05000259/FIN-2010006-06
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Inadequate Maintenance Procedure for Siemens Horizontal Vacuum Circuit Breakers Circuit Breakers |
Description | The inspectors identified a non-cited violation of Technical Specification (TS) 5.4.1 for the licensees failure to have adequate preventative maintenance procedures for Siemens Horizontal Vacuum Circuit Breakers. Plant procedure EPI-0-000-BKR015, 4KV Wyle/Siemens Horizontal Vacuum Circuit Breaker (Type-3AF) and Compartment Maintenance, Revision 28, did not provide specific guidance for checking the tightness of the closing spring charging motor mounting bolts. As a result, on June 15, 2010 while the 3C RHR pump was in service for suppression pool cooling, the charging motor in the pump breaker cubicle became detached from its mount. The charging spring failed to recharge and the pump would not have restarted if needed following a trip of the circuit breaker. The licensee reattached the charging motor and restored the 3C RHR pump to service. The licensee also revised procedure EPI-0-000-BKR015 to include instructions for ensuring the charging motor was securely fastened to the circuit breaker. This finding was entered into the licensees corrective action program as PER 234443. The inspectors determined that the failure to have an adequate maintenance procedure for circuit breaker maintenance was a performance deficiency. This performance deficiency was more than minor because it was associated with the Mitigating Systems Cornerstone attribute of Procedure Quality and adversely affected the cornerstone objective in that the PM procedure for the breaker did not assure the 3C RHR pump could perform its intended safety functions. The inspectors determined that the finding was of very low safety significance because it did not result in inoperability of a safety function for greater than the allowed technical specification outage time and was not potentially risk-significant due to external events. The inspectors determined that this finding directly involved the crosscutting area of Human Performance, component of Resources and aspect of Complete Documentation because the licensee did not maintain adequate plant procedures for equipment maintenance. Specifically, procedure EPI-0-000-BKR015, Revision 28 did not contain guidance for checking the charging motor bolt tightness resulting in the 3C RHR pump charging motor becoming detached and adversely affecting train operability. |
Site: | Browns Ferry |
---|---|
Report | IR 05000259/2010006 Section 4OA2 |
Date counted | Sep 30, 2010 (2010Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | G Hopper A Sabisch P Higgins M Barillas |
CCA | H.7, Documentation |
INPO aspect | WP.3 |
' | |
Finding - Browns Ferry - IR 05000259/2010006 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Browns Ferry) @ 2010Q3
Self-Identified List (Browns Ferry)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||