ULNRC-03508, Informs of Implementation of Amendment 118 Re Updated Charcoal Test Methodology,Effective 961204

From kanterella
(Redirected from ML20132C078)
Jump to navigation Jump to search
Informs of Implementation of Amendment 118 Re Updated Charcoal Test Methodology,Effective 961204
ML20132C078
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/12/1996
From: Passwater A
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-03508, ULNRC-3508, NUDOCS 9612180110
Download: ML20132C078 (2)


Text

~ ^~~

. 1901 Chouwau Avenue

. . Post Offica Bax 149 St Laws. Masoun 63IEG 314 621-3222 g December 12,1996 m

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station PI-137 Washington, DC 20555 Gentlemen: ULNRC-03 5 08 DOCKET NUMBER 50-483 CALLAWAY PLANT AMENDMENT NUMBER 118 This is to inform the Commission of the implementation of Amendment 118 to Callaway Facility Operating License No. NPF-30. Amendment 118 updated the charcoal test methodology for the emergency exhaust system. The changes have been issued to all controlled Technical Specification holders and became effective on December 4,1996.

Very tmly yours, hct4M A. C. Passwater Manager, Licensing & Fuels DS/jdg 1700G8 wwww P

s

l cc: M. H. Fletcher i Professional Nuclear Consulting, Inc. l 19041 Raines Drive Derwood, MD 20855-2432 L. Joe Callan Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 <

Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office  ;

U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 i Kristine M. Thomas (2)

Office of Nuclear Reactor Regulation j '

U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E16 11555 Rockville Pike Rockville,.MD 20852-2738 ,

Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 i

,