Letter Sequence Other |
---|
EPID:L-2018-LLR-0062, Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-03, Version 1.0 (Open) |
|
|
|
---|
Category:Code Relief or Alternative
MONTHYEARML20034E8942020-02-11011 February 2020 Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML19192A1712019-08-0202 August 2019 Relief from Inservice Impractical ASME Code Requirements (FNP-ISI-RR-03) ML18334A2282018-12-10010 December 2018 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-03 ML18320A0572018-11-30030 November 2018 Plant, Units 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2017-03, Code Case N-513-4 for Moderate Pressure NL-18-0428, Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-12018-04-0909 April 2018 Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-1 ML17354A9162017-12-28028 December 2017 Inservice Inspection Alternative FNP-ISI-ALT-05-01, Version 1, to Use ASME Code N-854 (CAC Nos. MG0107 and MF0108; EPID L-2017-LLR-0086) ML17298A4162017-11-0101 November 2017 Relief Request FNP-ISI-ALT-22, Inservice Inspection Alternative for Code Case N-786-1 ML17121A0592017-05-18018 May 2017 Inservice Inspection Alternative (FNP-ISI-ALT-20) ML17006A1092017-01-26026 January 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads Inflange Inspection ML16323A3022016-12-0606 December 2016 Alternative to Inservice Inspection Regarding Spent Fuel Pool Cooling System Drain Line Weld ML16264A3212016-10-14014 October 2016 Alternatives for Pumps and Valves Inservice Testing Program NL-15-0942, Proposed Lnservice Inspection Alternative FNP-ISI-ALT-18, Version 1.02015-07-17017 July 2015 Proposed Lnservice Inspection Alternative FNP-ISI-ALT-18, Version 1.0 ML15104A1922015-05-0505 May 2015 Alternative to Inservice Inspection Regarding Reactor Closure Head Closure Head Nozzle and Partial Penetration Welds ML14262A3172014-12-0505 December 2014 (FNP-ISI-ALT-15, Version 1) Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Cold Leg Nozzle Dissimilar Metal Welds (TAC Nos. MF3687 and MF3688) ML14252A0762014-09-23023 September 2014 Alternative to Inservice Inspection for Reactor Vessel Flange Leak-off Lines ML14169A1952014-07-11011 July 2014 Alternative Request Regarding Containment Building Tendon Examination Schedule NL-11-1543, Response to NRC Request for Additional Information Proposed Relief Request FNP-ISI-RR-012011-08-11011 August 2011 Response to NRC Request for Additional Information Proposed Relief Request FNP-ISI-RR-01 ML1017504022010-07-12012 July 2010 Relief Request for Extension of the Reactor Vessel Inservice Inspection (ISI) Date to the Year 2020 (Plus or Minus One Outage) (Tac No. ME3010) ML1005603342010-03-0202 March 2010 Safety Evaluation of Relief Request FNP-ISI-ALT-08 Version 1.0 for Reactor Vessel Nozzle to Safe-end Dissimilar Metal Weld and Adjacent Austenitic Safe-end Weld Examinations NL-09-1379, Evaluation Results Associated with Relief Request RR-P-32009-09-0808 September 2009 Evaluation Results Associated with Relief Request RR-P-3 ML0917300752009-06-29029 June 2009 (Fnp), Units 1 and 2, Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Requests for Relief ML0820500022008-08-0606 August 2008 Safety Evaluation on Relief Request RR-P-2, RR-P-3 from ASME OM Code Requirements NL-07-1718, Relief Request RR-60 (Version 2.0) Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii)2007-09-12012 September 2007 Relief Request RR-60 (Version 2.0) Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(ii) ML0713602972007-06-0505 June 2007 Relief, Evaluation of Third 10-Year Interval Inservice Inspection Program Plan Request to Relief Nos. RR-42 Through RR-45, RR- 51, RR-58, RR-59, RR-60, & RR-62 ML0705903082007-03-30030 March 2007 Safety Evaluation of Revised Relief Request RR-12 for the Third-Year Interval and Examination Program for Snubbers ML0627703592006-09-29029 September 2006 Evaluation of Relief Request ISI-GEN-ALT-06-02 NL-06-1713, Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays2006-08-10010 August 2006 Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays ML0608302212006-03-28028 March 2006 Request for Relief No. RR-57 and RR-58 Regarding Containment Tendon Inspections ML0511604142005-05-19019 May 2005 Relief, RR-56, Examination of RPV Lower Shell to Bottom Head Circumferential Weld No. APRI-1-1100-8 ML0510301992005-04-25025 April 2005 RR, ISI Program Intervals for Alternative Alignment of Iwe/Iwl Inspection Program (Tac No. MC4870, MC4871, MC4872, MC4873, MC4874, MC4875) ML0418401692004-06-25025 June 2004 Request for Relief No. 55 from ASME Code Repair Requirements for ASME Code Class 3 Service Water System Piping ML0414800332004-05-26026 May 2004 Relief Request, Use of Alternate Code Case ML0407002582004-03-0909 March 2004 Risk-Informed Inservice Inspection Program - ASME Code Category B-F, B-J, C-F-1, and C-F-2 Piping ML0332800372003-11-21021 November 2003 Safety Evaluation Re. Request to Use ASME Code Case N-661 ML0319904652003-07-17017 July 2003 Second and Third 10-Year Interval Inservice Inspection NL-03-0941, Additional Information Re Request for Technical Specification Changes Unit Two Pressurizer Power Operated Relief Valve Block Valve Surveillance2003-04-29029 April 2003 Additional Information Re Request for Technical Specification Changes Unit Two Pressurizer Power Operated Relief Valve Block Valve Surveillance NL-03-0684, ASME Section XI Requests for Relief Number RR-51 and RR-52 Alternative Repair Technique and Inspection Requirement - Reactor Vessel Head2003-03-28028 March 2003 ASME Section XI Requests for Relief Number RR-51 and RR-52 Alternative Repair Technique and Inspection Requirement - Reactor Vessel Head NL-03-0455, Inservice Inspection Program, Additional Information for Request for Relief No. RR-482003-03-10010 March 2003 Inservice Inspection Program, Additional Information for Request for Relief No. RR-48 L-02-023, Updated Interval (Second 10-Year Interval, Third Period and Third 10-Year Interval, First and Second Periods) Request for Relief No. RR-47 from 1989 ASME Code Requirements2002-12-0505 December 2002 Updated Interval (Second 10-Year Interval, Third Period and Third 10-Year Interval, First and Second Periods) Request for Relief No. RR-47 from 1989 ASME Code Requirements ML0231100042002-11-0707 November 2002 Relief Request, Third 10-Year Interval Inservice Inspection Program Request for Relief, TAC No. MB3776 L-02-018, ASME Section XI Relief Requests Number RR-51 and RR-52 Alternative Repair Technique and Inspection Requirement - Reactor Vessel Head2002-09-18018 September 2002 ASME Section XI Relief Requests Number RR-51 and RR-52 Alternative Repair Technique and Inspection Requirement - Reactor Vessel Head ML0220704762002-07-26026 July 2002 Relief Requests for Third 10 Year Inservice Inspection (ISI) Interval ML0220706212002-07-26026 July 2002 7/26/02, Joseph M. Farley, Unit 2, Request for Relief No. RR-46 for the Third 10-Year Inservice Inspection (ISI) Interval 2020-02-11
[Table view] Category:Letter
MONTHYEARML24010A0032024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24026A0532024-01-30030 January 2024 Notification of an NRC Fire Protection Team Inspection- (Report 05000348/2024011, 05000364/2024011) and Request for Information IR 05000348/20230402024-01-24024 January 2024 95001 Supplemental Inspection Report 05000348/2023040 and Follow-Up Assessment Letter ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) NL-24-0011, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-01-11011 January 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23346A2222023-12-22022 December 2023 Transmittal of Dam Inspection Report - Public NL-23-0901, 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers2023-12-15015 December 2023 30-Day 10 CFR 21 Notification - Framatome Supplied Siemens Medium Voltage (Mv) Circuit Breakers NL-23-0908, Cycle 30 Core Operating Limits Report2023-12-13013 December 2023 Cycle 30 Core Operating Limits Report NL-23-0877, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23228A1432023-11-22022 November 2023 Issuance of Amendment Nos. 249 and 246 to Revise TS 3.6.3, Surveillance Requirement 3.6.3.5 to Eliminate Event-Based Testing of Containment Purge Valves with Resilient Seals NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection2023-11-14014 November 2023 Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection ML23318A0672023-10-31031 October 2023 1 to Updated Final Safety Analysis Report, Updated NFPA 805 Fire Protection Program Design Basis Document, Technical Specification Bases Changes, Technical Requirements Manual Changes, IR 05000348/20230032023-10-24024 October 2023 Integrated Inspection Report 05000348/2023003 and 05000364/2023003 IR 05000348/20230912023-10-19019 October 2023 Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letter NRC Inspection Report 05000348/2023091 IR 05000348/20234022023-10-18018 October 2023 Security Baseline Inspection Report 05000348/2023402 and 05000364/2023402 IR 05000348/20234412023-10-12012 October 2023 Supplemental Inspection Report 05000348/2023441 and 05000364/2023441 and Follow-Up Assessment Letter (Cover Letter) ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report NL-23-0739, Response to NRC Inspection Report and Preliminary White Finding2023-09-0808 September 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000348/20230902023-08-31031 August 2023 NRC Inspection Report 05000348/2023090 and Preliminary White Finding and Apparent Violation ML23164A1202023-08-30030 August 2023 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0, to the Requirements of the ASME Code ML23240A0012023-08-30030 August 2023 Correction to Issuance of Amendment Nos. 241, 242, 243, and 244 ML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) NL-23-0716, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0713, Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-23023 August 2023 Response to Request for Additional Information Regarding Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit IR 05000348/20330012023-08-14014 August 2023 NRC Operator License Examination Report 05000348/203301 and 05000364/2023302 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal IR 05000348/20230022023-08-10010 August 2023 Integrated Inspection Report 05000348/2023002 and 05000364/2023002, and Apparent Violation ML23221A3062023-08-0909 August 2023 Notification of NRC Supplemental Inspection (95002) and Request for Information (Cover Letter) NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI NL-23-0628, Readiness for Supplemental Inspection EA-22-1012023-07-26026 July 2023 Readiness for Supplemental Inspection EA-22-101 NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications ML23136B1542023-07-0303 July 2023 Issuance of Amendment Nos. 246 & 243, Regarding License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis IR 05000348/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 05000348/2023010 and 05000364/2023010 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal ML23164A2182023-06-14014 June 2023 Draft Safety Evaluation for License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated SFP Criticality Analysis (EPID L-2022-LLA-0138) - Letter NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0449, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2023-06-0202 June 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0337, Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.52023-05-0505 May 2023 Response to Request for Additional Information Related to License Amendment Request to Revise the Frequency of Surveillance Requirement 3.6.3.5 IR 05000348/20234402023-05-0505 May 2023 Reissue Farley Units-Final Significance Determination for a Security-Related Greater than Green Finding, Nov and Assessment Followup LTR, IR 05000348/2023440 and 05000364/2023440 - Cover IR 05000348/20230012023-05-0404 May 2023 Integrated Inspection Report 05000348/2023001 and 05000364/2023001 NL-23-0295, Reply to a Notice of Violation; EA-22-1012023-05-0101 May 2023 Reply to a Notice of Violation; EA-22-101 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 2024-01-30
[Table view] Category:Safety Evaluation
MONTHYEARML23228A1432023-11-22022 November 2023 Issuance of Amendment Nos. 249 and 246 to Revise TS 3.6.3, Surveillance Requirement 3.6.3.5 to Eliminate Event-Based Testing of Containment Purge Valves with Resilient Seals ML23164A1202023-08-30030 August 2023 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0, to the Requirements of the ASME Code ML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23136B1542023-07-0303 July 2023 Issuance of Amendment Nos. 246 & 243, Regarding License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated Spent Fuel Pool (SFP) Criticality Analysis ML23164A2072023-06-14014 June 2023 Draft Safety Evaluation for License Amendment Request to Revise Technical Specification 4.3, Fuel Storage, to Correct Tabulated Values from the Associated SFP Criticality Analysis (EPID L-2022-LLA-0138) - Draft Safety Evaluation ML23054A4552023-03-16016 March 2023 Issuance of Amendment Nos. 245 and 242, Regarding LAR to Revise Technical Specification 3.4.10, Pressurizer Safety Valves, to Decrease Low Side Setpoint Tolerance LCO Value ML22308A0592022-11-0808 November 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a Licensee-Controlled Document ML22286A0742022-11-0808 November 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Relocate Augmented Piping Inspection Program Details to a Licensee-Controlled Document ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves ML22032A2432022-03-0707 March 2022 Issuance of Amendment Nos. 241 and 238 to Eliminate the Encapsulation Vessels Around the First Containment Spray and Residual Heat Removal / Low Head Safety Injection Recirculation Suction Isolation Valves ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21344A0032022-01-26026 January 2022 Issuance of Amendments Regarding Revision to Use Beacon Power Distribution Monitoring System ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls ML21217A0912021-09-21021 September 2021 SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21167A3152021-07-30030 July 2021 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-541, Rev.2, Add Exceptions to Surveillance Requirements for Valves & Dampers Locked in Actuated Position ML21137A2472021-06-30030 June 2021 Issuance of Amendment Nos. 233 and 230, Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components ML21161A2012021-06-22022 June 2021 Associated Independent Spent Fuel Storage Facilities - Reduction in Commitment to the Quality ML20303A1192020-12-11011 December 2020 Issuance of Amendment Nos. 232 and 229 Regarding Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML20224A2852020-10-13013 October 2020 Issuance of Amendment Nos. 231 and 228 to Revise Technical Specifications 3.3.1 and 3.3.7 ML20121A2832020-10-0909 October 2020 Issuance of Amendments 230 and 227 Measurement Uncertainty Recapture Power Uprate ML20196L9292020-10-0606 October 2020 Issuance of Amendment Nos. 229 and 226 Regarding Spent Fuel Pool Criticality Safety Analysis ML20132A2072020-05-0808 May 2020 9 to the Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant and Chapter 2 (Part 1 of 3); Redacted Version ML20034E8942020-02-11011 February 2020 Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19261A0142019-09-23023 September 2019 Correction to Safety Evaluation for Amendment Nos. 225 and 222 Regarding Implementation of NEI 06-09, Revision 0-A ML19175A2432019-08-23023 August 2019 Issuance of Amendments 225 and 222 Implementation of NEI 06-09, Risk-Informed Technical Specifications Initiative 4B, Risk-Managed Technical Specification (Rmts) Guidelines, Revision 0-A ML19213A1942019-08-0808 August 2019 Relief from Impractical American Society of Mechanical Engineers Code Requirements (FNP-ISI-RR-02) ML19192A1712019-08-0202 August 2019 Relief from Inservice Impractical ASME Code Requirements (FNP-ISI-RR-03) ML19156A2622019-07-30030 July 2019 Issuance of Amendments 224 and 221 Performance-Based Fire Protection Alternative for Thermal Insulation Material ML19071A1382019-07-16016 July 2019 Issuance of Amendments 223 and 220 Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations TSTF-51 and TSTF-471 ML19129A2322019-07-0101 July 2019 Inservice Inspection Alternative, FNP-ISI-ALT-05-04, Regarding Examination Frequency for Tendon Anchorhead Replacement ML19064A7742019-04-26026 April 2019 Issuance of Amendments Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum on Shift Staff Tables ML18334A2282018-12-10010 December 2018 Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-03 ML18320A0572018-11-30030 November 2018 Plant, Units 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2017-03, Code Case N-513-4 for Moderate Pressure ML18271A2072018-11-0707 November 2018 Issuance of Amendments 221 and 218 Technical Specification 3.3.2 Regarding Steam Flow Isolation on High Steam Flow ML18183A0732018-07-26026 July 2018 Unites 1, 2, 3, and 4; and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2(CAC Nos. MG0188, MG0189, MG0191, MG0192, MG0193, MG0194, and MG0195; EPID L-2017-LLA-0293) ML18151A1742018-06-27027 June 2018 Issuance of Amendment Nos. 219 and 216, Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable ML17291A7812018-03-0101 March 2018 Issuance of Amendments to Correct Non-Conservative Technical Specification 3.7.1 (CAC Nos. MF9465 and MF9466; EPID L-2017-LLA-0181) ML17261A0872018-02-28028 February 2018 Issuance of Amendments to Revise Actions of TS 5.5.17, Containment Leakage Rate Testing Program (CAC Nos. MF8844 and MF8845; EPID No. L-2016-LLA-0015) ML18022A1072018-01-25025 January 2018 Inservice Inspection Alternative GEN-ISI-ALT-2017-02, Version 1.0, Regarding the Use of ASME Code Case N-789-1 (CAC Nos. MF9942, MF9943, MF9944, and MF9945; EPID L-2017-LLR-0059) ML17354A9162017-12-28028 December 2017 Inservice Inspection Alternative FNP-ISI-ALT-05-01, Version 1, to Use ASME Code N-854 (CAC Nos. MG0107 and MF0108; EPID L-2017-LLR-0086) ML17271A2652017-12-20020 December 2017 Issuance of Amendments Adopting Alternative Source Term, TSTF-448, and TSTF-312 (CAC Nos. MF8861, MF8862, MF8916, MF8917, MF8918, MF8919; Epids Nos. L-2016-LLA-0017,L-2016-LLA-0018, L-2016-LLA-0019) ML17298A4162017-11-0101 November 2017 Relief Request FNP-ISI-ALT-22, Inservice Inspection Alternative for Code Case N-786-1 ML17269A1662017-11-0101 November 2017 Issuance of Amendments Related to NFPA 805 Supplement (CAC Nos. MG0094 and MG0095; EPID L-2017-LLA-0261) ML17214A5462017-10-0202 October 2017 Issuance of Amendments Regarding the Adoption of TSTF-547, Revision 1, Clarification of Rod Position Requirements ML17205A0202017-09-15015 September 2017 Issuance of Amendments to Revise TS 3.8.9, Distribution Systems - Operating ML17180A4392017-07-18018 July 2017 Inservice Testing Alternative for Pumps Per Code Case OMN-20 (RR-VR-01) ML17152A2182017-06-30030 June 2017 Southern Nuclear Fleet - Issuance of Amendments Regarding the Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing (CAC Nos. MF8176 - MF8181) 2023-08-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 10, 2018 Ms. Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Company, Inc.
3535 Colonnade Parkway Birmingham, AL 35243
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 - PROPOSED INSERVICE INSPECTION ALTERNATIVE FNP-ISI-ALT-05-03 (EPID L-2018-LLR-0062)
Dear Ms. Gayheart:
By letter dated April 18, 2018, Southern Nuclear Operating Company, Inc. (SNC, the licensee),
requested approval to use an alternative to the inservice inspection requirements of the American Society of Mechanical Engineers (ASME) Code Case N-770-2 for the Reactor Pressure Vessel cold-leg nozzle dissimilar metal welds for the Joseph M. Farley Nuclear Plant (Farley, FNP), Unit 2. The proposed alternative would allow deferral of the examinations from the Farley, Unit 2, refueling outage (2R26), which is currently scheduled to start spring 2019, to the following refueling outage (2R27), which is scheduled to start fall 2020.
The licensee submitted the proposed alternative pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.55a(z)(2), on the basis that the ASME Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality of safety.
The U.S. Nuclear Regulatory Commission (NRC) staff has completed its review of alternative FNP-ISI-ALT-05-03. As set forth in the enclosed safety evaluation, the NRC staff has determined that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(2). Accordingly, the NRC staff concludes that complying with the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Therefore, the NRC staff authorizes the use of alternative FNP-ISI-ALT-05-03 at Farley, Unit 2, up to and including refueling outage 2R27, currently scheduled to start in fall 2020.
All other ASME Code, Section XI, requirements for which relief was not specifically requested and approved in this request remain applicable, including the third-party review by the Authorized Nuclear lnservice Inspector.
C. Gayheart If you have any questions, please contact the Project Manager, Shawn Williams, at 301-415-1009 or by e-mail at Shawn.Williams@nrc.gov.
Sincerely,
~<:-fa~
Michael T. Markley, Chief Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-364
Enclosure:
Safety Evaluation cc: Listserv
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION PROPOSED ALTERNATIVE FNP-ISI-ALT-05-03 PROPOSED ALTERNATIVE TO REACTOR VESSEL NOZZLE WELD EXAMINATION FREQUENCY REQUIREMENTS SOUTHERN NUCLEAR OPERATING COMPANY JOSEPH M. FARLEY NUCLEAR PLANT, UNIT 2 DOCKET NO. 50-364
1.0 INTRODUCTION
By letter dated April 18, 2018 (Agencywide Documents Access and Management System Accession No. ML18108A070), Southern Nuclear Operating Company, Inc., (SNC, the licensee) requested approval to use an alternative to the inservice inspection (ISi) requirements of the American Society of Mechanical Engineers (ASME) Code Case N-770-2 for the Reactor Pressure Vessel (RPV) cold-leg nozzle dissimilar metal welds for the Joseph M. Farley Nuclear Plant (Farley, FNP), Unit 2. The proposed alternative would allow deferral of the examinations from the Farley, Unit 2, refueling outage (2R26), which is currently scheduled to start spring 2019, to the following refueling outage (2R27), which is schedule to start fall 2020.
Pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Paragraph 50.55a(z)(2), the licensee requested to use the alternative on the basis that complying with the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
2.0 REGULATORY EVALUATION
Adherence to Section XI of the ASME Code is mandated by 10 CFR 50.55a(g)(4), lnservice inspection standards requirement for operating plants, which states, in part:
Throughout the service life of a boiling or pressurized water-cooled nuclear power facility, components (including supports) that are classified as ASME Code Class 1, Class 2, and Class 3 must meet the requirements, except design and access provisions and preservice examination requirements, set forth in Section XI ... to the extent practical within the limitations of design, geometry, and materials of construction of the components.
Enclosure
Pursuant to 10 CFR 50.55a(g)(6)(ii), Augmented ISi program, the U.S. Nuclear Regulatory (NRC) may require licensees to follow an augmented ISi program for systems and components for which the Commission deems that added assurance of structural reliability is necessary.
Pursuant to 10 CFR 50.55a(g)(6)(ii)(F)(1 ), Augmented ISi requirements: Examination requirements for Class 1 piping and nozzle dissimilar-metal butt welds-(1) Implementation, licensees shall implement the requirements of ASME BPV Code Case N-770-2 instead of ASME BPV Code Case N-770-1, subject to the conditions specified in paragraphs (g)(6)(ii)(F)(2) through ( 13) of Section, by the first refueling outage starting after August 17, 2017.
Pursuant to 10 CFR 50.55a(z), Alternatives to codes and standards, states that alternatives to the requirements of paragraphs (b) through (h) of this section may be used when authorized by the Director, Office of Nuclear Reactor Regulation. A proposed alternative must be submitted and authorized prior to implementation. The licensee must demonstrate (1) the proposed alternative would provide an acceptable level of quality and safety; or (2) compliance with the specified requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Based on the above, and subject to the following technical evaluation, the NRC staff finds that regulatory authority exists for the licensee to request and the NRC to authorize the licensee's proposed alternative for Farley, Unit 2.
3.0 TECHNICAL EVALUATION
3.1 ASME Code Components Affected by the Proposed Alternative The licensee's request is applicable to the following RPV inlet nozzle-to-safe end Dissimilar Metal Butt Welds (DMBWs) for Farley, Unit 2:
Component ID Description APR 1-41 00-14DM Inlet Nozzle OM Weld at 335 degrees APR 1-4200-14DM Inlet Nozzle OM Weld at 215 degrees APR 1-4300-14DM Inlet Nozzle OM Weld at 95 degrees 3.2 Applicable Code Edition, Addenda, and Requirement Paragraph 10 CFR50.55a(g)(6)(ii)(F) requires licensees of pressurized-water reactors to implement the requirements of ASME Code Case N-770-2 subject to conditions specified in paragraphs (g)(6)(ii)(F)(2) through (13) of that section. ASME Code Case N-770-2, Inspection Item 8 requires unmitigated butt weld at Cold Leg operating temperatures between 525 degree Fahrenheit (°F) and 580°F to be volumetrically examined every second inspection period not to exceed 7 years.
The applicable Code edition and addenda is the 2007 Edition with Addenda through 2008 of ASME Code Section XI.
3.3 Licensee's Proposed Alternative The licensee's proposed alternative is to extend the weld examination frequency required by 10 CFR 50.55a(g)(6)(ii)(F) for the Farley, Unit 2 RPV inlet nozzle DMBWs listed in Section 3.1 of this safety evaluation for an additional operating cycle to allow examination during refueling outage 2R27 which is scheduled to begin in fall 2020.
3.4 Licensee's Bases for Use The licensee is seeking NRC authorization of the proposed alternative in accordance with 10 CFR 50.55a(z)(2) on the basis that compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The licensee is requesting the deferral of the volumetric examination of the subject welds to limit the number of core barrel removals to facilitate inspection and mitigation of the subject welds and align the single core barrel removal with the required inspections of four other components during refueling outage 2R27, which is currently scheduled in fall of 2020. The licensee estimates the hardship associated with the additional core barrel lift will be between 152. 7 millirem and 495.5 millirem radiological dose, based on previous operating experience.
Also, the licensee notes the increased burden due to core barrel removal and the risk associated with a heavy equipment lifting operation to personnel and components.
Additionally, the licensee indicated that its proposed alternative does not adversely impact the level of safety or quality and provides reasonable assurance that the structural integrity and the leak tightness of the subject weld will be maintained for several reasons, including but not limited to:
- The most recent volumetric examinations in 2010 were performed in accordance with procedures and personnel qualified to Section XI, Appendix VIII, Supplement 10 requirements and included eddy current examinations of the weld surface. These examinations achieved essentially 100 percent coverage for both circumferential and axial flaws, with no relevant indications noted during the examination.
- Plant-specific crack growth evaluation concluded that more than 10.5 years of effective full power years (EFPY) is required for the most limiting flaw growth of an axial flaw from the standard volumetrically qualified detection limit to the allowable size per the ASME Section XI IWB-3640 flaw evaluation procedure. The licensee's request requires a projected EFPY of 9.7 (6.8 actual through 2R25 plus 2.9 EFPY projected to the start of 2R27), which is less than the hypothetical flaw growth with a margin of almost one year.
3.5 Duration of Proposed Alternative The licensee requested that the NRC authorize this alternative to extend the volumetric inspection interval for examination of the subject welds up to and including refueling outage 2R27, currently scheduled to start in fall 2020.
3.6 NRC Staff's Technical Evaluation The NRC staff has reviewed and evaluated the licensee's request on the basis that compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The applicable requirement is the qualified volumetric inspection of the subject welds within 7 years of the previous qualified
volumetric inspection. This requirement is based on a general assessment of the necessary qualified volumetric inspection frequency for all cold leg operating temperature DMBWs, of any size, in the reactor coolant system to maintain structural integrity. Under this inspection requirement, the welds are expected to have no previous indications of Primary Water Stress Corrosion Cracking (PWSCC). The licensee stated in their submittal that no PWSCC has been found in these welds. The NRC staff verified this information and confirms that the licensee-identified DMBWs that are the subject of this proposed alternative are applicable to this inspection category and technical basis for qualified volumetric inspection frequency.
The licensee identified a hardship associated with the performance of the qualified volumetric inspection frequency within the current requirements. The licensee noted that the current required volumetric inspection frequency would require an additional core barrel removal to facilitate inspection and planned mitigation of the subject welds, as well as, required inspections of four other components. Based on previous outages, the licensee estimates the occupational dose to be between 152 millirem and 495 millirem for removal and reinstallation of the core barrel. The NRC staff finds the licensee's estimate of radiological dose is reasonable based on previous operational experience for the Farley units. Also, the licensee noted the increased burden due to core barrel removal and the risk associated with a heavy equipment lifting operation to personnel and components. The NRC staff finds the licensee has provided sufficient basis to demonstrate a hardship associated with the current required volumetric inspection frequency of the subject welds. Therefore, the NRC staff finds the licensee meets the hardship requirement of 10 CFR 50.55a(z)(2).
The NRC staff reviewed the level quality and safety of the licensee's proposed alternative to allow an approximately two and one half year delay in the qualified volumetric examination, beyond the original regulatory requirement of 7 years. As part of this analysis, the NRC staff reviewed the licensee's technical basis regarding past operating history and plant specific flaw analysis. Furthermore, the NRC staff performed an independent flaw evaluation for the subject welds to verify the conclusions of the licensee's analysis. Based on the above, the NRC finds sufficient justification for the requested duration.
The licensee provided the results of the most recent volumetric examinations of the welds, which show no reportable PWSCC indications. The original ?-year frequency requirement for a volumetric inspection is only valid for welds with no previous indications of PWSCC. Therefore, the results of the most recent volumetric examinations of these welds was to necessary to ensure the correct classification of the inspection category of the welds. However, these results alone did not provide sufficient basis to support the proposed alternative. The additional eddy current inspections, although not required by ASME Code Section XI, are more effective than the required volumetric examinations for finding shallow flaws. Thus, the NRC staff finds that the combined results of the volumetric examinations and the eddy current inspections provide sufficient basis to support the proposed alternative.
The licensee performed both an axial and circumferential flaw analysis to support the extension of the required volumetric inspection frequency. The purpose of these analyses is to demonstrate that a hypothetical PWSCC flaw will not grow to an unacceptable size within the period of extended inspection frequency. The NRC staff reviewed the licensee's flaw analyses' inputs and found the licensee's inputs are acceptable. The licensee's analysis documented the time for a flaw to meet an ASME BPV Code limit of 75 percent through-wall depth of the weld.
The licensee's most limiting analysis found that an axial flaw would take 10.5 EFPY to reach 75 percent through-wall depth. The NRC staff notes that this time is the limiting analysis as a circumferential flaw would take longer to reach these conditions, and longer still to cause failure
of the structural integrity of the weld. The NRC staff also notes that only the growth of a circumferential flaw could result in a loss of structural integrity, because a circumferential flaw can grow around the weld, which could lead to a guillotine break in the pipe. Alternatively, given that PWSCC does not propagate through either the stainless steel or low alloy steel adjacent to the weld, the NRC staff recognizes that axial flaws cannot grow sufficiently in length to cause a rupture of the weld and adjacent piping system in a DMBW. The NRC staff's review of the licensee's flaw analysis finds its methodology acceptable for circumferential and axial flaw growth. Given these failure mechanisms, the NRC staff finds that the conclusions of the licensee's flaw analysis demonstrate structural integrity of the subject DMBWs will be maintained if the volumetric inspection frequency is extended per the licensee's proposed alternative.
The NRC staff performed a series of independent flaw evaluations. The NRC staff completed several sensitivity analyses to determine the margin to leakage and rupture of the subject DMBWs. The NRC staff recognizes that there are significant uncertainties in the performance of these flaw analyses. Conservative assumptions are used to address these uncertainties.
The level of conservatism applied can significantly affect the results. As a result, variations in results should not be viewed as either correct or incorrect but rather as an input to the overall assessment of the licensee's proposed alternative. The NRC staff's calculations utilize the same guidelines as the licensee used, Electric Power Research Institute (EPRI) Report, "Materials Reliability Program: Primary Water Stress Corrosion Cracking (PWSCC) Flaw Evaluation Guidance (MRP-287)," dated December 2010. The NRC endorsed EPRI Report MRP-287 in a letter dated February 28, 2011 (ADAMS Accession No. ML110620628). The NRC staff flaw analysis used the NRC accepted licensee inputs, and industry inputs for sensitivity analyses. The NRC staff calculation results confirm the conclusions of the licensee's flaw analysis for circumferential flaw growth. The NRC staff calculations for circumferential flaws confirmed the licensee's conclusion that structural integrity would be maintained during the period of the licensee's requested volumetric inspection extension. Furthermore, the NRC staff's sensitivity analysis confirmed significant margin for time to rupture beyond this time frame even under earthquake loading conditions.
The NRC staff conducted extensive crack growth analysis using a range of weld residual stresses, initial crack sizes based on the minimum qualified volumetric inspection detection capability, and a range of crack growth rates. These analysis found some cases where axial flaws could potentially grow to exceed the ASME Code allowable limit of 75 percent through-weld within the period of extended inspection frequency of the licensee's proposed alternative.
However, based on the NRC staff confirmatory flaw analysis results that structural integrity would be maintained by the subject DMBWs with significant margin for the licensee's proposed inspection interval, the NRC staff finds the proposed alternative acceptable.
Therefore, the NRC staff concludes that the licensee's proposed volumetric inspection frequency extension provides reasonable assurance of structural integrity of the subject welds.
The NRC staff concludes that the licensee's proposed alternative is acceptable on the basis that compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
4.0 CONCLUSION
As set forth above, the NRC staff concludes that the licensee has demonstrated the proposed alternative in Relief Request No. FNP-ISI-ALT-05-03, Version 1.0, provides reasonable assurance of structural integrity of the subject components and that complying with the specified
ASME BPV Code requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(z)(2). Therefore, the NRC staff authorizes the licensee the use of Relief Request FNP-ISI-ALT-05-03, Version 1.0, at Farley, Unit 2 up to and including refueling outage 2R27, currently scheduled to start in fall 2020.
All other ASME Code, Section XI, requirements for which relief was not specifically requested and approved in this request remain applicable, including the third-party review by the Authorized Nuclear lnservice Inspector.
Principal Contributor: J. Collins, NRR Date: December 10, 2018