Issue date | Title | Topic | |
---|---|---|---|
ML20217H623 | 18 October 1999 | Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs | |
ML20217J433 | 15 October 1999 | Forwards Insp Rept 50-461/99-19 on 990913-17.One Violation Re Individual Failure to Follow Radiation Protection Procedures When Accessing High Radiation Area Noted & Being Treated as Noncited Violation | High Radiation Area |
U-603280, Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p) | 12 October 1999 | Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p) | |
ML20217C087 | 11 October 1999 | Forwards Proprietary Attachment Inadvertently Omitted from Encl 2 to Submitting Responses to NRC RAI Re License Transfer Application for Plant.Proprietary Encl Withheld | |
U-603276, Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included | 8 October 1999 | Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included | Hot Short Safe Shutdown Unanalyzed Condition Reactor Vessel Water Level Loop seal High Radiation Area Half scram Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Tornado Missile Post Accident Monitoring Internal Flooding Enforcement Discretion Coatings Temporary Modification Emergency Lighting Incorporated by reference Tornado Generated Missile Foreign Material Exclusion Feedwater Controller Failure Operability Determination Rod Drop Event Fuel cladding Pressure Boundary Leakage Fire Protection Program Scaffolding Unidentified leakage Unidentified leak Exit Sign Affidavit |
U-603279, Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld | 7 October 1999 | Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld | |
U-603275, Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station | 7 October 1999 | Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station | |
ML20217A988 | 1 October 1999 | Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities | |
ML20217A736 | 1 October 1999 | Forwards Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Identified,One Re Failure to Place Control Switch in Proper Position to Identify Piece of out-of-svc Equipment & Being Treated as NCVs | |
ML20217J125 | 30 September 1999 | Refers to Investigation 3-1997-040 Conducted from 971028- 980921 & Forwards Nov.Investigations Determined That During Jan 1997,supervisor Qv Dept Discriminated Against Qv Inspector in Retaliation for Inspector Contacts with NRC | |
ML20217J142 | 30 September 1999 | Refers to Investigation 3-97-040 Conducted from 971028- 980921 & Forwards Nov.Investigation Concluded That Recipient Engaged in Deliberate Misconduct in That Recipient Discriminated Againt Qv Inspector for Having Contacted NRC | |
ML20212G675 | 22 September 1999 | Forwards Comment Submitted to NRC by Environ Law & Policy Ctr Re Proposed License Transfer for Clinton Power Station | |
U-603272, Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl | 22 September 1999 | Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl | |
U-603225, Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl | 20 September 1999 | Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl | |
ML20212G698 | 20 September 1999 | Requests That NRC Reject Proposed License Transfer for Clinton Power Station & That NRC State That Public Interest in Safe Nuclear Power Industry Will Not Be Subordinated to Interest in Maximizing Profit by Limiting Liability | |
ML20217H342 | 17 September 1999 | Forwards Request for Addl Info Re Licensee 990723 Application for License Transfer & Conforming Administrative License Amend.Response Requested within 20 Days of Receipt of Ltr | |
05000461/LER-1996-010, Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events | 13 September 1999 | Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events | |
05000461/LER-1999-011, Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments | 10 September 1999 | Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments | |
U-603269, Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed | 10 September 1999 | Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed | |
ML20211Q267 | 8 September 1999 | Informs That NRC Tentatively re-scheduled Initial Licensing Exams for License Operator License Applicants During Weeks of June 5 & 12,2000.Validation of Exams Will Occur at Station During Weeks of May 15,2000 | |
U-603229, Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl | 25 August 1999 | Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl | Probabilistic Risk Assessment Anchor Darling |
U-603243, Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.7 | 23 August 1999 | Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.7 | |
ML20211D220 | 23 August 1999 | Confirms 990817 Telcon with J Neuschwanger & D Mcneil Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Plant | |
U-603258, Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage | 23 August 1999 | Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage | |
ML20211B087 | 20 August 1999 | Responds to J Hopkins Inquiry Re Application for Order Consenting to License Transfer & Approving Conforming Administrative License Amend Filed by Ilpr & Amergen Energy Co on 990723 | |
U-603259, Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired | 19 August 1999 | Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired | |
ML20211A893 | 19 August 1999 | Forwards Insp Rept 50-461/99-13 on 990611-0728.Two Violations Noted & Being Treated as Ncvs.Violation Re Three Examples Where Licensee Procedural Requirements for Minor Maint Work Were Not Followed | |
U-603253, Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 990813 | 16 August 1999 | Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 990813 | |
ML20210U377 | 12 August 1999 | Forwards Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amend & Opportunity for Hearing Re Amend Request for Approval of Clinton Power Station License NPF-62 Transfer to Amergen | |
U-603250, Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 990729 | 10 August 1999 | Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 990729 | |
U-603249, Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 990809 | 10 August 1999 | Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 990809 | |
ML20210N296 | 9 August 1999 | Forwards Form of Nuclear Decommissioning Master Trust Agreement,Per CPS Application for License Transfer & Conforming Administrative License Amend | |
U-603248, Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR55 | 6 August 1999 | Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR55 | |
U-603236, Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS | 2 August 1999 | Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS | |
ML20210J054 | 30 July 1999 | Forwards Three Original Signature Pages of Gr Rainey for Application for License Transfer & Conforming Administrative License Amend, for NRC Files | |
U-603178, Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS | 29 July 1999 | Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS | High Radiation Area Non-Destructive Examination Scaffolding |
U-603237, Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 000131 | 28 July 1999 | Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 000131 | |
U-603240, Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.71 | 27 July 1999 | Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.71 | Fitness for Duty |
U-603235, Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.790 | 23 July 1999 | Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.790 | |
ML20210A440 | 16 July 1999 | Forwards Insp Rept 50-461/99-10 on 990422-0610.Four Violations Being Treated as Noncited Violations | |
ML20209G767 | 12 July 1999 | Ack Receipt of Encl FEMA Correspondence ,which Transmitted FEMA Evaluation Rept for 981118 Biennial EP Exercise at Clinton Power Station.No Deficiencies Were Observed | |
ML20209D569 | 7 July 1999 | Forwards Insp Rept 50-461/99-12 on 990607-11.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Observations of Work in Progress & Interviews with Personnel | |
U-603231, Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date | 7 July 1999 | Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date | |
U-603214, Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events | 6 July 1999 | Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events | |
ML20196J965 | 2 July 1999 | Confirms Discussion Between Members of Staffs to Conduct Meeting on 990714 at Clinton Power Station to Discuss Results of Restart Insp & Licensee Progress in Addressing Remaining Long Term C/A Actions to Sustain Improvements | |
ML20196J713 | 30 June 1999 | Informs of Closure of Response to Requests for Addl Info to GL 92-01,Rev 1,Supplement 1, Reactor Vessel Structural Integrity, for Clinton Power Station Unit 1 | |
U-603218, Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant | 28 June 1999 | Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant | |
U-603212, Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys | 24 June 1999 | Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys | |
U-603227, Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology | 24 June 1999 | Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology | |
ML20196A347 | 16 June 1999 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-461/99-11 Issued on 990430.Corrective Actions Will Be Examined During Future Inspections |