Finding | |
---|---|
Title | Failure to Effectively Maintain Performance of the A3 EECW Pump as Required by 10 CFR 50.65(a)(2) |
Description | The inspectors identified a noncited violation of 10 CFR 50.65(a)(2) for failure to demonstrate that the performance of the A3 Emergency Equipment Cooling Water (EECW) pump was effectively controlled by preventive maintenance (PM) such that the pump remained capable of performing its intended function. Also due to inadequate evaluations performed after the A3 EECW pump exceeded its Maintenance Rule a(2) performance criteria, goal setting and monitoring were not established as required by paragraph a(1) of the Maintenance Rule. The licensee subsequently declared the EECW system in (a)(1) status and was in the process of developing the required goals and monitoring plan. This issue was entered into the licensees corrective action program as problem evaluation report 223404. The finding was determined to be of greater than minor significance because it was associated with the Equipment Performance attribute of the Mitigating Systems Cornerstone, and adversely affected the cornerstone objective of ensuring availability and reliability of systems designed to respond to initiating events to prevent undesirable consequences. More specifically, the licensee failed to demonstrate effective control of EECW system availability through appropriate PM. According to NRC Inspection Manual Chapter 0609.04, Phase I - Initial Screening and Characterization of Findings, this finding was determined to be of very low safety significance because it did not lead to an actual loss of a system safety function orscreen as potentially risk significant due to a seismic, flooding, or severe weather initiating event. The cause of this finding was directly related to the cross cutting aspect of Thorough Evaluation of Identified Problems in the Corrective Action Program component of the Problem Identification and Resolution area, because the licensee did not adequately evaluate the causes of the A3 EECW pump unavailability and thereby failed to correctly determine the impact on the 10 CFR 50.65(a)(2) unavailability performance criteria P.1(c) |
Site: | Browns Ferry ![]() |
---|---|
Report | IR 05000259/2010002 Section 1R12 |
Date counted | Mar 31, 2010 (2010Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.12 |
Inspectors (proximate) | C Stancil T Ross H Gepford E Guthrie R Baldwin K Korth M Coursey |
CCA | P.2, Evaluation |
INPO aspect | PI.2 |
' | |