Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] Category:Periodic Monitoring Report (Radiological/Environmental)
MONTHYEARML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 ML23114A3812023-04-24024 April 2023 (WCGS) - 2022 Annual Radiological Environmental Operating Report ML22116A2602022-04-26026 April 2022 2021 Annual Radiological Environmental Operating Report ML20118D0172020-04-26026 April 2020 2019 Annual Radioactive Effluent Release Report - Report 43 ML18138A2792018-05-10010 May 2018 Correction to 2015 Annual Radioactive Effluent Release Report - Report 39 ML12129A3842012-04-30030 April 2012 Annual Radioactive Effluent Release Report - Report 35 2023-04-27
[Table view] |
Text
-'~
~L REEK
_c
~\
FC
-,NUCLEAR OPERATING CORPORATION May 10, 2018 Cynthia R. Hafenstine Manager Nuclear and Regulatory Affairs RA 18-0056 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
References:
- 1) Letter RA 16-0034, dated April 28, 2016, from C. R. Hafenstine, WCNOC, to USNRC
- 2) Letter RA 16-0059, dated August 17, 2016, from C. R. Hafenstine, WCNOC, to USNRC
Subject:
Docket No. 50-482: Correction to Wolf Creek Generating Station 2015 Annual Radioactive Effluent Release Report - Report 39 To Whom It May Concern:
Reference 1 provided the Wolf Creek Generating Station 2015 Annual Radioactive Effluent Report. Subsequent to the submittal of Reference 1, it was discovered that an error existed in the report. Reference 2 provided the corrected pages for the errors found in the report in Reference 1. The corrected pages provided in Reference 2 contained a typographical error in the subject line, the cover letter, and on the cover page for the enclosure.
Enclosed are the corrected pages for the "Wolf Creek Generating Station 2015 Annual Radiological Effluent Report - Report 39." This submittal is to replace Reference 2 in its entirety.
P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET
RA 18-0056 Page 2 of 2 This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4204.
Sincerely, Cynthia R. Hafenstine CRH/rlt Enclosure cc: K. M. Kennedy (NRC), w/e B. K. Singal (NRC), w/e N. H. Taylor (NRC), w/e Senior Resident Inspector (NRC), w/e
Enclosure to RA 18-0056 Corrected Pages of the Wolf Creek Generating Station 2015 Annual Radioactive Effluent Release Report - Report 39 (2 pages)
4 of57 CR 92222 - GHRT001 OB Effluent Channel A data entry error during STN SP-01 OB resulted in GHRE1 OB effluent channel being nonfunctional. A review of the low, mid and high channels during the period verified that no release setpoints were exceeded. It appears that the RM-11 screen did not update during verification per STN SP-010B.
Changes to the land use census are noted. No changes or events occurred with monitoring instruments, radwaste shipments and storage units.
33 of57 SECTION IV ADDITIONAL INFORMATION
- 1. Unplanned or Abnormal Releases CR 84942 - Investigate reporting requirements for SFP to CCW leak (Update)
There was an unplanned release of contaminated liquid in 2013 following a leak thru Spent Fuel Pool heat exchanger to component cooling water systems. A portion of the system was discharged in 2015 during Refuel 20. The remaining activity, approximately 6E-4 uCi/ml H-3, will be discharged in upcoming refueling outages as required for system maintenance using the normal effluent discharge path. For more CR details see the Additional Information portion of Section II.
- 2. Offsite Dose Calculation Manual (ODCM)
The ODCM is in the form of two separate Wolf Creek Nuclear Operating Corporation (WCNOC) administrative procedures. Enclosure I contains procedure AP 078-003, Revision 8 "Offsite Dose Calculation Manual." Enclosure II contains procedure, AP 078-004, Revision 21, "Offsite Dose Calculation Manual (Radiological Environmental Monitoring Program)."
- 3. Major Changes to Liquid, Solid, or Gaseous Radioactive Waste Treatment Systems No major changes were made to the Liquid, Solid or Gaseous Radwaste Systems in 2015 that alter the capacity or handling of Radioactive Wastes or differ in the method of treatment.
- 4. Land Use Census No changes were identified for the nearest occupied residence in each sector. Ten changes were noted for the nearest garden producing broadleaf vegetation (per AP 078-004, "Offsite Dose Calculation Manual (Radiological Environmental Monitoring Program))." There were no changes regarding milk sample locations. No locations were identified that routinely milked animals for human consumption.
- 5. Radwaste Shipments Nineteen shipments of radioactive waste occurred during this report period. Specific details regarding each shipment's mode of transportation and destination can be found in Section II, Effluent and Waste Disposal Annual Report, 2015 Solid Waste Shipments table, subsection A.3 (Solid Waste Disposition).
- 6. Functionality of Effluent Monitoring Instrumentation CR 92222 - GHRT001 OB Effluent Channel The effluent channel, 103, of the Radwaste Building Vent (RWV) GHRE1 OB, was found nonfunctional on 2-24-2015 during the preparation of a gas decay tank permit. The channel had been inoperable since 2-18-2015 following a data entry error that occurred during a scheduled calibration while performing procedure STN SP-01 OB, "Channel Operational Test Radwaste Building Vent System Radiation Monitor