Finding | |
---|---|
Title | |
Description | The inspectors identified a noncited violation of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, for failure to promptly recognize, and then correct in a timely manner, non-conforming conditions involving the in-service testing (IST) requirements of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance (OM) of Nuclear Power Plants for the Equipment Cooling Water (EECW) system identified in June 2009. These nonconforming conditions involved the use of flow instrumentation without the proper accuracy, and failure to use the pre-service pump curve when establishing additional IST baseline reference values. The licensee revised the timeliness of their corrective action plans and decided to track this issue as a nonconforming condition. This issue was entered into the licensees corrective action program as PER 225844. The finding was determined to be of greater than minor significance because if left uncorrected it could become a more significant safety concern. In-service testing of the EECW system in conformance with the ASME OM Code provides assurance that degraded pump performance would be promptly detected and corrected. Failing to recognize and resolve these and other IST program deficiencies could lead to untimely detection of EECW pump degradation. According to Inspection Manual Chapter 0609.04, Phase I - Initial Screening and Characterization of Findings, this finding was determined to be of very low safety significance because it did not lead to an actual loss of a system safety function or screen as potentially risk significant due to a seismic, flooding, or severe weather initiating event. The cause of this finding was directly related to the cross-cutting aspect of Appropriate and Timely Corrective Actions in the Corrective Action Program component of the Problem Identification and Resolution area because the licensee failed to take appropriate corrective actions to restore full compliance with the ASME OM Code requirements in a timely manner P.1(d) |
Site: | Browns Ferry |
---|---|
Report | IR 05000259/2010002 Section 4OA2 |
Date counted | Mar 31, 2010 (2010Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | C Stancil T Ross H Gepford E Guthrie R Baldwin K Korth M Coursey |
CCA | P.3, Resolution |
INPO aspect | PI.3 |
' | |