2011Q4 | H.12 | Failure to Follow Procedure Results in a Loss of Reactor Coolant |
05000285/FIN-2011006-06 | 2011Q4 | P.2 | Failure to Implement an Adequate Trending Program |
05000285/FIN-2011006-05 | 2011Q4 | H.13 | Failure to Establish Adequate Measures to Maintain Vendor Manual Design Control Information |
05000285/FIN-2011006-04 | 2011Q4 | H.8 | Failure to Perform Extent of Condition Evaluation |
05000285/FIN-2011006-03 | 2011Q4 | H.6 | Failure to Correct Degraded Electrical Insulation on the Component Cooling Water System Motors |
05000285/FIN-2011006-02 | 2011Q4 | H.14 | Inadequate Corrective Actions to Ensure the Reliability of the RAW Water Pump Power Cables |
05000285/FIN-2011006-01 | 2011Q4 | H.13 | Failure to Correct Identified Corrective Action Program Deficiencies |
05000285/FIN-2011005-04 | 2011Q4 | | Inadequate Licensee Procedure for Making Protective Action Recommendations |
05000285/FIN-2011005-03 | 2011Q4 | H.2 | Failure to Follow Radiation Work Permit Instructions |
05000285/FIN-2011005-02 | 2011Q4 | H.12 | Inadequate Performance Monitoring Test for Component Cooling Water Heat Exchangers |
05000285/FIN-2011006-07 | 2011Q4 | P.4 | Failure to Follow Housekeeping Program Requirements |
05000285/FIN-2011406-02 | 2012Q1 | P.3 | Security |
05000285/FIN-2012002-04 | 2012Q1 | H.5 | Failure to Promptly Recognize and Communicate Siren System Failures |
05000285/FIN-2012002-05 | 2012Q1 | H.2 | Failure To Comply With An Emergency Plan Requirement To Notify Offsite Authorities Within 15 Minutes Of An Emergency |
05000285/FIN-2012002-01 | 2012Q1 | P.2 | Inadequate Procedures to Mitigate a Design Basis Flood |
05000285/FIN-2012002-02 | 2012Q1 | P.2 | Failure to Classify Intake Structure Sluice Gates as Safety Class III |
05000285/FIN-2012002-03 | 2012Q1 | P.2 | Failure to Meet Design Basis Requirements for Design Basis Flood Event |
05000285/FIN-2011014-02 | 2012Q1 | | Failure to Perform Adequate 10 CFR 50.59 Review |
05000285/FIN-2011014-03 | 2012Q1 | | Cause of Breaker 1B3A Trip Not Identified |
05000285/FIN-2011014-01 | 2012Q1 | H.7 | Failure to Ensure That the 480 Vac Electrical Power Distribution System Design Requirements Were Implemented and Maintained |
05000285/FIN-2011406-01 | 2012Q1 | P.2 | Security |
05000285/FIN-2012301-03 | 2012Q2 | H.5 | Failure to Comply with Technical Specification 2.3(1)(i) for Safety Injection Tank Operability |
05000285/FIN-2012009-03 | 2012Q2 | | Assess Corrective Actions and Determine Structural Effect of Water Intrusion and Boric Acid on Interior Containment Walls |
05000285/FIN-2012009-01 | 2012Q2 | | Evaluation of Future Discharge Tunnel Inspection Plans |
05000285/FIN-2012007-02 | 2012Q2 | H.13 | Failure to Maintain Command and Control Function During Fire Fighting Activities in the Protected Area |
05000285/FIN-2012007-01 | 2012Q2 | | Failure to Provide Adequate Post-Fire Safe Shutdown Actions in the Switchgear Rooms |
05000285/FIN-2012301-02 | 2012Q2 | | Failure to Periodically Update the Final Safety Analysis Report for the Emergency Diesel Generators |
05000285/FIN-2012301-05 | 2012Q2 | | Failure to Correctly Translate the Design Basis for the Containment Spray System |
05000285/FIN-2012301-06 | 2012Q2 | P.1 | Four Examples of Inadequate Procedures for the Barrier Integrity Cornerstone |
05000285/FIN-2012009-02 | 2012Q2 | | Impact of Wetting on Safety-Related Cables |
05000285/FIN-2012007-05 | 2012Q2 | H.13 | Untimely Corrective Actions Related to Revising a Post- Fire Safe Shutdown Procedure |
05000285/FIN-2012007-04 | 2012Q2 | H.13 | Failure to Provide Adequate Alternate Shutdown Capability |
05000285/FIN-2012007-03 | 2012Q2 | | Alternate Shutdown Procedure Does Not Account for Single Worst Case Spurious Actuations |
05000285/FIN-2012003-01 | 2012Q2 | H.2 | Failure to Ensure Personnel Meet Minimum Educational Requirements |
05000285/FIN-2012301-01 | 2012Q2 | P.1 | Seven Examples of Inadequate Procedures for the Barrier Integrity Cornerstone |
05000285/FIN-2012301-04 | 2012Q2 | P.1 | Five Examples of Inadequate Procedures for the Initiating Events Cornerstone |
05000285/FIN-2012004-04 | 2012Q3 | H.7 | Failure to Ensure Breaker Coordination of 480 VAC Electrical Power Distribution System Was Maintained |
05000285/FIN-2012005-01 | 2012Q3 | | Failure to Update the Safety Analysis Report Solid Waste |
05000285/FIN-2012004-01 | 2012Q3 | | Failure to report an event to the NRC within 60 days for an operation prohibited by Technical Specifications |
05000285/FIN-2012005-02 | 2012Q3 | P.3 | Untimely Corrective Actions for 480 VAC Breaker Issues |
05000285/FIN-2012004-03 | 2012Q3 | H.7 | Failure to Establish and Implement Adequate Procedures for Meteorological Monitoring and the Off-Site Dose Calculation Manual |
05000285/FIN-2012004-02 | 2012Q3 | P.5 | Fuel Move with SFP Ventilation Inoperable a Condition Prohibited by Technical Specification 2.8.3(4) |