CY-97-060, Informs That Util Taking Listed Actions to Meet EP Position Number 3 Recommendation Re on-shift Dose Assessment

From kanterella
(Redirected from ML20141C644)
Jump to navigation Jump to search
Informs That Util Taking Listed Actions to Meet EP Position Number 3 Recommendation Re on-shift Dose Assessment
ML20141C644
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/19/1997
From: Feigenbaum T
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CY-97-060, CY-97-60, NUDOCS 9706250365
Download: ML20141C644 (2)


Text

. .r .

  • CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT l 362 INJUN HOLLOW ROAD e EAST HAMPToN. CT 06424-3090 l l June 19,1997 Docket No. 50-213 )

CY-97-060 '

U. S. Nuclear Regulatory Comrnission ATTN: Document Control Desk Washington, DC 20555 Haddam Neck Plant On-Shift Dose Assessment Caoability The NRC's Emergency Preparedness Position (EPPOS) No. 3 regarding On-shift Dose Assessment, clarified the Staff's position regarding the need for control room personnel to perform dose assessments. Specifically, EPPOS No. 3 states that "... licensees must retain the capability to perform dose assessment using effluent release information and real-time meteorology at all times."

Accordingly, this letter is to inform you that the Connecticut Yankee Atomic Fower Company, is taking the following actions to meet the EPPOS No. 3 recommendation.

The Haddam Neck Plant (HNP) Emergency Plan is being revised to include on-shift staff personnel to perform dose assessments. The following commitments are provided in this letter. Other statements within this letter are provided for information only.

CY-97-060-1 A new Emergency Plan implementing Procedure (EPIP) will be developed by August 31,1997 to provide the capability for on-shift personnel to perform dose assessments using effluent release information and real-time meteorology. ,

CY-97-060-2 The on-shift Shift Managers Staff Assistant will be trained to h perform real-time dose assessments using the new EPIP. l Upon implementation of the HNP Defueled Emergency Plan submittal to the NRC on May 30, 1997 W and corresponding EPIPs the Shift Manager will provide dose assessments and, when the Defueled Emergency Response I Organization (DERO) is activated, dose assessments will be performed by the DERO staff.

W T. C. Feigenbaum letter to tne U. S. Nuclear Regulatory Commission, "Haddam Neck l Plant Emergency Plan And Request For Exemption From 10CFR50.54(q) for Offsite l Response," dated May 30,1997.

ica m v a-ei kkk,kh k 9706250365 970619 PDR ADOCK 050002 3 r

l . . .

U. S. Nuclear Regulatory Commission CY-97-060/Page 2 If you have any questions, please contact Mr. G. P. van Noordennen at (860)267-3938.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY 1

l hV

'Ted C. Feigenbadfn f m j

Executive Vice President and i Chief Nuclear Officer l