ML20283A376

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation - Revisions O and 1 to the Physical Security Plan
ML20283A376
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/30/2020
From: Bates A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML20283A376 (3)


Text

Al Bates Manager, Regulatory Affairs An EDISON INTERNA110NALf!; Company

)

SAFEGUARDS INFORMATION

, , _ '

  • _ , ** ;,'.:,~-' ~-- -----'

,-: -~T- ,: ,---,- ---,

U. S .. NLJcl~ar Regulatory Comm.i$sion *

.A TIN:, Docum ent Control De$k Washington, DC 20555-0001

Subject:

Docket Nos. 50~206, 50-361, 50-362 and 72-41 Revisions O and 1 to the Physical Security Plan San Onofre Nuclear Generating Station, Units 2 and 3, and Independent Spent Fuel Storage Installation

Reference:

Letter from Marlayna G. Vaaler (NRC) to Thomas J. Palmisano (SCE) dated April 23, 2018;

Subject:

San Onofre Nuclear Generating Station, Units 1, 2, and 3 - Issuance of Amendments to Change the Physical Security Plan to Reflect an ISFSI-Only Configuration (ADAMS Accession No. M.L 17311A364)

Dear Sir or Madam:

- Southern. California *Edison (SCE) has made changes to the Physical Securi ty Plan (PSP), for the San Onofre Nuclear Generating Station (SONGS) that SCE has*

determined do not decrease the safeguards effectiveness of this plan.

On April 23, 2018, the NRC approved ah ISFSI-Only Physical Security Plan, Training and Qualification Plan and Safeguards Conttrigency Plan (Security Plan) that had been submitted in accordance with 10 CFR 50.90. On August 10, 2020, SCE implemented

'Revision O of the ISFSI-Only Security Plan. This document was a comple te replacement to the Physical Security Plan, Training and Qualification Plan and*

Safeguards Contingency Plan that had previously been in place and reflect

. . ed the ISFSI-Only status of the station achieved on that date. Also, on August 10, 2020, SCE implemented Revision 1 to the ISFSI-Only Security Plan.

_soo l SAFEGUARDS INFORMATION A)il{S-5 2~

NOTE: ENCLOSURES 1, 2, 3, AND 4 CONTA IN "SAFEGUARDS INFOR MATION". THIS f'J/<.../L_

INFOR MATIO N MUST BE PROTECTED ACCORDINGLY. UPON SEPER ATION FROM THESE ENCLOSURES, THIS LETTER IS "DECONTROLLED."

µ,vfS S

SAFEG UARDS INFORMATION SCE has determined that the changes in Revision 1 to the Security Plan do not decrease the safeguards effectiveness of the PSP. In accorda nce with 10CFR

, . 50:54(p)(2), a copy of the 90.54(P) evatuatiori of these .changes is provided as. * .

.~. ~ l::ntlbs'are 1-:tor\lour ir1f6tmation>Enclosure2*coritaihs-afr'i'arl<ed=-up\1~rsior{oftfle- -

. ** rev1s.ed plan pages., Enclosure 3 contains* a clean version *of the revised plari pages .

a

. *. . Enclosure 4 co.ntalns complete copy ofthe new Revisiart:1 of the SONGS Physical

Th~re are no new regulatory commitments made*by ttiislette r or its enclosures:

Note thatthe enclosures to this letter contain safeguards information. This 'letter may ..

be decontrolled llpon separation from its enclosures. *

  • If you have any questions regarding this matter, please contact me at (949) 368~9645.

Enclosures (SGI)

1. Screening Criteria - Security Licensing Documents
2. Physical Security Plan Changed Pages, Line-in/Line-out Version
3. Physical Security Plan Changed Pages, Clean Version
4. SONGS Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 1 cc: R. Kellar, NRC Region IV, Branch Chief, Plant Support Branch SAFEG UARDS INFORMATION NOTE: ENCLOSURES 1, 2, 3, AND 4 CONTAIN "SAFEGUARDS INFORMATION". THIS, INFORMATION MUST BE PROTECTED ACCORDINGLY. UPON SEPERATION FROM THESE ENCLOSURES, THIS LEITER IS "DECONTROLLED."

SAFEGUARDS INFORMATION

, .10 CFR 50.54(p} REPORT .

San Onofre Nuclear Generation Station (SONGS)

[ISFSI Only] Physical Security Plan, Training and

-~-- ~ -Qualification-Plan-and-Safe-guard-e*ontingency-Plan ----- -

Revision 1, August 2020 This report contains a description of affected Physical Security Plan (PSP)

. changes in the following enclosures: *

  • Enclosure 1: SCREENING CRITERIA- SECURITY LICENSING DOCUMENTS Enclosure 2: PSP Changed Pages, Line-in/Line-out Version Enclosure 3: PSP Changed Pages, Clean Version Enclosure 4 contains a completed copy of the SONGS [ISFSI Only] Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 1 WARNING Violation of 10 CFR 73.21, Safeguards Information determination made by:

"Requirements of the Protection of Safeguards lnformation,"is subject to civil Name/Title: David Piper/ Technical Specialist and criminal penalties. Organization: SONGS Security Basis: 10 CFR 73.21 Date of Determination: 8/10/2020 SAFEGUARDS INFORMATION NOTE: ENCLOSURES 1, 2, 3, AND 4 CONTAIN "SAFEGUARDS INFORMATION". THIS INFORMATION MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION FROM

_THESE ENCLOSURES, THIS PAGE IS "DECONTROL,LED."