ML19324B783

From kanterella
Jump to navigation Jump to search
Responds to NRC Bulletin 89-002,informing That No Anchor Darling Model S350W Swing Check Valves or Check Valves of Similar Design Exist in Plant.Action Requirements of Bulletin Not Applicable to Plant
ML19324B783
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 11/02/1989
From: Steiger W
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-89-002, IEB-89-2, SNRC-1649, NUDOCS 8911080217
Download: ML19324B783 (2)


Text

,, ,, ,. . - - - - - - - - - - -

-]

jf }.J ^ < >

l ufan- ca w u-vrsa .

, 'pgg .f LONG ISLAND LIGHTING COMPANY SHOREHAM NUCLEAR POWER STATION n m w u m.w.. m w j . i P.o. sox eso, WORTH COUNTRY ROAD

  • WAplNo RIVER. N.Y,11792 g

' wituAs s. 'irmen. Jn.

AnswA:n vice enasiosuT-Nuctraa ortaavious SNRC-1649-  ;

l ggy 2 W  ;

.;b i U. S. Nucisar Regulatory Commission Y

Attn Document Control Desk -

Washington, D. C., 20555

??

LILCO's Response'To NRC Bulletin 89-02 Shoreham'Nucluar Power Station - Unit 1 i Docket No. 50-322

'Gentlement s This letter is written to comply with the reporting-requirements  !

of the subject bulletin. LILCO hereby reports that safety-related swing check valves 2 inches in size or greater r

.were reviewed.for applicability to the informetion provided in  :

NRC Bulletin 89-02. It was determined that no Anchor Derling

.Model S350W swing check' valves or valves of similar design exist in tho-plant and,'by design, no ASTM A-193 Grade B6 type 410SS g internal bolting material exists in any safety-related swing  :

check valve in the plant. This determination was reached after a  !

thorough review of'the SNPS check valve dr.ta base which includes '

every-safety-related check:valvo in the plant 2 inches in size

.and greater. .The construction of valves less than '2 inches in size precludea the problems and concerns addressed by the subject g ~ bulletin. Thus, the'_ action requirements (disassembly and- .

inspection) of the-bulletin are not applicabJe to SNPS.

I Should'you have any questions or, desire additional information concerning this resporese, please- do not heJitate to call my office.

L i

Very.truly fours, 1

) , ,

W. E. Stei e , l l Assistant'V ce President L

Nuclear Operations DRH/ap cca L F. Creacenzo 391108021789Mh22

'W I S. Brown PDR ADOCK pgy , ,, i W. T. Russell G q.

, .is

.+ o a a, . . _ . _ _ __ _ ___ _ _ _

--.a. _ . . _ - . - . . . .

N

.s' .

<{ , '- , ,

>.p ,..

[5 1

o i ;,

AFFIDA'."T t

r STATE OF:NEW YORK )

's ,

a SS:

COUNTY . OF 3"FFOLKL -)

-I, WILLIAM E.'STEIGER. JR., being duly sworn, depose and say that I as the Assistant Vice President - Nuclear Operations for the

, Long Island Lighting Company. I am authorized on the part of

.said company to sign and file with the U.S. Nuclear Regulatory Commission' the enclosed letter (SNRC-1649) for the : Shoreham

' Nuclear Power Station. This response was prepared under,my C , supervision and' directions and the statemente contained therein are true and correct to the best of my knowle dgc, information and belief.

WAL WilTlam E. Steijge

. Sworn'to before me this 2xj day of Thue,,4e,_ 1989

.' ( gg N

.- YMN t441.E

,g~'" 140iARY PUDitc, Si4 y at New Yort No. 4886)67 'au'.fak County

hrm f xpues May 18,19.7/

. n, .

7 <

&., .. ~