Category:Letter
MONTHYEARIR 05000456/20230042024-02-0202 February 2024 Integrated Inspection Report 05000456/2023004 and 05000457/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference 05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case2023-11-17017 November 2023 Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case ML23321A0442023-11-17017 November 2023 Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination IR 05000456/20230022023-08-0303 August 2023 Integrated Inspection Report 05000456/2023002 and 05000457/2023002 ML23188A1292023-07-26026 July 2023 Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23110A1152023-06-12012 June 2023 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2023-LLA-0042) (Letter) RS-23-074, Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-06-0909 June 2023 Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23138A1342023-05-18018 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station ML23132A0472023-05-12012 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ML23130A0072023-05-10010 May 2023 Submittal of Core Operating Limits Report Cycle 24, Rev. 16 IR 05000456/20230012023-05-0808 May 2023 Integrated Inspection Report 05000456/2023001 and 05000457/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23118A0202023-04-28028 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 RS-23-055, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2023-04-10010 April 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML23095A1292023-04-0505 April 2023 Steam Generator Tube Inspection Report for Refueling Outage 23 ML23094A1352023-04-0404 April 2023 Request for Information for Nrc Commercial Grade Dedication Inspection Inspection Report 05000456/2023010 05000457/2023010 RS-23-052, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-03-24024 March 2023 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations 2024-02-02
[Table view] Category:License-Operator
MONTHYEARML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML21110A4952021-04-19019 April 2021 GFE Results, March 2021 ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final BW200057, Bwd 2020 Ile Post-Exam Package Cover2020-06-27027 June 2020 Bwd 2020 Ile Post-Exam Package Cover ML22173A2432020-06-0909 June 2020 Bwd 2020 Ile Administered RO and SRO Admin JPMs-Final ML22173A2472020-06-0909 June 2020 Bwd 2020 Ile Administered Scenarios-Final ML22173A2462020-06-0909 June 2020 Bwd 2020 Ile Administered System and Inplant JPMs-Final ML22173A2512020-06-0909 June 2020 Bwd 2020 Ile Administered Written Exam with Handout-Final ML20135H2062020-05-14014 May 2020 Operator Licensing Examination Approval ML22173A2582020-03-11011 March 2020 Bwd 2020 Ile Es 401-6 Signed ML22173A2632020-03-11011 March 2020 Bwd 2020 Ile Proposed Simulator Scenarios-Final ML22173A2642020-03-11011 March 2020 Bwd 2020 Ile Proposed Written Exam RO-SRO-Final ML22173A2612020-03-11011 March 2020 Bwd 2020 Ile Proposed RO and SRO Admin JPMs-Final ML22173A2622020-03-11011 March 2020 Bwd 2020 Ile Proposed System and Inplant JPMs-Final ML22173A2572020-03-11011 March 2020 Bwd 2020 Ile ES-301-6 Competencies Checklists ML22173A2562020-03-11011 March 2020 Es 301-4 ML22173A2552020-03-11011 March 2020 Es 301-3 Signed ML22173A2602020-02-20020 February 2020 Bwd 2020 Ile Proposed Written Exam Submittal Letter ML22174A0732019-12-20020 December 2019 Ile ES-D-1s ML22174A0402019-12-20020 December 2019 Ile ES-301-5 Transient and Event Checklists ML22174A0392019-12-20020 December 2019 Ile ES-201-2 Outline Quality Checklist ML22174A0692019-12-20020 December 2019 Ile ES-401-2 and 401-3-Final ML22174A0672019-12-20020 December 2019 Ile RO and SRO ES-301-2 ML22174A0602019-12-20020 December 2019 Ile RO and SRO ES-301-1 BW190114, Ile Outline Submittal Letter2019-12-16016 December 2019 Ile Outline Submittal Letter ML22173A2592019-12-16016 December 2019 Bwd 2020 Ile Proposed Operating Test Submittal Letter ML19329A0482019-11-22022 November 2019 Revised Confirmation of Initial License Examination (Rdb) ML19294A7822019-10-21021 October 2019 Confirmation of Initial License Examination ML19277H0032019-06-19019 June 2019 2019 Braidwood Ile Form ES-301-3 ML19277G9232019-06-19019 June 2019 2019 Braidwood Ile Forms ES-301-6 Rev 1 2023-08-25
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22199A1732022-04-0505 April 2022 Ile ES-201-3 Security Agreement-Final ML22199A1742022-04-0505 April 2022 Ile ES-403-1 Written Exam Grading Quality Checklist ML22199A1702022-04-0505 April 2022 Ile ES-201-1 Examination Prep Checklist BW220023, Ile Post-Examination Submittal Letter (03/30/2022)2022-03-30030 March 2022 Ile Post-Examination Submittal Letter (03/30/2022) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22053A0692022-02-23023 February 2022 Operator Licensing Examination Approval ML22199A2532022-02-22022 February 2022 Ile ES-301-5 Transient and Event Checklists ML22199A2472022-02-22022 February 2022 Ile ES-201-2 NRC-Developed Outline Quality Checklist-Signed ML22199A2342022-02-18018 February 2022 ES-401-6 Written Exam Quality Checklist ML22199A2272022-02-18018 February 2022 ES-301-3 and ES-301-4 Op Test Quality Checklists ML22199A2302022-02-18018 February 2022 ES-301-6 Competencies Checklists ML21224A2432021-08-17017 August 2021 Confirmation of Initial License Examination ML22173A2282020-07-17017 July 2020 Bwd 2020 Ile ES-201-1 Rev 11-Final ML22173A2372020-07-17017 July 2020 Bwd 2020 Ile ES-401-9 Written Exam Comments-Final ML22173A2292020-07-17017 July 2020 Bwd 2020 Ile Es 201-3 Final ML22173A2302020-07-17017 July 2020 Bwd 2020 Ile Es 403-1 Signed ML22173A2352020-07-17017 July 2020 Bwd 2020 Ile ES-401-4 Record of Rejected KAs Rev 11 ML22173A2332020-07-17017 July 2020 Bwd 2020 Ile ES-301-7 Operating Test Review Comments ML22173A2392020-07-17017 July 2020 Bwd 2020 Ile Outline Comments BW200057, Bwd 2020 Ile Post-Exam Package Cover2020-06-27027 June 2020 Bwd 2020 Ile Post-Exam Package Cover ML22173A2472020-06-0909 June 2020 Bwd 2020 Ile Administered Scenarios-Final ML22173A2432020-06-0909 June 2020 Bwd 2020 Ile Administered RO and SRO Admin JPMs-Final ML22173A2512020-06-0909 June 2020 Bwd 2020 Ile Administered Written Exam with Handout-Final ML22173A2462020-06-0909 June 2020 Bwd 2020 Ile Administered System and Inplant JPMs-Final ML20135H2062020-05-14014 May 2020 Operator Licensing Examination Approval ML22173A2552020-03-11011 March 2020 Es 301-3 Signed ML22173A2622020-03-11011 March 2020 Bwd 2020 Ile Proposed System and Inplant JPMs-Final ML22173A2572020-03-11011 March 2020 Bwd 2020 Ile ES-301-6 Competencies Checklists ML22173A2562020-03-11011 March 2020 Es 301-4 ML22173A2582020-03-11011 March 2020 Bwd 2020 Ile Es 401-6 Signed ML22173A2612020-03-11011 March 2020 Bwd 2020 Ile Proposed RO and SRO Admin JPMs-Final ML22173A2642020-03-11011 March 2020 Bwd 2020 Ile Proposed Written Exam RO-SRO-Final ML22173A2632020-03-11011 March 2020 Bwd 2020 Ile Proposed Simulator Scenarios-Final ML22173A2602020-02-20020 February 2020 Bwd 2020 Ile Proposed Written Exam Submittal Letter ML22174A0602019-12-20020 December 2019 Ile RO and SRO ES-301-1 ML22174A0402019-12-20020 December 2019 Ile ES-301-5 Transient and Event Checklists ML22174A0732019-12-20020 December 2019 Ile ES-D-1s ML22174A0672019-12-20020 December 2019 Ile RO and SRO ES-301-2 ML22174A0692019-12-20020 December 2019 Ile ES-401-2 and 401-3-Final ML22174A0392019-12-20020 December 2019 Ile ES-201-2 Outline Quality Checklist BW190114, Ile Outline Submittal Letter2019-12-16016 December 2019 Ile Outline Submittal Letter ML22173A2592019-12-16016 December 2019 Bwd 2020 Ile Proposed Operating Test Submittal Letter ML19329A0482019-11-22022 November 2019 Revised Confirmation of Initial License Examination (Rdb) ML19294A7822019-10-21021 October 2019 Confirmation of Initial License Examination ML19275H2952019-06-19019 June 2019 2019 Braidwood Ile Form ES-201-1 ML19275H4122019-06-19019 June 2019 2019 Braidwood Ile Form ES-403-1 ML19275H3712019-06-19019 June 2019 2019 Braidwood Ile Form ES-201-3 ML19277H0032019-06-19019 June 2019 2019 Braidwood Ile Form ES-301-3 2023-08-25
[Table view] |
Text
September 20, 2018 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BRAIDWOOD STATIONCONFIRMATION OF INITIAL LICENSE EXAMINATION
Dear Mr. Hanson:
In a meeting on September 17, 2018, between Mr. J. Beard, Senior Operations Instructor, and Mr. J. Seymour, Operations Engineer, arrangements were made for the administration of operator licensing examinations at the Braidwood Station, during the weeks of June 3-10, 2019.
In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of May 6, 2019.
As agreed upon during the meeting, your staff will prepare the examinations based on the guidelines in Revision 11 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors. The NRCs regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by January 4, 2019. The NRC staff will provide the written examination outline on or before October 26, 2018. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201, will be due by March 20, 2019. Pursuant to Title 10 of the Code of Federal Regulations, Part 55.40(b)(3), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use.
We request that any personal, proprietary, sensitive unclassified, or Safeguards Information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled.
To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests, along with any video and audio recordings of the dynamic operating tests, until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
B. Hanson Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150-0090) at least 60 days before the first examination date (if possible). Contact Mr. J. Seymour to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024) should be submitted at least 30 days before the first examination date. If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary. Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, Personal Qualifications StatementLicensee, or as directed by Mr. J. Seymour when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The burden to the public for these voluntary information collections is estimated to average 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to Freedom of Information Act, Privacy and Information Collections Branch (T-5F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
B. Hanson Thank you for your cooperation in this matter. Mr. J. Beard has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRCs examination procedures and guidelines, please contact Jesse Seymour at 630-829-9561, or me at 630-829-9834.
Sincerely,
/RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Distribution via LISTSERV R. Cameron, Training Manager
B. Hanson Letter to Bryan C. Hanson from Robert J. Orlikowski dated September 20, 2018
SUBJECT:
BRAIDWOOD STATIONCONFIRMATION OF INITIAL LICENSE EXAMINATION DISTRIBUTION:
Christopher Cook RidsNrrDorlLpl3 RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII Colleen Schmidt Caroline Randiki ADAMS Accession Number: ML18263A309 OFFICE RIII RIII NAME JSeymour:jw ROrlikowski DATE 09/20/18 09/20/18 OFFICIAL RECORD COPY