2CAN079403, Forwards ISI Summary Rept for Arkansas Nuclear One,Unit 2 Outage 2R10

From kanterella
(Redirected from ML20070G839)
Jump to navigation Jump to search
Forwards ISI Summary Rept for Arkansas Nuclear One,Unit 2 Outage 2R10
ML20070G839
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/15/1994
From: Mims D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20070G846 List:
References
2CAN079403, 2CAN79403, NUDOCS 9407200317
Download: ML20070G839 (2)


Text

. . - , .- . - . - . - . . . . -~ . - - - - - . - . . .

Entstgy Cpgrstisns,Inc.

_ h{#3 v

y.

3 Route 3. Bcx 137G >

Operations a ~e - e.As 7280, Tel 501-964-3100

}

i

. a July 15,1994 2CAN079403 U. S. Nuclear Regulatory Commission i Document Control Desk j Mail Station PI-137 ' .

. Washington, DC 20555

Subject:

- Arkansas Nuclear One - Unit 2 ,

Docket No. 50-368 License No. NPF-6 Inservice Inspection Outage Summary Report l Gentlemen:

l - Article IWA-6230 in Section XI of the American' Society of Mechanical Engineers (ASME)

Boiler and Pressure Vessel Code' requires the Owner to submit an inservice inspection (ISI)-

summary report within 90 days of the completion ~of the..ISI coriducted during a refueling

. outage. As the operator for Arkansas Nuclear One, Unit.2 (ANO-2), Entergy Operations is  ;

t submitting this report on behalf of the Owner, Arkansas Power & Light Company (AP&L).

The scope of the report is to provide the inspection results of the Class 1 and 2 pressure  ;

retaining components and their supports.

I l Included in the attached. report are the Form NIS-1 " Owner's Report: for Inservice ,

Inspections" and a summary of the ISI component examinations. The ISI was performed before and during the tenth refueling outage (2R10) for ANO-2. The outage was completed  :

on April 24,1994. This form was prepared in accordance with the 1989 Edition of Section  :

L XI of the Code.

The NIS-2 forms, " Owner's Report for Repairs and Replacements" are included in the i attachment and address repairs and/or replacements since the completion of the ninth refueling  ;

outage (2R9), October 20, .1992, through the completion of 2R10. Six NIS-2 forms that were not included in the 2R9 ISI Outage Summary Report dated January 18,' 1993 (2CAN019302),

are also attached.

bOCCC3 v

^ <

9407200317=940715- i \ \

i' PDR ADOCK 05000368-. o

i. . Q. _PDR

_ ._ . . _ . _ _ , _. a , 2. _ , _ , , _ . _ _ _

U. S. NRC July 15,1994 2 2CAN079403 Page 2 l Should you have any questions regarding this submittal, please contact me. l Very truly yours, SM%

Dwight C. Mims l Director, Licensing DCM/jjd r

Attachments  ;

I cc: Mr. Leonard J. Callan l Regional Administrator U. S. Nuclear Regulatory Commission ,

Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 i

NRC Senior Resident Inspector Arkansas Nuclear One - ANO-1 & 2 Number 1, Nuclear Plant Road ,

Russellville, AR 72801 )

l Mr. George Kalman l NRR Project Manager Region IV/ANO-1 & 2 U. S. Nuclear Regulatory Commission 1 NRR Mail Stop 13-H-3 l

! One White Flint North l 11555 Rockville Pike l Rockville, MD 20852 l

i i

i l

I I

l

- ..--