Finding | |
---|---|
Title | |
Description | The inspectors identified a finding for the licensees failure to implement the applicable provisions of the Tennessee Valley Authority (TVA) Preventative Maintenance (PM) Program to replace the coil in the solenoid valve controlling the opening of the Unit 3 Condensate Demineralizer bypass valve on the specified PM frequency. Failure of this coil was identified as a contributing cause in Root Cause Analysis for PER 200203, Unit 3 Manual Scram Due to Lowering Reactor Water Level. This finding was entered into the licensees corrective action program as PER 245390. The inspectors determined that the licensees failure to implement the TVA PM program was a performance deficiency. The performance deficiency was determined to be more than minor because it was associated with the Initiating Events cornerstone attribute of Equipment Performance, and adversely affected the cornerstone objective to limit the likelihood of those events that upset plant stability and challenge critical safety functions during at power operations, since failure to implement the provisions of the PM program increased the likelihood of a component failure which contributed to a plant transient. Specifically the failure of the solenoid coil contributed to a reactor trip. The inspectors determined that the finding was of very low safety significance because it did not contribute to both the likelihood of a reactor trip and the likelihood that mitigating equipment or functions were not available. The inspectors determined that this finding directly involved the cross-cutting area of Human Performance, component of Work Practices and aspect of Procedural Compliance because licensee personnel failed to follow the guidance contained in the Preventive Maintenance program resulting in a plant transient. |
Site: | Browns Ferry |
---|---|
Report | IR 05000259/2010006 Section 4OA2 |
Date counted | Sep 30, 2010 (2010Q3) |
Type: | Finding: Green |
cornerstone | Initiating Events |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | G Hopper A Sabisch P Higgins M Barillas |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |
Finding - Browns Ferry - IR 05000259/2010006 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Browns Ferry) @ 2010Q3