HL-4619, Informs That No Further NRC Action Necessary in Response to Util ,Since Valves in Question No Longer Installed in Plant

From kanterella
(Redirected from ML20069L777)
Jump to navigation Jump to search
Informs That No Further NRC Action Necessary in Response to Util ,Since Valves in Question No Longer Installed in Plant
ML20069L777
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 06/13/1994
From: Beckham J
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-10, HL-4619, NUDOCS 9406200240
Download: ML20069L777 (2)


Text

. -

  1. Goorgia Power Company

, 40 inverness Conter Parkway Post Offir.e Box !295 Danungham, Alabama 3s201 Telephono 205 877'7279 o

J. T. Osckham, Jr. Getirgi'l f)otver V(o Pre %rit - Nor..iear Hritch Profx.t '4 t>>'<>< N .

June 13, 1994 Docket No. 50-366 IIL-4619 U.S. Nuclear Regulatory Commission ATTN; Document Control Desk Washington, D.C. 20555 Edwin I. Ilatch Nuclear Plant - Unit 2 Withdrawal of Schedule Change for Actions in Response to Generic Letter 89-10 Gentlemen:

Ily letter dated October 19, 1994, Georgia Power Company informed the Nuclear Regulatoiy Commission (NRC) statrof a potential schedule change associated with testing of motor operated valves in the Unit 2 main steam isolation valve leakage control system (MSIVLCS). Ily letter dated March 17,1994, Unit 2 Technical Specifications amendment number 132 was issued which allowed for removal of the MSIVLCS. This amendment was implemented and the MSIVLCS was physically removed during the Spring 1994 Unit 2 refueling outage.

Consequently, no further NRC action is necessary in response to our letter of October 19, 1993, since the valves in question are no longer installed in the plant.

Please contact this ollice if you have any questions.

Sincerely,

'f

. T. Ileckham, Jr. /

SJIl/cr cc: (See next page.)

l l

1 l

j r )( $ [] '

fI O x0 V \

9406200240 940613 j l PDR ADOCK 05000366 j P PDR

O Georgia Power d U.S. Nuclear Regulatory Commission Page Two June 13, 1994 cc: Georgia Power Compan Mr. II. L. Sumner, Nuclear Plant General Manager NORMS U.S Nuclear Regulatory Commission. Il'ashington, D.C.

Mr. K. Jabbour, Licensing Project Manager - IIatch U.S Nuclear Regulatorv Commission. Reuion H Mr. S. D. Ebneter, Regional Administrator Mr. B. L llolbrook, Senior Resident inspector - Ilatch 1

l l

I